Form 3.2-1 Administrative Topics Outline Facility: Fermi 2 Date of Examination: January 2024 Examination Level: RO SRO Operating Test Number: 2024-1 Administrative Topic (Step 1)
Activity and Associated K/A (Step 2)
Type Code (Step 3)
Conduct of Operations Determine Availability of RPV Level Instruments JP-OP-802-4101-447 K/A 2.1.45, Ability to identify and interpret diverse indications to validate the response of another indication. IR 4.3 D, S/R Conduct of Operations Perform Startup Calculations JP-OP-802-4101-242 K/A 2.1.37 Knowledge of procedures, guidelines, or limitations associated with reactivity management IR 4.3 N, S/R Equipment Control HPCI System Valve and Controller Lineup Verification JP-OP-802-4101-245 K/A 2.2.15 Ability to determine the expected plant configuration using design and configuration control documentation, such as drawings, lineups or, tagouts. IR 3.9 D, S Radiation Control N/A N/A Emergency Plan Determine Exposure Limits to Protect Property in an Emergency JP-OP-802-4101-241 K/A 2.4.29, Knowledge of the emergency plan implementing procedures. IR 3.1 N, S/R
Instructions for completing Form 3.2-1, Administrative Topics Outline
- 1. For each license level, determine the number of administrative job performance measures (JPMs) and topic areas as follows:
Topic Number of JPMs RO*
SRO and RO Retakes Conduct of Operations 1 (or 2) 2 Equipment Control 1 (or 0) 1 Radiation Control 1 (or 0) 1 Emergency Plan 1 (or 0) 1 Total 4
5
- 2. Enter the associated knowledge and abilities (K/A) statement and summarize the administrative activities for each JPM.
- 3. For each JPM, specify the type codes for location and source as follows:
Location:
(C)ontrol room, (S)imulator, or Class(R)oom Source and Source Criteria:
(P)revious two NRC exams (no more than one JPM that is randomly selected from last two NRC exams)
(D)irect from bank (no more than three for ROs, no more than four for SROs and RO retakes)
(N)ew or Significantly (M)odified from bank (no fewer than one)
- Reactor operator (RO) applicants do not need to be evaluated on every topic (i.e., Equipment Control, Radiation Control, or Emergency Plan can be omitted by doubling up on Conduct of Operations), unless the applicant is taking only the administrative topics portion of the operating test (with a waiver or excusal of the other portions).
Form 3.2-1 Administrative Topics Outline Facility: Fermi 2 Date of Examination: January 2024 Examination Level: RO SRO Operating Test Number: 2024-1 Administrative Topic (Step 1)
Activity and Associated K/A (Step 2)
Type Code (Step 3)
Conduct of Operations Perform Notification of Failed Aircraft Warning Light for the 60 meter Met Tower JP-OP-802-4101-243 K/A 2.1.17, Ability to make accurate, clear, and concise verbal reports. IR 4.0 N, S/R Conduct of Operations Verify Stuck Control Rod Separation Criteria JP-OP-802-4101-244 K/A 2.1.37 Knowledge of procedures, guidelines, or limitations associated with reactivity management IR 4.6 N, S/R Equipment Control HPCI System Valve and Controller Lineup Verification JP-OP-802-4101-245 K/A 2.2.15 Ability to determine the expected plant configuration using design and configuration control documentation, such as drawings, lineups or, tagouts. IR 4.3 D, S Radiation Control Approve a Discharge Permit JP-OP-802-4101-409 2.3.6 Ability to approve liquid or gaseous release permits. IR 3.8 D, S/R Emergency Plan Determine Affected Sectors and Evacuation Time for PARs JP-OP-802-4101-407 K/A 2.4.44 Knowledge of emergency plan implementing procedures protective action recommendations (SRO Only) IR 4.4 D, S/R
Instructions for completing Form 3.2-1, Administrative Topics Outline
- 1. For each license level, determine the number of administrative job performance measures (JPMs) and topic areas as follows:
Topic Number of JPMs RO*
SRO and RO Retakes Conduct of Operations 1 (or 2) 2 Equipment Control 1 (or 0) 1 Radiation Control 1 (or 0) 1 Emergency Plan 1 (or 0) 1 Total 4
5
- 2. Enter the associated knowledge and abilities (K/A) statement and summarize the administrative activities for each JPM.
- 3. For each JPM, specify the type codes for location and source as follows:
Location:
(C)ontrol room, (S)imulator, or Class(R)oom Source and Source Criteria:
(P)revious two NRC exams (no more than one JPM that is randomly selected from last two NRC exams)
(D)irect from bank (no more than three for ROs, no more than four for SROs and RO retakes)
(N)ew or Significantly (M)odified from bank (no fewer than one)
- Reactor operator (RO) applicants do not need to be evaluated on every topic (i.e., Equipment Control, Radiation Control, or Emergency Plan can be omitted by doubling up on Conduct of Operations), unless the applicant is taking only the administrative topics portion of the operating test (with a waiver or excusal of the other portions).