February 24, 2024 MEMORANDUM TO:
Gerond A. George, Chief Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:
Leslie C. Fields, Senior Project Manager
/RA/
Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF OCTOBER 11, 2023, U.S. NUCLEAR REGULATORY COMMISSION PUBLIC OBSERVATION MEETING ON CLARIFICATION OF REQUESTS FOR ADDITIONAL INFORMATION (PART 2) FOR TOPICAL REPORT PWROG-18068-NP, REVISION 1 (EPID L-2021-TOP-0027)
On October 11, 2023, the U.S. Nuclear Regulatory Commission (NRC) staff held a second public meeting with the Pressurized Water Reactor Owners Group (PWROG) to provide clarification on Request for Additional Information (RAI) questions regarding Topical Report (TR)
PWROG-18068-NP, Revision 1, Use of Direct Fracture Toughness for Evaluation of Reactor Pressure Vessel Integrity (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML21209A933) transmitted for NRC review and approval on July 17, 2021. The October 11, 2023, public meeting was held virtually and provided the opportunity for continuation (part 2) of RAI topics discussed during the August 4, 2023, public meeting where more time was requested to complete the RAI discussion. The meeting notice for the October 11, 2023, public meeting is publicly available at ADAMS Package Accession No. ML23270B109. A list of the meeting attendees is enclosed in this meeting summary.
TR PWROG-18068 provides an alternative methodology to the Reactor Pressure Vessel material integrity requirements which are available in Title 10 of the Code of Federal Regulations Appendix G to Part 50, Fracture Toughness Requirements, Section 50.60, Acceptance criteria for fracture prevention measures for lightwater nuclear power reactors for normal operation, and Section 50.61, Fracture toughness requirements for protection against pressurized thermal shock events. As a result of the technical review of TR PWROG-18068, Revision 1, the NRC staff transmitted RAI questions and PWROG provided the proposed responses to the RAI questions. During the August 4, 2023, public observation meeting, the NRC staff provided clarification on the first half of PWROGs draft responses up to RAI 13, and the October 11, 2023, public meeting provided the additional time needed to discuss the second part of the draft RAI responses. The entire draft RAI response markup is available at ADAMS Accession No. ML23180A161.
CONTACT: Leslie Fields, NRR/DORL
301-415-1186 During the meeting on October 11, 2023, the NRC staff provided clarification on RAI 13 through RAI 25 except for RAI 24 which was comprehensively discussed at the August 4, 2023, public meeting. It was decided that the NRC staff would conduct an in-person regulatory audit in the near future as the final phase of the RAI discussion and PWROGs final RAI responses would be subsequently submitted after the audit.
The regulatory audit was held on January 17 and 18, 2024. The regulatory audit plan can be found at ADAMS Package Accession No. ML24008A051.
The meeting summary for the August 4, 2023, public meeting (Part 1) is available at ADAMS Package Accession No. ML23270B860.
At the conclusion of the meeting, there was an opportunity for the public to provide comments and ask questions. It was noted that no public comments were received.
Please direct any inquiries to me at (301) 415-1186 or by e-mail at Leslie.Fields@nrc.gov.
Docket No. 99902037
Enclosure:
List of Meeting Attendees
Enclosure Meeting
Participants:
SUMMARY
OF OCTOBER 11, 2023, PUBLIC MEETING ON CLARIFICATION OF REQUEST FOR ADDITIONAL INFORMATION QUESTIONS FOR TOPICAL REPORT PWROG-18068, REVISION 1 ATTENDANCE LIST Name Organization Leslie Fields U.S. Nuclear Regulatory Commission (NRC)
Gerond George NRC David Dijamco NRC Angie Buford NRC John Tsao NRC Robert Tregoning NRC Dan Widrevitz NRC James Medoff NRC James Molkenthin Westinghouse Electric Company (Westinghouse)
Chad Holderbaum Westinghouse James Andrachek Westinghouse Brian Hall Westinghouse Benjamin Mays Westinghouse Krishan Garg PSEG Nuclear Dale Turinetti American Electric Power (AEP)
Shane Webb Florida Power & Light (FPL)
Mathew Jones FPL Osvaldo Cruz Constellation Lora Drenth Constellation Edwin Lyman UCSUSA Corey Thomas Southern Company Johan Blomstroem Vattenfall Clark Shurtleff Holtec Bergman, Jana Curtiss-Wright
ML23270B859 (Package)
ML23270B109 (Notice)
ML23180A161 (NRC Draft Responses)
ML24040A215 (Summary)
OFFICE NRR/DORL/LLPB/PM NRR/DORL/LLPB/LA NRR/DNRL/NVIB/BC NAME LFields DHarrison ABuford DATE 02/12//2024 02/20/2024 02/16/2024 OFFICE NRR/DORL/LLPB/BC NRR/DORL/LLPB/PM NAME GGeorge LFields DATE 02/20/2024 02/22/2024