ML24085A822
From kanterella
Jump to navigation
Jump to search
Letter Sequence Request | |
|---|---|
EPID:L-2024-TOP-0010, (Open) | |
Initiation
Administration Questions
Results Other: ML24107B050, ML24107B051, ML24107B062, ML24197A184, ML24267A221, ML25206A228, ML25206A231, ML25210A320, ML25210A321, ML25252A419, ML25252A423, ML25253A042, ML25253A075 | |
MONTHYEARML24085A8222024-03-26026 March 2024
[Table View]Transmittal of Terrapower, LLC Partial Flow Blockage Methodology, Revision 0 Project stage: Request ML24107B0512024-04-22022 April 2024 Email - Completeness Determination for Terrapower, LLC Partial Flow Blockage Methodology, Revision 1 (L-2024-TOP-0010) Project stage: Other ML24107B0502024-04-22022 April 2024 NRC Form 898 - Completeness Determination for Terrapower, LLC Partial Flow Blockage Methodology, Revision 1 (L-2024-TOP-0010) Project stage: Other ML24197A1842024-07-15015 July 2024 Public - Terrapower, LLC - Audit Plan for Topical Report TP-LIC-RPT-0008, Partial Flow Blockage Methodology, Revision 1 Project stage: Other ML24267A2212024-09-24024 September 2024 NRC Form 897: Request for Withholding Proprietary Information from Public Disclosure - Terrapower, LLC Topical Report, Partial Flow Blockage Methodology, Revision 1 Project stage: Other ML24107B0622024-09-24024 September 2024 NRC Form 897: Request for Withholding Proprietary Information from Public Disclosure - Terrapower, LLC Topical Report, Partial Flow Blockage Methodology, Revision 1 Project stage: Other ML25206A2312025-07-25025 July 2025 Email: Request for Withholding Proprietary Information from Public Disclosure - Terrapower, LLC Topical Report, NAT-9395 Partial Flow Blockage Methodology, Revision 0 Project stage: Other ML25206A2282025-07-25025 July 2025 NRC 897: Request for Withholding Proprietary Information from Public Disclosure - Terrapower, LLC, Topical Report, NAT-9395 Partial Flow Blockage Methodology, Revision 0 Project stage: Other ML25210A2062025-08-0707 August 2025 P Enclosuterrapower, Llc. - Final Safety Evaluation of Topical Report Nat-9395, Partial Flow Blockage Methodology, Revision 0 Project stage: Approval ML25210A2042025-08-0707 August 2025 Letter: Terrapower, Llc. - Final Safety Evaluation of Topical Report Nat-9395, Partial Flow Blockage Methodology, Revision 0 Project stage: Approval ML25210A3212025-08-26026 August 2025 P Enclosuterrapower, LLC - Summary Report on the Regulatory Audit of Topical Report, TP-LIC-RPT-0008, Partial Flow Blockage Methodology, Revision 1 Project stage: Other ML25210A3202025-08-26026 August 2025 Letter: Terrapower, LLC - Summary Report on the Regulatory Audit of Topical Report, TP-LIC-RPT-0008, Partial Flow Blockage Methodology, Revision 1 Project stage: Other ML25253A0752025-09-10010 September 2025 Email - Request for Withholding Proprietary Information from Public Disclosure - Terrapower, LLC, NAT-9395-A, Revision 0, Partial Flow Blockage Project stage: Other ML25253A0422025-09-10010 September 2025 NRC 897 - Request for Withholding Proprietary Information from Public Disclosure - Terrapower, LLC, NAT-9395-A, Revision 0, Partial Flow Blockage Project stage: Other ML25252A4232025-09-10010 September 2025 NRC 896 - a Verification of Terrapower, LLC, NAT-9395-A, Partial Flow Blockage Methodology, Revision 0 Project stage: Other ML25252A4192025-09-19019 September 2025 NRC 896 - a Verification of Terrapower, LLC NAT-9394-A, Design Basis Accident Methodology for Events with Radiological Release, Revision 0 Project stage: Other 2025-07-25 |
| ML24085A822 | |
| Person / Time | |
|---|---|
| Site: | 99902100 |
| Issue date: | 03/26/2024 |
| From: | Sprengel R TerraPower |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| Shared Package | |
| ML24085A821 | List: |
| References | |
| TP-LIC-RPT-0008 | |
| Download: ML24085A822 (1) | |
Similar Documents at 99902100 | |
|---|---|
Retrieved from "https://kanterella.com/w/index.php?title=ML24085A822&oldid=5526113"