ML24051A116

From kanterella
Jump to navigation Jump to search
Acknowledgement Email of Framatome 2024 Submittal for Facility Changes and ISA Summary
ML24051A116
Person / Time
Site: Framatome ANP Richland
Issue date: 02/06/2024
From: Stephen Poy
NRC/NMSS/DFM/FFLB
To: Timothy T
Framatome
References
Download: ML24051A116 (1)


Text

From: Stephen Poy To: TATE Timothy (Framatome)

Cc: Joseph Goodridge; Osiris Siurano-Perez; Samantha Lav (She/Her/Hers); Gregg Goff; Cynthia Taylor; Eric C.

Michel; MANNING Calvin (Framatome)

Subject:

Acknowledgement of Receipt of Framatome"s Annual ISA Summary Update and Summary of Calendar Year 2024 Date: Tuesday, February 6, 2024 11:04:00 AM

Mr.Tate:

This is to acknowledge receipt of your submittals dated January 25, 2024, transmitting Framatomes Integrated Safety Analysis Summary Annual Update (Agencywide Documents Access and Management System [ADAMS] Accession Number ML24025C693), and Framatomes Summary of Facility Changes Made during Calendar Year (CY) 2023 (ADAMS Accession Number ML24025C730).

The staff from the Office of Nuclear Material Safety and Safeguards, Division of Fuel Management, completed a preliminary review and referred your submittal to the U.S.

Nuclear Regulatory Commission (NRC) Region 2 inspection staff for further evaluation and follow-up, as needed.

Regarding the Summary of the CY 2023 Facility Changes, as discussed in Staff Requirements Memorandum for SECY-16-0009, Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities (ADAMS Accession Number ML16104A158), the NRC licensing staff is no longer performing detailed reviews of such changes. Therefore, we are referring the CY 2023 Facility Changes to the NRC inspection staff for an evaluation of the changes during a future inspection of your facilitys licensed activities. Please note that no cost activity code is being assigned to this action.

In accordance with Title 10 of the Code of Federal Regulations, Section 2.390, Public inspections, exemptions, requests for withholding, of the NRCs Agency Rules of Practice and Procedure, a copy of this communication will be available electronically for public inspection in the NRC Public Document Room or from ADAMS. The ADAMS database is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html.

If you have any questions regarding this matter, please contact me.

Thanks.

Stephen Poy Project Manager Fuel Facility Licensing Branch Division of Fuel Management OfficeofNuclear Material SafetyandSafeguards U.S. Nuclear Regulatory Commission Tel: (301) 415-7827@nrc.gov Email: stephen.poy