ML24099A153
| ML24099A153 | |
| Person / Time | |
|---|---|
| Site: | Vallecitos Nuclear Center |
| Issue date: | 04/08/2024 |
| From: | Murray S GE-Hitachi Nuclear Energy Americas |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| References | |
| M240067 | |
| Download: ML24099A153 (1) | |
Text
HITACHI M240067 April 8, 2024 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-001 GE Hitachi Nuclear Energy Scott P. Murray Manager, Facility Licensing 3901 Castle Hayne Road P.O. Box 780 Wilmington, NC 28402 USA T (910) 819-5950 scott.murray@ge.com 10 CFR 50.90
Subject:
GEH Possession Only License Shutdown Configuration of the GE Nuclear Test Reactor (NTR)
References:
- 1)
NRC License R-33, Docket 0500073, General Electric Hitachi (GEH) Nuclear Test Reactor (NTR)
- 2)
GEH License Amendment Request - Permanent Cessation of the GE Nuclear Test Reactor (NTR) and Possession Only Authorization, 10/6/23 (M L23279A 11 O)
- 3)
Letter, S. Murray (GEH) to NRC Document Control Desk, GEH License Amendment Request Modification - Permanent Cessation of the NTR and Possession Only Authorization, 2/12/24 (ML24043A044)
- 4)
Letter, G. Wertz (NRC) to C. Martinez (GEH), Issuance of Amendment 26 Re:
Possession Only Authorization of Reactor Operating License R-33 for the NTR, 2/28/24 (ML24031A622)
NRC License R-33 Possession Only Authorization Amendment 26 (Reference 4) requires the amendment to be implemented within 60 days of issuance.
The purpose of this letter is to notify NRC that GE Hitachi Nuclear Energy Americas LLC (GEH) has implemented the amendment and completed the required shutdown configuration actions.
Please contact me If you have any questions regarding this notice.
I declare under penalty of perjury that the foregoing is true and correct.
Sincerely, s1~/Jt~
Facility Licensing cc: NRC Region IV Administrator J. D. Parrott, USNRC/NMSS/DUWP/RDB J. M. Borromeo, Branch Chief, USNRC/NRR/DANU/UNPL G. A. Wertz, USNRC/NRR/DANU/UNPL SPM 24-023