ML24170A395

From kanterella
Jump to navigation Jump to search
VR-SECY-23-0033: Interim Enforcement Policy for Dispositioning 10 CFR Part 37 Violations with Respect to Large Components or Robust Structures Containing Category 1 or Category 2 Quantities of Radioactive Material at Power Reactor Facilitie
ML24170A395
Person / Time
Issue date: 06/11/2024
From: Annie Caputo
NRC/OCM
To: Carrie Safford
NRC/SECY
Shared Package
ML24170A355 List:
References
SECY-23-0033 VR-SECY23-0033
Download: ML24170A395 (4)


Text

TO:

FROM:

SUBJECT:

POLICY ISSUE NOTATION VOTE RESPONSE SHEET Carrie M. Safford, Secretary COMMISSIONER CAPUTO SECY-23-0033 Interim Enforcement Policy for Dispositioning 10 CFR Part 37 Violations with Respect to Large Components or Robust Structures Containing Category 1 or Category 2 Quantities of Radioactive Material at Power Reactor Facilities Approved X Disapproved Abstain Not Participating COMMENTS:

Below Entered in STAR Yes No Attached X

None Date

Commissioner Caputo's Comments on SECY-23-0033, "Interim Enforcement Policy for Dispositioning 10 CFR Part 37 Violations with Respect to Large Components or Robust Structures Containing Category 1 or Category 2 Quantities of Radioactive Material at Power Reactor Facilities" In SECY-23-0033, the staff has proposed the issuance of an Interim Enforcement Policy (IEP) for Dispositioning Violations with Respect to Large Components or Robust Structures Containing Category 1 or Category 2 Quantities of Radioactive Material. The staff is currently using an Enforcement Guidance Memorandum (EGM)1 to exercise enforcement discretion in certain situations where licensees cannot meet the requirements of 10 CFR 37.11 ( c ).

During the rulemaking promulgating 10 CFR Part 37, "Physical Protection of Category 1 and Category 2 Quantities of Radioactive Material," several commenters expressed concern about extending applicability for the proposed rule beyond byproduct material licensees to power reactor licensees. Specifically, the commenters stated that extending the requirements to large components or radioactive storage facilities located at power reactor plant sites appeared unwarranted. 2 The NRC acknowledged and agreed with the commenters in part however large components or robust structures were not covered under 10 CFR 37.11 exemption. After promulgation of the rule, staff issued the EGM to allow the staff to exercise enforcement discretion for certain large components and radioactive storage facilities located at power reactor plant sites. In my view, the agency missed an opportunity to address this issue during the initial rulemaking. Staff did not fully consider the impact of its resolution to the public comment and missed an opportunity to leverage the regulatory analysis to identify unintended consequences on licensees. This example demonstrates the importance of conducting a robust regulatory analysis that helps identify impacts on affected licensees and uncover unintended consequences.

Nonetheless, I approve the staff's recommendation to transition from an EGM to an IEP to address this issue since EGMs are intended to be a temporary solution and should not be used as policy vehicles. The new IEP will provide consistent guidance to inspection staff for dispositioning noncompliance issues involving large components containing Category 1 or Category 2 quantities of radioactive material, or Category 1 and Category 2 quantities of radioactive material stored in robust structures, at power reactor facilities licensed under 10 CFR Parts 50 or 52. The IEP will also allow the staff to disposition a violation using this enforcement discretion without first unnecessarily establishing an enforcement panel. Therefore, I approve the Federal Register notice and proposed IEP, subject to the attached edits.

1 Enforcement Guidance Memorandum 14-001, "Interim Guidance for Dispositioning 10 CFR Part 37 Violations with Respect to Large Components or Robust Structures Containing Category 1 or Category 2 Quantities of Material at Power Reactor Facilities Licensed Under 10 CFR Parts 50 and 52 (RIN 3150-AI 12)," dated March 13, 2014 (Agencywide Document Access and Management System Accession No. ML14056A151 ).

2 SECY-23-0033 at 2.

AXC Edits Proposed Interim Enforcement Policy - Section 9.3, "Enforcement Discretion for Physical Protection of Category 1 and Category 2 Quantities of Radioactive Material (10 CFR Part 37)"

9.3 Enforcement Discretion for Physical Protection of Category 1 and Category 2 Quantities of Radioactive Material (10 CFR Part 37)

This section sets forth the Interim Enforcement Policy (IEP) that the NRC will use to exercise enforcement discretion for certain noncompliances with the requirements of 10 CFR Part 37, "Physical Protection of Category 1 and Category 2 Quantities of Radioactive Material," involving large components containing category 1 or category 2 quantities of radioactive material, or category 1 or category 2 quantities of radioactive material stored in robust structures at power reactor facilities licensed under 10 CFR Part 50, "Demestic Licensing of Production and Utilization Facilities," or 10 CFR Part 52, "Licenses, Certifications, and Approvals for Nuclear Power Plants."

For this IEP, a large component is defined as an item weighing 2,000 kilograms or more that does not contain either discrete sources or ion-exchange resins. In this context, large components typically include steam generators, steam dryers, turbine rotors, reactor vessels, reactor vessel heads, reactor coolant pumps, and shielding blocks. Due to their size and weight, these large components are not easily moved without cranes, rigging, and heavy equipment. In addition, these large components are not easily concealed during loading or when they are in motion, and the amount of time required to steal or divert these large components is such that it is reasonable to expect that the licensee would detect these activities.

-For this IEP, a robust structure is defined as a closed concrete bunker or modular vault for which the radioactive materials contained within the structure can only be accessed using heavy equipment to remove structural components or large access blocks weighing 2,000 kilograms or more. Access to these robust structures requires significant execution time. Typically, routine work activities, observation by licensees' authorized individuals located within or close to these robust structures, or observation by licensees' authorized individuals conducted in accordance with 10 CFR 73.55(i)(5)(ii) requirements make it likely that any actual or attempted theft and diversion would be detected, considering the time needed to accomplish these activities. This IEP's definitions of "large component" and "robust structure" are identical to those used successfully for several years under Enforcement Guidance Memorandum (EGM)-14-001, "Interim Guidance for Dispositioning 10 CFR Part 37 Violations with Respect to Large Components or Robust Structures Containing Category 1 or Category 2 Quantities of Material at Power Reactor Facilities Licensed Under 10 CFR Parts 50 and 52 (RIN 3150-Al12)," dated March 13, 2014 (Agencywide Document Access and Management System (ADAMS) Accession No. ML14056A151 ), and to date have proven sufficient to address past or future violations until the underlying technical issue is dispositioned through rulemaking or other regulatory action.

Under this IEP, the NRC will typically exercise enforcement discretion and not issue a notice of violation pursuant to 10 CFR 37.11 (c)(1) and (2), "Specific exemptions," or 10 CFR Part 37 Subpart B, "Background Investigations and Access Authorization Program," Subpart C, "Physical Protection Requirements During Use," and Subpart D, "Physical Protection in Transit,"

except for violations of 10 CFR 37.43(c), "General security program requirements -Training";

10 CFR 37.45, "LLEA coordination"; 10 CFR 37.49(b), "Monitoring, detection, and assessment";

10 CFR 37.49(d), "Response"; 10 CFR 37.57, "Reporting of events"; and 10 CFR 37.81, "Reporting of events," involving robust structures containing category 1 or category 2 quantities of radioactive material, or large components containing category 1 or 2 quantities of radioactive material, if the licensee meets the following conditions:

The licensee has identified in writing those large components and robust structures that contain category 1 or category 2 quantities of radioactive material, for which it is not in compliance with 10 CFR Part 37.

The licensee has an approved 10 CFR Part 73 security plan or a written 10 CFR Part 37 security plan that provides security measures adequate to detect, assess, and respond to actual or attempted theft or diversion,__as well as a written analysis that considers the time needed to accomplish these activities given the proximity and mobility of the equipment available for those large components and robust structures identified above.

The licensee has a written analysis documenting that the measures above do not decrease the effectiveness of the 10 CFR Part 73 security plan.

An enforcement panel is not required to disposition a violation using this discretion; however, each time discretion is granted, an enforcement action number will be assigned to document the use of discretion under this IEP. This discretion is not limited to the initial inspection identifying a noncompliance and can be applied to subsequent inspections, provided that all the criteria continue to be met.

Licensees s-Aa-U-must comply with all other requirements, as applicable, unless explicitly replaced or amended through this interim poliCY--

Licensees are allowed tocan submit a request for a specific exemption, as described in 10 CFR 37.11 (a), for material that may not be included in the definitions above. If the licensee submits such a request for a component weighing 2,000 kilograms or more that does not contain either discrete sources or ion-exchange resins, or for a structure sufficiently robust that it would take significant time to access the material inside, and the request is submitted before the NRC inspects the licensee's facility, the NRC will postpone an enforcement decision until the NRC staff completes its review of the exemption request. If the NRC grants the exemption request, it will also consider enforcement discretion for any prior violation remedied by the exemption. If the NRC denies, or the licensee withdraws, the exemption request, the NRC will disposition the violation through the enforcement process.

The NRG will keep this interim policy will remain in place until the underlying technical issue is dispositioned through rulemaking or other regulatory action.