Public Meeting Summary of April 9, 2024 - Fuel Cycle Construction Inspection Program Public Meeting
ML24114A287
Person / Time
Issue date: 04/24/2024
From: Fuentes L
NRC/RGN-II
To: Nicole Coovert
NRC/RGN-II
References
Download: ML24114A287 (5)


Text

MEMORANDUM TO: Nicole Coovert, Acting Director Division of Construction Oversight Region II FROM: Luis Colon Fuentes, Construction Inspector Division of Construction Oversight Region II

SUBJECT:

PUBLIC MEETING

SUMMARY

OF APRIL 9, 2024, FUEL CYCLE CONSTRUCTION INSPECTION PROGRAM PUBLIC MEETING The staff of the U.S. Nuclear Regulatory Commission (NRC) conducted a hybrid meeting (in-person and virtual via Microsoft Teams) with representatives of the Nuclear Energy Institute (NEI), licensees and applicants in the fuel facility industry, and members of the public on April 9, 2024. The purpose of the meeting was for the NRC staff to meet with NEI, the nuclear fuel facility industry, and stakeholders to discuss feedback received during the January 11, 2024, public meeting and how it is considered for proposed revisions of inspection guidance, and tabletop examples of potential inspection activities/attributes for management measures during construction and operational readiness reviews (ORRs).

The public meeting notice with the agenda, and the meeting presentations are available in the Agencywide Documents Access and Management System (ADAMS) under Accession Numbers:

ML24095A111, and ML24095A057.

Meeting Summary:

The meeting began with the NRC providing an overview of the meetings purpose and logistics. Opening remarks were made by Shana Helton, Director, Office of Nuclear Material Safety and Safeguards (NMSS), Division of Fuel Management.

After opening remarks, the NRC staff provided a series of presentations followed by question-and-answer sessions. The presentations covered the NRCs response to several feedback topics from the January 11, 2024, public meeting. The topics pertained to safety significant items and services, timing and development of principal inspection plan, comments on construction inspection procedures (IPs),

and implementation of management measures (MMs) during construction and ORRs.

Closing remarks were given by Anthony Masters, Director, Division of Fuel Facility Inspection (DFFI),

Region II.April 24, 2024 Signed by Colon Fuentes, Luis on 04/24/24

N. Coovert 2

Below is a summary of topics discussed by the staff:

  • Definition of major modifications for existing licensees and estimate of inspection hours.
  • Use of the term at-risk open items during at-risk construction activities.
  • Safety significant items and services as it pertains to regulatory requirements in a license, including integrated safety analysis and items relied on for safety (IROFS) language.
  • Timing and development of principal inspection plan with respect to start of at-risk construction and major modifications.
  • Several clarifications pertaining to the construction IPs that were presented, during the public meeting, on January 11, 2024.
  • Implementation of MMs during construction verses operations and applicable NRC inspections; specifically, how MMs relate to construction of IROFS, flow down of MMs to subcontractors, and training and qualifications MMs during construction verses IROFS training requirements for operators, as applicable.
  • New ORR IPs with transparent fee-billing reporting and licensee readiness for ORR inspections.

In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRC's Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact Nicole Coovert at (404) 997-4510.

Enclosure:

List of Attendees N. Coovert 3

SUBJECT:

SUMMARY

OF APRIL 9, 2024, FUEL CYCLE CONSTRUCTION INSPECTION PROGRAM PUBLIC MEETING DATED APRIL 24, 2024

DISTRIBUTION:

S. Helton, NMSS A. Masters, RII/DFFI

ADAMS ACCESSION NUMBER: ML24114A287 X Non-Sensitive X Publicly Available X SUNSI Review Sensitive Non-Publicly Available

OFFICE RII/DCO RII/DCO NAME A. Ponko L. Colon Fuentes DATE 4/24/2024 4/24/2024 LIST OF ATTENDEES This list of Attendees was captured via the in-person and virtual attendance sheets:

Name Organization Daniel Ashworth BWXT Kelly L. Fitch Centrus Energy Brandon Hanson Framatome Calvin Manning Framatome Timothy Tate Framatome Tom Galioto Framatome Vince Gallacher Framatome Scott P. Murray General Electric Vernova Charles Patterson Honeywell Robert Sanders Honeywell Jack Britt Nuclear Energy Institute Janet Schlueter Nuclear Energy Institute Ashley Morris Nuclear Fuel Services Andrea Jennetta S&P Global Jennifer Wheeler Triso-X Chris Schwarz Urenco USA Wyatt Padgett Urenco USA Camille T. Zozula Westinghouse Kevin Pigg Westinghouse Stephen G. Subosits Westinghouse Gerard Couture No Organization Provided Jim Tomkins No Organization Provided Luca No Organization Provided S. Steuer No Organization Provided Tim Knowles No Organization Provided Anthony Masters NRC Anthony Ponko NRC Benjamin Karmiol NRC Bradley Davis NRC Chad Oelstrom NRC Cinthya Roman NRC Cynthia Taylor NRC Dave Gasperson NRC Diana Woodyatt NRC Eric C. Michel NRC George Khouri NRC Hector Rodriguez NRC James Downs NRC Jennifer Guillard NRC Jenny Tobin NRC

Enclosure Jonathan Rowley NRC Joseph Rudd NRC Joylynn Quinones-Navarro NRC Justin Raudabaugh NRC Kelly Sullivan NRC Laura Dudes NRC Marilyn Diaz Maldonado NRC Mark Miller NRC Matt Bartlett NRC Nicole Coovert NRC Noel Pitoniak NRC Osiris Siurano-Perez NRC Robert Mathis NRC Robert Williams NRC Shana Helton NRC Thomas Vukovinsky NRC Yawar Faraz NRC