ML24011A181
| ML24011A181 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 12/14/2023 |
| From: | Constellation Energy Generation |
| To: | Thomas Setzer NRC/RGN-I/DORS/OB |
| References | |
| EPID L-2024-OLL-0000 | |
| Download: ML24011A181 (1) | |
Text
Form 2.1-1 Examination Preparation Checklist Facility: Limerick Units 1 and 2 Date of Examination: 12/4/2023 Developed by: Written: Facility / Operating: Facility Target Date*
Task Description Chief Examiners Initials
-240
- 1. Examination administration date confirmed (A.1-5). For NRC-prepared examinations, arrangements are made for the facility licensee to submit reference materials (B.4, C.4.g and F).
4/8/2023
-210
- 2. NRC examiners and facility licensee contact assigned (B.1 and C.1-3).
5/8/2023
-210
- 3. Facility licensee contact briefed on examination security and other requirements (D.4). As applicable, the facility licensee contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facility licensees prescreening process (ES-4.1 A.1.a and ES-4.1 B.2).
5/8/2023
-210
- 4. Reference material due for NRC-prepared examinations (F).
N/A
-210
- 5. Examination kick-off call held (C.4). The NRC sends the corporate notification letter (A.5).
5/8/2023
-195
- 6. Written examination outline developed by the NRC and sent to the facility licensee contact (must be on the examination security agreement) (B.2, ES-4.1 A.1.b and ES-4.1 A.2.a).
5/23/2023
-150
- 7. Operating test outlines and checklists due: Forms 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.3-1, and 3.4-1, as applicable (B.6). Facility licensee provides a draft operating test administration schedule to the NRC (B.18).
7/7/2023
-136
- 8. Operating test outlines reviewed by the NRC and feedback provided to the facility licensee (ES-2.3).
7/21/2023
-100
- 9. NRC-prepared examinations approved by the NRC supervisor and forwarded for facility licensee review (ES-2.3).
N/A
-75
- 10. Proposed examinations (written, JPMs, and scenarios, as applicable) and outline forms; quality checklists and supporting documentation (including Forms 2.3-2 and 2.3-4 and any Form 2.3-1, 1.3-1, and 3.4-1 updates); and reference materials due.
9/20/2023
-60
- 11. Preliminary waiver/excusal requests due (ES-2.2 E.1).
10/5/2023
-50
- 12. Written examination and operating test reviews completed (ES-2.3). The NRC supervisors authorization to proceed with the facility review granted (ES-2.3 D).
10/15/2023
-50
- 13. Examination review results discussed between the NRC and the facility licensee (B.14).
10/15/2023
-35
- 14. Examination preparatory week conducted by the NRC and the facility licensee (I).
10/30/2023
-30
- 15. Preliminary license applications, including any waiver/excusal requests, due (ES-2-2 C.1).
11/4/2023
-14
- 16. Final license applications, including any waiver/excusal requests, due and Form 2.2-1 prepared (ES-2.2 C and E).
11/20/2023
-7
- 17. Written examinations and operating tests approved by the NRC supervisor (C.9) 11/27/2023
-7
- 18. Facility licensee management feedback on the examination requested by the NRC supervisor (C.10).
11/27/2023
-7
- 19. Final applications reviewed; 10% of applications audited to confirm qualifications/eligibility (ES-2.2 G); and examination approval letter (Letter 2.3-1) and waiver/excusal letters sent.
11/27/2023
-7
- 20. Written examination administration guidelines reviewed with the facility licensee (D.14).
11/27/2023
-7
- 21. Approved scenarios and job performance measures distributed to NRC examiners (D.12).
11/27/2023
- Target dates are based on facility licensee-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted in coordination with the facility licensee.
12/15/2023 12/15/2023 12/15/2023 Thomas Setzer Donald Jackson Christopher Lally CML CML CML
Thomas Setzer Thomas Setzer Donald Jackson 12/15/2023 12/15/2023 12/15/2023
Form 2.3-4 Written Examination Guality Ghecklist Facility: Limerick Date of Exam:12104123 Exam Level: RO X SRO X Item Description (Y)es / (N)o a
b*
c#
1 Questions and answers are technlcally accurate and applicable to the facility. Each question includes a technical reference.
ft /*
2
- a. All questions reference NRC knowledge and abilities (K/As) requirements.
- b. Facility learning objectives are referenced as available.
- c. All questions include an explanation of the correct answer explanation and a distractor analysis.
E- /rr
- 4. The sampling process was random'and systematic.
(lf more than four reactor operator (RO) or two SRO questions were repeated from the last two NRC licensing exams, including full (100-question) retake examinations, consult the NRC Office of Nuclear Reactor Regulation operator licensing program office.)
6-
/v.)
- 5. Question duplication from the licensee screening/audit exam was controlled as indicated below (check the item that applies) and appears appropriate:
_ The audit exam was systematically and randomly developed.
The audit exam was completed before the license exam was sta(ed The examinations were developed independently 17 l_\\ The licensee certifies that there is no duplication.
Other (explain) 6 lZN
- 6. Bank use meets limits (no more lhanTSVo from the bank, at least 10% new (at the comprehension/analysis level), and the rest new or modified); enter the actual RO/SRO-only question distribution >
Bank Modified New 28 t2 0/0 47t23 A
/e)
- 7. Between 38 and 45 questions of the questions on the RO exam and at least 13 of the questions on the SRO-only portion of the exam are written at the comprehension/analysis level; enter the actual RO/SRO-only question distribution >
lv'lemory c/A 341 5 41t20 & An
- 8. References/handouts provided do not give away answers or aid in the elimination of distractors r4
/t^t
- 9. Question content conforms to specific K/A statements in the previously approved examination outline and is appropriate for the l(A statements' assigned tier; deviations are justified rt
/tl
- 10. Question psychometric quality and format meet the instructions and guidelines in ES-4.2.
p /t" 11 The exam contains the required number of one-point, multiple-choice items; the total is correct and agrees with the value on the cover sheet.
dL lN Printed Name/Signatu Date a-Author
- b. Facility Reviewer (*)
- c. NRC Reviewer (#)
NRC Chief Examiner NRC Regional Supervisor
- hl
'/ /zy/z) 1@
-Af
- The facility licensee signature is not applicable for NRC-developed tests.
- An independent NRC reviewer performs steps in column c. This may be the NRC Chief Examiner if he/she did not develop the written examlnation under review Thomas Setzer Thomas Setzer Donald Jackson 12/15/2023 12/15/2023 12/15/2023
Form 3.4-1 Events and Evolutions Checklist Facility: LGS Date of Exam: 12/04/23 Operating Test No.: 1 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1 (SEG-2166E) 2 (SEG-3160E) 3 (SEG-7018E)
T O
T A
L M
I N
I M
U M*
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
SRO-U (1)
RX 0
1 1
0 NOR 1
1 1
1 1
I/C 2,3,4,5 7, 8, 9 7
4 4
2 MAJ 6
1 2
2 1
Man.
Ctrl 0
1 1
0 TS 2,3 2
0 2
2 SRO-I (1)
RX 1
1 1
1 0
NOR 1
1 1
1 1
I/C 2,3,4,5 7, 8, 9 3,4,5, 8,10 3,4,5, 7
16 4
4 2
MAJ 6
6,7 6
4 2
2 1
Man.
Ctrl 4
8 2
1 1
0 TS 2,3 2
0 2
2 SRO-I (2)
RX 1
1 1
1 0
NOR 1
1 1
1 1
I/C 2,3,4,5 7, 8, 9 2,5,6,9 11 4
4 2
MAJ 6
6,7 3
2 2
1 Man.
Ctrl 2,9 2
1 1
0 TS 2,3 2
0 2
2 SRO-I (3)
RX 1
1 1
1 0
NOR 1
1 1
1 1
I/C 3,4,5, 7,9 2,3,4,5, 8,9 10 3,4,5, 7
16 4
4 2
MAJ 6
6,7 6
4 2
2 1
Man.
Ctrl 3,4,7 8
4 1
1 0
TS 3,4 2
0 2
2 SRO-I (4)
RX 4
1 1
1 0
NOR 0
1 1
1 I/C 2,3,5, 8
2,3,4,5, 8,9 10 11 4
4 2
MAJ 6
6,7 3
2 2
1 Man.
Ctrl 8
1 1
1 0
TS 3,4 2
0 2
2
Form 3.4-1 Events and Evolutions Checklist Facility: LGS Date of Exam: 12/04/23 Operating Test No.: 1 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios SEG-2166E SEG-3160E SEG-7018E T
O T
A L
M I
N I
M U
M*
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
SRO-I (5)
RX 0
1 1
0 NOR 1
1 1
1 1
I/C 3,4,5, 7,9 2,3,4,5, 8,9 10 12 4
4 2
MAJ 6
6,7 3
2 2
1 Man.
Ctrl 3,4,7 3
1 1
0 TS 3,4 2
0 2
2 SRO-I (6
RX 4
1 1
1 0
NOR 0
1 1
1 I/C 2,3,5, 8
3,4,5, 8,10 1,2,3,4 5,7,9 16 4
4 2
MAJ 6
6,7 6
4 2
2 1
Man.
Ctrl 8
4 2
1 1
0 TS 2,3 2
0 2
2 SRO-I (7)
RX 0
1 1
0 NOR 0
1 1
1 I/C 3,4,5, 8,10 1,2,3,4 5,7,9 12 4
4 2
MAJ 6,7 6
3 2
2 1
Man.
Ctrl 4
1 1
1 0
TS 2,3 2
0 2
2 RO-1 RX 4
1 2
1 1
0 NOR 0
1 1
1 I/C 2,3,5, 8
2,5,6,9 1,2,4,9 12 4
4 2
MAJ 6
6,7 6
4 2
2 1
Man.
Ctrl 8
2,9 2
4 1
1 0
TS 0
0 2
2 RO-2 RX 1
1 1
1 0
NOR 1
1 1
1 1
I/C 3,4,5, 7,9 2,5,6,9 1,2,4,9 13 4
4 2
MAJ 6
6,7 6
4 2
2 1
Man.
Ctrl 3,4,7 2,9 2
6 1
1 0
TS 0
0 2
2