Davis-Besse Initial License Exam 2024 Admin JPM RO-A1.1
Job Performance Measure Form 3.2-3 Worksheet Admin JPM RO-A1.1 Page 1 of 5 Examinee:
Date:
Examiner:
Facility: Davis-Besse JPM No: OPS-JPM-316 Task
Title:
Calculate Steam Generator Tube Leak Rate Task No: 000-044-05-0100 System:
K/A
Reference:
2.1.19 (3.9) R3 Safety Function:
Time Critical Task: No Alternate Path:
Validation Time:
15 minutes Method of testing:
Simulated Performance ___
Actual Performance _X_
Classroom _X_
Simulator ___
Plant ___
Task Standard:
Determine SG Tube leak rate Required Materials:
DB-OP-02531 R25 Attachment 1, RCS Leak Rate Calculation Pictures of RE 1003A and RE 1003B Chemistry Data Sheet Calculator General
References:
None Notes:
None Initiating Cue:
The Initiating Cues are specified in the Examiner/Student Copy Performance Measure pages.
Job Performance Measure Form 3.2-3 Worksheet Admin JPM RO-A1.1 Page 2 of 5 EXAMINER COPY INITIAL CONDITIONS:
The unit is at 100% power SG 1 has a tube leak Pressurizer level is 220 inches and steady The Computer Calculation for RCS Leakage is NOT available EO reports Steam Jet Air Ejector flow is 15 scfm INITIATING CUE:
The Shift Manager directs you to manually calculate the leak rate.
REFER TO DB-OP-02531, STEAM GENERATOR TUBE LEAK
- , RCS LEAK RATE CALCULATION Section 4, Leak Rate Estimation Using RE 1003A, OR RE 1003B Provide the examinee a copy of DB-OP-02531 Attachment 1, RCS Leak Rate Calculation Pictures of RE 1003A and RE 1003B Chemistry Data Sheet
Job Performance Measure Form 3.2-3 Worksheet Admin JPM RO-A1.1 Page 3 of 5 CANDIDATE COPY INITIAL CONDITIONS:
The unit is at 100% power SG 1 has a tube leak Pressurizer level is 220 inches and steady The Computer Calculation for RCS Leakage is NOT available EO reports Steam Jet Air Ejector flow is 15 scfm INITIATING CUE:
The Shift Manager directs you to manually calculate the leak rate.
REFER TO DB-OP-02531, STEAM GENERATOR TUBE LEAK
Job Performance Measure Form 3.2-3 Worksheet Admin JPM RO-A1.1 Page 4 of 5 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is assumed unless denoted in the "Comments".
START TIME:
- 1.
PERFORMANCE STEP: Record Date and time STANDARD: Correct date and time used CUE: None SAT UNSAT
- 2.
PERFORMANCE STEP: Record Steam Jet Air Ejector radiation levels
........C........
STANDARD: Correctly read RE 1003A (1.02E4 cpm) and RE 1003B (3.97E3 cpm)
CUE: None SAT UNSAT
- 3.
PERFORMANCE STEP: Convert RE readings (cpm) to Ci/cc
........C........
STANDARD: Correctly multiply SJAE reading by conversion factor:
RE 1003A = 6.63E-05 Ci/cc RE 1003B = 1.27E-04 Ci/cc COMMENT: Acceptable Range RE 1003A = 6.6E-05 to 6.7E-05Ci/cc RE 1003B = 1.2E-04 to 1.3E-04Ci/cc CUE: None SAT UNSAT
Job Performance Measure Form 3.2-3 Worksheet Admin JPM RO-A1.1 Page 5 of 5
- 4.
PERFORMANCE STEP: Record Steam Jet Air Ejector (SJAE) flow from FI1002
........C........
STANDARD: Correctly record 15 scfm, as given in the initial cue by an EO CUE: None SAT UNSAT
- 5.
PERFORMANCE STEP: Record the latest RCS Xe-133 activity from Chemistry
........C........
STANDARD: Refers to the Chemistry Data Sheet, correctly record RCS Xe-133 activity (6.66E-03 Ci/cc)
CUE: None SAT UNSAT
- 6.
PERFORMANCE STEP: Calculate primary-to-secondary tube leak using RE 1003B
........C........
STANDARD: Correctly calculate tube leak using RE 1003B (2.14 gpm)
COMMENT: Acceptable Range 2 to 2.2 gpm CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examinee)
END TIME_________
Davis-Besse Initial License Exam 2024 Admin JPM RO-A1.2
Job Performance Measure Form 3.2-3 Worksheet Admin JPM RO-A1.2 Page 1 of 5 Examinee:
Date:
Examiner:
Facility: Davis-Besse JPM No: OPS-JPM-276 Task
Title:
Perform 1/M Plot Task No:
115-033-01-0100 System:
K/A
Reference:
2.1.43 (4.1)
Safety Function:
Time Critical Task: No Alternate Path:
Validation Time: 15 minutes Method of testing:
Simulated Performance ___
Actual Performance X Classroom X Simulator ___
Plant ___
Task Standard:
Perform the calculations and 1/M Plot and recommend no further rod withdrawal.
Also, acceptable to recommend inserting Control Rod Groups 2-7 Required Materials:
DB-OP-06912 R22, Approach to Criticality Straight edge Calculator General
References:
None Notes:
None Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Initiating Cue:
The Initiating Cues are specified in the Examiner/Student Copy Performance Measure pages.
Job Performance Measure Form 3.2-3 Worksheet Admin JPM RO-A1.2 Page 2 of 5 EXAMINER COPY INITIAL CONDITIONS:
The Plant is in Mode 2.
A reactor startup is in progress.
Group 1-4 rods are withdrawn Regulating Rods are pulled to 100 Rod Index INITIATION CUE:
The Shift Manager directs you to perform a peer check of the Reactor Engineer performing the 1/M Plot by performing a separate 1/M Plot using the Source Range count rate data provided on of DB-OP-06912, Approach to Criticality.
Compare the 1/M data with the predicted ECP data Make a recommendation for further rod withdrawal.
Document recommendation below.
(Hand Candidate a copy of DB-OP-06912, Approach to Criticality, Calculator, and a Straight Edge)
Job Performance Measure Form 3.2-3 Worksheet Admin JPM RO-A1.2 Page 3 of 5 CANDIDATE COPY INITIAL CONDITIONS:
The Plant is in Mode 2.
A reactor startup is in progress.
Group 1-4 rods are withdrawn Regulating Rods are pulled to 100 Rod Index INITIATION CUE:
The Shift Manager directs you to perform a peer check of the Reactor Engineer performing the 1/M Plot by performing a separate 1/M Plot using the Source Range count rate data provided on of DB-OP-06912, Approach to Criticality.
Compare the 1/M data with the predicted ECP data Make a recommendation for further rod withdrawal Document recommendation below.
Job Performance Measure Form 3.2-3 Worksheet Admin JPM RO-A1.2 Page 4 of 5 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT required unless denoted in the "Comments".
START TIME: ___________
- 1.
PERFORMANCE STEP:
Refer to data on Attachment 1 STANDARD:
Refer to data on Attachment 1 for count rate data CUE:
None SAT UNSAT
- 2.
PERFORMANCE STEP:
........C........
Plots data SR data on 1/M Plot STANDARD: Evaluates count rate data on attachment 1 and plots this data on the 1/M Plot for 25, 50, 75, and 100 Rod Index COMMENTS: Calculated 1/M values are critical 25:.92 50:.76 75:.52 100:.16 Predicted Critical Positions on Answer Key are not critical CUE:
None SAT UNSAT
- 3.
PERFORMANCE STEP:
........C........
Evaluate 1/M Plot data STANDARD:
- Plot the 1/M by connecting the last two data points on the graph and extending the line down to meet the horizontal (Rod index) axis.
- Determines that the 1/M Plot predicts criticality before reaching the Lower Rod Index limit of the ECP listed as 125 (- 0.5%k/k)
CUE:
None SAT UNSAT
Job Performance Measure Form 3.2-3 Worksheet Admin JPM RO-A1.2 Page 5 of 5
- 4. PERFORMANCE STEP:
........C........
Notify SRO that the 1/M Plot predicts criticality before reaching the Lower Rod Index limit of the ECP and recommend no further rod withdrawal.
STANDARD:
Notify SRO that the 1/M Plot predicts criticality before reaching the Lower Rod Index limit of the ECP and recommend no further rod withdrawal.
May also recommend inserting Control Rod Groups 2-7.
CUE:
None - Verify that the candidate makes the recommendation for no further rod withdrawal or ask a follow-up question.
SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by examinee).
END TIME: ____________
Davis-Besse Initial License Exam 2024 Admin JPM RO-A2
Job Performance Measure Form 3.2-3 Worksheet Simulator JPM A2 Page 1 of 5 Examinee:
Date:
Examiner:
Facility: Davis-Besse JPM No: OPS-JPM-NEW (335)
Task
Title:
Perform a Leak Isolation Task No: 119-035-0100 System: 008 Component Cooling Water System K/A
Reference:
G2.2.15 (3.9) R3 Safety Function:
Time Critical Task: No Alternate Path: No Validation Time: 25 minutes Method of testing / Location:
Simulated Performance ___
Actual Performance X Classroom _X__
Simulator Plant ___
Task Standard:
Identify valves to isolate a CCW break using mechanical prints Required Materials:
OS Drawings Book OS21 Sheet 1 - Operational Schematic Component Cooling Water System (Rev. 39)
OS21 Sheet 3 - Operational Schematic Component Cooling Water System (Rev. 12)
(24in X 36in)
Magnifying Glass Highlighter DB-OP-06262 one copy made available if asked for General
References:
None Notes:
This Admin JPM is a 2-part JPM and will require two classrooms to facilitate it.
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Initiating Cue:
The Initiating Cues are specified in the Examiner/Student Copy Performance Measure pages.
Job Performance Measure Form 3.2-3 Worksheet Simulator JPM A2 Page 2 of 5 EXAMINER COPY INITIAL CONDITIONS:
All plant systems are in a normal alignment.
Component Cooling Water (CCW) Pump 1 is running.
Component Cooling Water (CCW) Pump 2 is in STBY.
CCW Pump 3 is lined-up Spare as Pump 2 The Control Room receives a call reporting a leak from the CCW System located on the inlet weld to the Component Cooling Heat Exchanger 1-1.
INITIATING CUES:
The crew has completed the following items Started CCW Pump 2 Stopped CCW Pump 1 Entered DB-OP-02523, CCW System Malfunctions Opened DW2643, CCW Surge Tank Demin Water Makeup Valve to maintain normal CCW Surge Tank level You are a Spare Reactor Operator.
The Unit Supervisor directs you to identify the valves required to isolate the leak.
List valves required for isolation on this page.
(Provide examinee with a set of Operational Schematics)
Job Performance Measure Form 3.2-3 Worksheet Simulator JPM A2 Page 3 of 5 CANDIDATE COPY INITIAL CONDITIONS:
All plant systems are in a normal alignment.
Component Cooling Water (CCW) Pump 1 is running.
Component Cooling Water (CCW) Pump 2 is in STBY.
CCW Pump 3 is lined-up Spare as Pump 2 The Control Room receives a call reporting a leak from the CCW System located on the inlet weld to the Component Cooling Heat Exchanger 1-1.
INITIATING CUES:
The crew has completed the following items Started CCW Pump 2 Stopped CCW Pump 1 Entered DB-OP-02523, CCW System Malfunctions Opened DW2643, CCW Surge Tank Demin Water Makeup Valve to maintain normal CCW Surge Tank level You are a Spare Reactor Operator.
The Unit Supervisor directs you to identify the valves required to isolate the leak.
List valves required for isolation on this page.
Job Performance Measure Form 3.2-3 Worksheet Simulator JPM A2 Page 4 of 5 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
START TIME: ________
- 1.
PERFORMANCE STEP: Identify prints needed.
........C........
STANDARD: Identifies correct print for where the CCW System leak is located:
OS-021 SH 1.
CUE: None SAT UNSAT
- 2.
PERFORMANCE STEP: Identify valves required to isolate CCW leak.
........C........
STANDARD: Uses identified prints to stop and isolate CCW leak.
Close CC32, CCW Heat Exchanger 1 Outlet Butterfly Close CC1, CCW Pump 1 Suction Butterfly Valve NOTE: Other components/actions may be identified for equipment protection such as CCW Pump 1, HPI and LPI train 1 pumps, or EDG 1, these are to be treated as NON-CRITICAL.
CUE: Once the candidate identifies the equipment that must be manipulated, role play as the Unit Supervisor as required.
IF the isolation plan includes CC1, The operator in the field is unable to close CC1 and the CCW leak continues. Identify additional components which MUST be manipulated to isolate the CCW leak.
IF the candidate has already expanded the isolation points, evaluate the boundary to ensure the leak has been isolated (See JPM Step 3).
SAT UNSAT
Job Performance Measure Form 3.2-3 Worksheet Simulator JPM A2 Page 5 of 5
- 3.
PERFORMANCE STEP: Identify valves required to isolate CCW leak
........C........
STANDARD: Uses identified prints to isolate CCW leak.
NOTE: Other components may be identified, if that is the case, these are to be treated as NON-CRITICAL portions of this step.
NOTE: The following valves are not required to be listed for the following reasons.
- The Non-Essential valves will Auto Transfer. CC5095, CC5097, and CC2645 will Auto close when CCW Pump 1 is stopped.
- SW233, CC121, CC662, CC244 are Normally Closed (NC) valves.
- When CCW Pump 3 is aligned as 2, CC35 and CC4 are NC.
- CC248, CCW Corrosion Test Piping Line 1 Outlet Isolation is not a credible pressure source. This line is normally fed from CCW Train 1 discharge header.
However, with CCW Pump 1 off, there could be backflow from MUP 1 Cooler, through a throttled valve (CC129), HPI 1 Bearing, test coupons, small diameter piping, and elevation changes.
The following identify the additional MINIMUM valves to be closed to isolate the leak based on CC1 failing to close.
- CC123, CCW Surge Tank Isolation (from Sheet 3)
- CC172, CCW From Decay Heat Cooler 1 Outlet Iso
- CC243, CTMT Gas Analyzer 1 Normal Source Outlet The following identify the MINIMUM valves to be closed to isolate the leak if CC32 was NOT used as an isolation.
- CC156, CCW to Decay Heat Cooler 1 Inlet Iso
- CC239, Containment Gas Analyzer 1 Normal Source Inlet CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examinee)
END TIME:
Davis-Besse Initial License Exam 2024 Admin JPM RO-A3
Job Performance Measure Form 3.2-3 Worksheet Admin JPM RO-A3 Page 1 of 5 Examinee:
Date:
Examiner:
Facility: Davis-Besse JPM No: OPS-JPM-305 Task
Title:
Stay Time Calculation Task No: 115-035-01-0100 System:
K/A
Reference:
2.3.12 (3.2)
Safety Function:
Time Critical Task: No Alternate Path:
Validation Time: 20 minutes Method of testing:
Simulated Performance ___
Actual Performance X Classroom X Simulator ___
Plant ___
Task Standard:
Determine the total dose received and the time required to receive an EAD Dose Alarm.
Required Materials:
Survey Map DB-M-2018-TRG Calculator General
References:
None Notes:
None Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Initiating Cue:
The Initiating Cues are specified in the Examiner/Student Copy Performance Measure pages.
Job Performance Measure Form 3.2-3 Worksheet Admin JPM RO-A3 Page 2 of 5 EXAMINER COPY INITIAL CONDITIONS:
The plant is in procedure DB-OP-02527 Loss of Decay Heat Removal Refer to the Decay Heat Pump area Rad Pro Survey Map.
You are to stage yourself inside the radiologically controlled area while awaiting directions.
You are to remain in the area identified on the survey map with the lowest possible dose during the wait time.
Your task will be to vent Decay Heat Pump 2 using vent valve DH56, DH PUMP 2 CASING VENT when directed.
Your RWP has the following limits:
- Dose Rate Alarm = 75 mrem/hr
- Dose Alarm = 40 mrem Aux Building 545 ECCS Room 2 is posted as a Radiation Area Time line:
0800 - You enter ECCS Room 2 room and wait in the area identified on the survey map with the lowest possible dose 0830 - Wait time is complete, you start venting Decay Heat Pump 2 0855 - Venting is complete, you immediately exit the room and report back to the CTRM INITIATING CUE:
Based upon the above timeline, the information from your RWP and the Aux Building 545 ECCS Room 2 survey map:
- 1.
Determine the total amount of dose that was received from room entry to exit. Use the highest potential dose rate in the area of the pump in determining your dose for the actual venting portion of the entry.
- 2.
Assuming no dose was received until you entered ECCS Room 2, determine the MAXIMUM time (including the wait time) you could take to vent the Decay Heat Pump 2 until you would receive an EAD Dose Alarm.
You do not have to include any dose received while transiting from the waiting area through the room to and from the pump.
(Provide examinee a copy of Survey Map DB-M-2018-TRG)
Job Performance Measure Form 3.2-3 Worksheet Admin JPM RO-A3 Page 3 of 5 CANDIDATE COPY INITIAL CONDITIONS:
The plant is in procedure DB-OP-02527 Loss of Decay Heat Removal Refer to the Decay Heat Pump area Rad Pro Survey Map.
You are to stage yourself inside the radiologically controlled area while awaiting directions.
You are to remain in the area identified on the survey map with the lowest possible dose during the wait time.
Your task will be to vent Decay Heat Pump 2 using vent valve DH56, DH PUMP 2 CASING VENT when directed.
Your RWP has the following limits:
- Dose Rate Alarm = 75 mrem/hr
- Dose Alarm = 40 mrem Aux Building 545 ECCS Room 2 is posted as a Radiation Area Time line:
0800 - You enter ECCS Room 2 room and wait in the area identified on the survey map with the lowest possible dose 0830 - Wait time is complete, you start venting Decay Heat Pump 2 0855 - Venting is complete, you immediately exit the room and report back to the CTRM INITIATING CUE:
Based upon the above timeline, the information from your RWP and the Aux Building 545 ECCS Room 2 survey map:
- 1.
Determine the total amount of dose that was received from room entry to exit. Use the highest potential dose rate in the area of the pump in determining your dose for the actual venting portion of the entry.
- 2.
Assuming no dose was received until you entered ECCS Room 2, determine the MAXIMUM time (including the wait time) you could take to vent the Decay Heat Pump 2 until you would receive an EAD Dose Alarm.
You do not have to include any dose received while transiting from the waiting area through the room to and from the pump.
Job Performance Measure Form 3.2-3 Worksheet Admin JPM RO-A3 Page 4 of 5 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT required unless denoted in the "Comments".
START TIME:
- 1.
PERFORMANCE STEP: Determine the dose that will be received while waiting in the
........C........
lowest dose waiting area in the radiologically controlled area.
STANDARD:
Calculates the dose received for the duration of the time in the low dose area Map location DR12.
Based on a 30-minute wait at the area with a dose rate of 5 mrem/hr:
Low Dose Wait Area Dose: 5 mrem/hr X 0.5 hr = 2.5 mrem CUE:
None SAT UNSAT
- 2.
PERFORMANCE STEP: Determine the dose that will be received while venting the pump.
........C........
STANDARD:
Calculates the dose received for the duration of the time venting the pump. Per the Survey Map location DR10 has the highest dose at 50 mrem/hr.
Based on a 25 minute task duration at the pump with a dose rate of 50 mrem/hr:
Pump Venting Dose: 50 mrem/hr X (25/60) hr = 20.83 mrem COMMENT: Acceptable range is 20.8 to 21 mrem.
CUE: None SAT UNSAT
Job Performance Measure Form 3.2-3 Worksheet Admin JPM RO-A3 Page 5 of 5
- 3. PERFORMANCE STEP: Determine the Total dose that will be received while in the area
........C........ performing the task.
STANDARD:
Calculate the dose received for the duration of the task.
TOTAL Dose: 2.5 mrem + 20.83 mrem = 23.33 mrem COMMENT: Acceptable range is 23.3 to 24.0 mrem CUE: None SAT UNSAT
- 4.
PERFORMANCE STEP: Determine the maximum time to complete the task before
........C........
reaching the EAD Dose Alarm setpoint.
STANDARD:
Calculates the maximum time until Dose Alarm.
The RWP Dose Alarm setpoint is 40 mrem.
Subtract the low dose waiting area dose from the total allowed:
40 mrem - 2.5 mrem = 37.5 mrem Vent Time Dose Rate is 50 mrem / hr:
37.5 mrem/ 50 mrem / hr = 0.75 hrs or 45 minutes TOTAL Time is 45 minutes CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by examinee)
END TIME: __________
FOR TRAINING USE ONLY VSDS Standard Map Survey Report Survey DB-M-2018-TRG
FOR TRAINING USE ONLY VSDS Standard Map Survey Report Survey DB-M-2018-TRG Cooler 1-2 DH HPI Cooler 1-1 CS Sump ALARA RA Catwalk CA DR 2 15 DR 1 12 CA DR 10 50 DR 9 22 DR 3 20 DR 4 60 DR 5 70 DR 7 10 DR 6 20 DR 8 10 DR 12 5
4 1
2 3
5 7
6 8
DR 11 HS* 540 11
FOR TRAINING USE ONLY VSDS Standard Map Survey Report Survey DB-M-2018-TRG Type Inst.
Value Units Position Notes 1
DR N/A 12 mrem/hr 2
DR N/A 15 mrem/hr 3
DR N/A 20 mrem/hr 4
DR N/A 60 mrem/hr 5
DR N/A 70 mrem/hr 6
DR N/A 20 mrem/hr 7
DR N/A 10 mrem/hr 8
DR N/A 10 mrem/hr 9
DR N/A 22 mrem/hr 10 DR N/A 50 mrem/hr 11 DR HS N/A HS
- 540 mrem/hr Hot Spot # 1 Elbow, placard reads *540 /11/@ 30 CM N/A
+11 mrem/hr 12 DR N/A 5
mrem/hr Type Inst.
Value Units Position Notes 1
Smear N/A
/ 22 DPM/100 cm2 floor N/A
< MDA DPM/100 cm2 2
Smear N/A
/ 47 DPM/100 cm2 floor N/A
< MDA DPM/100 cm2 3
Smear N/A
/ 62 DPM/100 cm2 floor N/A
< MDA DPM/100 cm2 4
Smear N/A
/ <MDA DPM/100 cm2 floor N/A
< MDA DPM/100 cm2 5
Smear N/A
/ 38 DPM/100 cm2 floor N/A
< MDA DPM/100 cm2 6
Smear N/A
/ 38 DPM/100 cm2 floor N/A
< MDA DPM/100 cm2 7
Smear N/A
/ 587 DPM/100 cm2 floor N/A
< MDA DPM/100 cm2 8
Smear N/A
/ MDA DPM/100 cm2 floor N/A
< MDA DPM/100 cm2