|
---|
Category:Memoranda
MONTHYEARML24254A4092024-10-0808 October 2024 Memo - Summary of Meeting on August 28, 2024, with TRISO-X, LLC to Align on the Supplement Responses to the Management Measures and Quality Assurance Requests for Additional Information (Public) ML24255A3212024-10-0808 October 2024 Memo - Summary of Meeting on August 27, 2024 with TRISO-X to Discuss Draft Supplement Responses to Structural Programmatic Requests for Additional Information ML24206A0772024-09-0505 September 2024 Memorandum - Summary of Meeting Held on June 27, 2024 with TRISO-X LAR Structural Meeting ML24228A1282024-09-0505 September 2024 Memo - Summary of Meeting on July 17, 2024, with TRISO-X to Align on the Supplemental Responses to the Management Measures and Quality Assurance Requests for Additional Information ML24198A2352024-08-26026 August 2024 Memorandum - Summary of Meeting Held on June 17 2024 with TRISO-X to Align on NRC Supplement Responses to Management Measures Requests for Additional Information ML24206A0452024-08-26026 August 2024 Memo - Summary of Meeting on June 17, 2024, with TRISO-X, Llc. to Discuss the Status of the License Application Review ML24178A4022024-08-0101 August 2024 Memo - Summary of Meeting on May 24, 2024, with TRISO-X LLC, to Align on the Supplemental Responses to the Integrated Safety Analysis Requests for Additional Information ML24183A2022024-07-31031 July 2024 Memo - Summary of Meeting on June 6, 2024, with TRISO-X, LLC, to Align on the Supplement Responses to Integrated Safety Analysis Requests for Additional Information ML24102A1812024-04-24024 April 2024 Cover Letter - Summary of Meeting on April 9, 2024, with TRISO-X LLC, to Discuss Supplement Responses to Structural Programmatic Requests for Additional Information ML24071A1562024-04-0808 April 2024 Memorandum - Summary of Meetings on Held on 2-21-24 and 2-22-24 with TRISO-X for Supplements Regarding RAIs on the ISA Summary ML24085A7642024-04-0202 April 2024 Summary of Meeting on March 18, 2024, with TRISO-X LLC, to Align on Draft Set 8 Requests for Additional Information Regarding the Integrated Safety Analysis ML24066A1842024-03-25025 March 2024 Memorandum - Summary of Meeting on January 25, 2024 with TRISO-X to Align on NRC Supplement Responses Management Measures ML24002A8252024-03-13013 March 2024 December 18, 2023, Summary of Meeting on TRISO-X, LLC, to Align on the Need to Supplement the Responses to the Requests for Additional Information Regarding Management Measures ML24057A3632024-03-11011 March 2024 Memorandum - Summary of Meeting 2-12-24 with TRISO-X to Discuss Draft RAIs on Environmental Protection ML24030A8512024-03-0101 March 2024 Summary of Meeting on with TRISO-X to Align on NRC Supplement to Responses to Structural Requests for Additional Information ML23332A0752024-02-23023 February 2024 Memorandum - Summary of Six Meetings Between December 11, 2023 and January 23, 2024 with TRISO-X, LLC, to Align on a Supplement for the Responses to the Requests for Additional Information Regarding the Integrated Safety Analysis ML24024A1632024-01-25025 January 2024 January 17, 2024, Summary of Meeting with Triso-X, LLC, to Align on the Triso-X Draft Environmental Impact Analysis Requests for Additional Information Part 2-2 ML23362A0662024-01-16016 January 2024 12-19-23 Summary of Meeting with Triso-X, LLC, to Align on Triso-X Draft Environmental Safety Request for Additional Information ML24010A1672024-01-10010 January 2024 Environmental Impact Statement Scoping Process, Summary Report for the TRISO-X, LLC, Public Scoping Period January – February 2023 ML24010A1662024-01-0808 January 2024 Scoping Summary Report Related to the Environmental Scoping Process for the Triso-X Special Nuclear Material License Application ML23355A2452024-01-0505 January 2024 TRISO-X Fuel Facility Resident Inspector Decision ML23353A1832023-12-27027 December 2023 Summary of Meeting on December 4, 2023, with TRISO-X LLC, to Align on TRISO-X Draft Responses to the Requests for Additional Information for the Chemical Safety Analysis ML23117A1122023-05-22022 May 2023 Memo Summary of TRISO-X Closed Call on ISA Methodology and Natural Phenomena Hazards ML23044A2522023-02-22022 February 2023 Memo and Enclosure 1 - 011023 Summary of TRISO-X Call on Observations and Fuel Fabrication ML19283B2042019-10-10010 October 2019 Meeting Summary with X-Energy to Provide Pre-Application Information Re Integrated Safety Analysis Methods for the TRISO-X Fuel Fabrication Facility License Application ML19011A1942019-01-17017 January 2019 Meeting Summary: Meeting with X-Energy to Provide Pre-Application Information Related to Criticality Safety Regarding the Triso-X Fuel Fabrication Facility License Application 2024-09-05
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 MEMORANDUM TO: John Moses, Deputy Director Division of Rulemaking, Environmental, and Financial Support Office of Nuclear Material Safety and Safeguards FROM: Jill Caverly, Acting Branch Chief Environmental Project Management Branch 2 Division of Rulemaking, Environmental, and Financial Support Office of Nuclear Material Safety and Safeguards
SUBJECT:
SCOPING
SUMMARY
REPORT RELATED TO THE ENVIRONMENTAL SCOPING PROCESS FOR THE TRISO-X SPECIAL NUCLEAR MATERIAL LICENSE APPLICATION (DOCKET NUMBER: 70-7027)
The staff of the U.S. Nuclear Regulatory Commission (NRC) conducted a scoping process from December 16, 2022, through February 14, 2023, to determine the scope of the NRC staffs environmental review of an application from TRISO-X, LLC for a license to possess and use special nuclear material at the TRISO-X Fuel Fabrication Facility to be constructed in Oak Ridge, Roane County, Tennessee. As part of the scoping process, the NRC staff held a public scoping meeting and webinar in Oak Ridge, TN on January 25, 2023. The meeting was held to solicit public input regarding the scope of the environmental review. A transcript of the scoping meeting is available in ADAMS under Accession No. ML23037A021.
The NRC staff has prepared the enclosed scoping summary report, which identifies comments either received at the public scoping meeting, by letter, through www.regulations.gov, or by electronic mail and provides responses to those comments. All participants of the scoping process (who have provided mailing information) will receive notification of issuance of the scoping summary report and it will be posted on the project webpage. The next step in the environmental review process is the issuance of the draft Environmental Impact Statement (DEIS). Notice of the availability of the DEIS and the procedures for providing comments will be published in the Federal Register.
CONTACT: Jill Caverly, NMSS/REFS 301-415-7674 Docket No. 70-7027
Enclosure:
January 8, 2024 Signed by Caverly, Jill on 01/08/24
ML24010A173 Ltr ML24010A166 OFFICE PM:REFS LA:REFS PM:REFS
NAME JCaverly AWalker-Smith JCaverly DATE 01/05/2024 01/05/2024 01/08/2024