Email Transmitting Form 898 Completeness Determination
ML24163A029
Person / Time
Site: 99902069
Issue date: 06/20/2024
From: Cayetano Santos
NRC/NRR/DANU/UAL1
To: Gardner D, Peebles D
Kairos Power
References
KP-TR-024
Download: ML24163A029 (1)


Text

From:

Cayetano Santos To:

Tomkins@kairospower.com; Drew Peebles; Darrell Gardner Cc:

Brian Bettes; Matthew Hiser; Samuel Cuadrado de Jesus; Josh Borromeo; Candace de Messieres

Subject:

NRC Form 898 - KP-FHR Core Design and Analysis Methodology TR Date:

Thursday, June 20, 2024 4:55:00 PM Attachments:

NRC Form 898 Topical Report Completeness Determination_CPdM.pdf Darrell, Drew and Jim,

Attached is the completeness determination form for Kairos Power, LLC (Kairos) topical report KP-TP-024-P, KP-FHR Core Design and Analysis Methodology Topical Report, Revision 0. This report was submitted by letter dated April 3, 2024, and Kairos requested completion of the acceptance review within 60 days of receipt. The NRC staff has completed the acceptance review of KP-TR-024-P and found that the material presented is sufficient to begin a detailed technical review. As we discussed previously, the NRC staff did not complete its review within the requested timeframe to allow the staff to focus on completion of the advanced safety evaluation of Kaiross Hermes 2 construction permit application and support the associated Advisory Committee on Reactor Safeguards (ACRS) subcommittee meetings.

The NRC staff plans to issue the draft safety evaluation by July 7, 2025. If needed, the NRC staff will issue a request for additional information (RAI) by January27,2025, and request a response within 45 days. The NRC staff estimates that 1,400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> will be needed to complete the technical review. The final completion date and level of effort could change due to several factors including the need for additional RAIs, unanticipated changes in the scope of the review, and ACRS reviews. The NRC staff will communicate any changes to the review schedule or estimated hours.

If you have any questions, please feel free to contact me at 301-415-7270 or Cayetano.Santos@nrc.gov.

Docket No.: 99902069 EPID: L-2024-TOP-0013

Cayetano (Tanny) Santos Project Manager Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission