ML24018A040

From kanterella
Jump to navigation Jump to search
Approved FAQs 1_17
ML24018A040
Person / Time
Issue date: 01/17/2024
From: Ronald Cureton
NRC/NRR/DRO/IRAB
To:
References
Download: ML24018A040 (1)


Text

FAQ # PI Plant Subject ADAMS ML Effective Date

HRA Related 12-04 OR01 Generic Occurrences ML16285A130 05/13/2013

Exemption Request from 13 - 01 IE01 Turkey Point 3 Green-White ML16285A175 06/26/2013 Threshold

13 - 02 IE03 Generic Power Change ML16285A318 10/23/2013

Animal 13 - 03 IE03 Generic Intrusion/Power Change ML16285A319 11/20/2013

13 - 04 EP03 Point Beach ANS ML16285A320 04/02/2014

13 - 05 IE03 Generic Downpower ML16285A321 04/02/2014

13 - 06 MS07 Generic HPCI Failure ML16285A322 1/15/2014

DEP Scoring 13 - 07 EP01 Generic Opportunity ML16285A323 4/1/2014

MS06, 07, MSPI PRA Technical 14 - 01 08, 09, 10 Generic Adequacy ML16285A324 3/31/2016*

MS06, 07, 08, 14 - 02 09, 10 Specific Fort Calhoun MSPI ML16285A325 10/1/2014

14 - 03 IE04 ANO -2 ANO -2 USwC ML16285A326 12/11/2014

  • see FAQ for specific requirements FAQ # PI Type Subject ADAMS ML Effective Date

14-04 OR01 Generic Concurrent Failures ML16285A327 9/11/2014

Hatch New Siren 14 - 05 EP03 Hatch System Data ML16285A328 12/11/2014

14 - 07 EP03 Point Beach Point Beach ANS ML16285A329 12/11/2014

14 - 08 MS06 Generic Prairie Island Lockout ML16285A330 4/16/15

14 - 09 IE01 ANO ANO SCRAM April ML16285A331 2/19/2015

Indian Point Security 14 - 10 PP01 Indian Point Upgrade ML16285A332 4/16/2015

Perry SCRAM 15 - 01 IE04 Generic October 20, 2014 ML16285A333 4/16/2015

Prairie Island unplanned 15 - 02 IE03 Generic downpower ML16285A334 10/21/2015

MS06,07, Unavailability 15 - 03 08,09,10 Generic Monitoring of Low - ML16285A335 11/17/2015 Risk Trains

Clarification on Granting 15 - 04 EP02 Generic Participation Credit ML16285A336 11/17/2015 During a HAB Drill/Exercise

  • see FAQ for specific requirements FAQ # PI Type Subject ADAMS ML Effective Date

MS06,07 Cook PRA Error 16-01 08,09,10 Generic Affecting MSPI ML16285A337 04/13/2016

MS06,07 Watts Bar 2 Baseline 16 - 02 08,09,10 Watts Bar 2 Planned UA and CCF ML17129A042 09/21/2016

Tornado Missile Protection (TMP) 16 - 03 MS05 Generic Potential Safety System ML17129A050 07/01/2016 Functional Failure

Browns Ferry Safety 16 - 04 MS05 Generic System Functional Failure ML17125A070 04/13/2017

17 - 01 IE03 Grand Gulf 1 2016 Power Change ML17207A096 07/21/2017

17 - 02 IE03 Palo Verde 3 PVNGS 3 Power Change ML17207A100 07/21/2017

MS06,07 Baseline Unavailability 17 - 03 08,09,10 Generic Critical Hours ML17291A258 09/21/2017

MS06, 07, Watts Bar Unit 2 MSPI 17 - 04 08, 10 Watts Bar 2 Effectiveness Date ML18045A038 01/31/2018

Watts Bar 2 MSPI MS09 01/31/2018 17 - 05 MS09 Watts Bar 2 Effectiveness Date ML18045A041 (Partially Withdrawn)

Definition of Initial 18 - 01 IE04 Generic Transient ML18144A961 05/24/2018

  • see FAQ for specific requirements FAQ # PI Type Subject ADAMS ML Effective Date

Columbia Scram 18-03 IE04 Columbia Exemption Request ML18144A977 05/24/2018

IE01 and 18 - 02 IR03 Watts Bar Watts Bar Critical Hours ML18144A967 07/19/2018

ANO -1 Scram One-Time 18 - 04 IE04 ANO Unit 1 Exemption Request ML18232A233 08/20/2018

Turkey Point Unit 3 18 - 05 IE03 Turkey Point Shutdown ML19024A500 1/17/2019

19 - 01 EP01 EP EP DEP Whitepaper ML19169A262 5/22/2019

19 - 02 BI02 Brunswick Brunswick RCS Leakage ML19169A263 7/31/2019

Nine Mile 20 - 01 IE03 Point 1 Nine Mile Point Scram ML20190A148 6/24/2020

20 - 02 EP02 Generic EP-ERO PI (COVID - 19) ML20107F675 4/15/2020

FAQ 20- 04: Crediting Automated Notifications in 20 - 04 EP01 Generic the DEP Performance ML20335A061 11/18/2020 Indicator

EP-ERO PI (COVID - 19),

20 - 02 EP02 Generic Updated ML20352A482 12/29/2020

  • see FAQ for specific requirements MS06 MS07 Restoration of Train 20 - 03 MS08 Generic Monitoring After PRA ML21075A257 2/24/2021 MS09 Model Changes MS10

River Bend RBS Unplanned Scram 20 - 05 IE04 Station May 2019 ML21075A267 2/24/2021

Grand Gulf GGNS Turbine Controls 20 - 06 IE01 Nuclear Station Upgrade Scrams One-ML21075A275 2/24/2021 Time Exemption

Generic - Unplanned Scrams with 21 - 01 IE04 AP1000 Complications for AP1000 ML21075A282 2/24/2021

Counting DEP Opportunities from an 21 - 02 EP01 Generic Emergency Following ML21117A104 04/21/2021 Retraction of the NRC Emergency Notification

FAQ 21-ANS Guidance Following 03 R1 EP03 Generic IPAWS ML21244A427 09/26/2021

22- 01 EP03 Generic Replace the ANS PI with an ERFER PI ML22055A562 03/23/2022

Diablo Canyon Diablo Canyon Unplanned 22- 02 IE04 Power Plant Scram ML22278A296 10/20/2022 May 2022

Susquehanna Susquehanna Unplanned 22- 03 IE04 Steam Scram ML22278A766 10/20/2022 Electric October 2022 Station

DC Cook Unplanned 23- 01 IE01 DC Cook Unit 1 Scram ML23104A432 4/5/2023 May 24, 2022

Peach Bottom Unit 2 23- 02 IE04 Peach Bottom Unit 2 Unplanned ML23192A121 7/13/2023 Scram with Complications

  • see FAQ for specific requirements Turkey Point Unit 3 WITHDRAWN 23- 03 IE01 Turkey Point Unit 3 Unplanned Scrams per ML24012A042 1/17/2024 7,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />
  • see FAQ for specific requirements