Email - RAI Dates - Revised Schedule - Terrapower TR - (DBA) Methodology for In-Vessel Events Without Radiological Release (L-2023-TOP-0050)
ML24145A056
Person / Time
Site: 99902100
Issue date: 05/22/2024
From: Brusselmans R
NRC/NRR/DANU/UAL1
To: Kellenberger N
TerraPower
References
L-2023-TOP-0050
Download: ML24145A056 (1)


Text

From:

Ian Gifford To:

Roel Brusselmans Cc:

Deion Atkinson; Stephanie Devlin-Gill (She/Her); Mallecia Sutton; Patrick Donnelly; Ryan Sprengel; Josh Borromeo; Nick Kellenberger

Subject:

[External_Sender] RE: Revised Schedule: TerraPower TR "[DBA] Methodology for In-Vessel Events without Radiological Release" (L-2023-TOP-0050)

Date:

Wednesday, May 22, 2024 12:08:11 Good afternoon Roel,

TerraPower concurs with the proposed RAI due date change to 7/10/2024.

Thanks, Ian

From: Roel Brusselmans <Roel.Brusselmans@nrc.gov>

Sent: Wednesday, May 22, 2024 12:02 PM To: Nick Kellenberger <nkellenberger@terrapower.com>

Cc: Deion Atkinson <Deion.Atkinson@nrc.gov>; Stephanie Devlin-Gill (She/Her) <Stephanie.Devlin-Gill@nrc.gov>; Mallecia Sutton <Mallecia.Sutton@nrc.gov>; Ian Gifford <igifford@terrapower.com>;

Patrick Donnelly <pdonnelly@terrapower.com>; Ryan Sprengel <rsprengel@terrapower.com>; Josh Borromeo <Joshua.Borromeo@nrc.gov>

Subject:

Revised Schedule: TerraPower TR "[DBA] Methodology for In-Vessel Events without Radiological Release" (L-2023-TOP-0050)

CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.

Hi Nick,

As discussed previously, the NRC is proposing to change the agencys RAI due date for the

"[DBA] Methodology for In-Vessel Events without Radiological Release" topical report. The NRC is proposing to move the date from 6/7/2024 to 7/10/2024.

The revised RAI due date assumes that the audit exit occurs by 6/28/2024.

This email, along with TerraPowers response, will be added to the NRCs Agencywide Documents Access and Management System (ADAMS) and will be made publicly available.

Please reply in concurrence to this change in RAI due date.

Regards, Roel

Roel Brusselmans Project Manager U.S. NRC, NRR, DANU, UAL1

w. (301) 415-0829