ML24101A063
ML24101A063 | |
Person / Time | |
---|---|
Site: | Prairie Island |
Issue date: | 04/09/2024 |
From: | Conboy T Northern States Power Co, Xcel Energy |
To: | Office of Nuclear Reactor Regulation, Document Control Desk |
References | |
L-Pl-24-024 | |
Download: ML24101A063 (1) | |
Text
1717 Wak o nad e Drive fl Xcel Energy Welch, MN 55089
April 09, 2024 L-Pl-24-024 10 CFR 21.21 (a)(2)
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Prairie Island Nuclear Generating Plant, Units 1 and 2 Docket Nos. 50-282 and 50-306 Renewed Facility Operating License Nos. DPR-42 and DPR-60
Interim Report of a Potential Deviation or Failure to Comply Associated with Bentley Systems Incorporated AutoPIPE Software (Update)
This letter is a follow-up to the interim report L-Pl-24-007 submitted on February 09, 2024 (ADAMS Accession number ML24040A171) by Northern States Power Company, a Minnesota Corporation, (NSPM), doing business as Xcel Energy, pursuant to 10 CFR 21.21 (a)(2).
NSPM's evaluation of whether the identified error in the AutoPIPE software could create a substantial safety hazard is ongoing. Actions to complete this evaluation are being tracked in the NSPM Corrective Action Program. NSPM is currently working with a vendor to perform an assessment of the calculations to determine which ones could potentially be impacted by the software error. The identified calculations by both NSPM and the vendor will be further evaluated to determine the impact of the error. NSPM estimates the required 10 CFR Part 21 evaluation will be completed by June 30, 2024 for both the Prairie Island Nuclear Generating Plant and the Monticello Nuclear Generating Plant.
If there are any questions or if additional information is needed, please contact Nathan Fedora, Senior Nuclear Regulatory Engineer at (612) 342-8971 or nathan.a.fedora@xcelenergy.com.
Summary of Commitments
This letter makes no new commitments and no revisions to existing commitments.
Thomas A. Conboy Site Vice President, Prairi nd Nuclear Generating Plant Northern States Power Company - Minnesota
cc: Administrator, Region 111, USNRC Project Manager, Prairie Island, USNRC Resident Inspector, Prairie Island, USNRC