Comment (14) of Todd Evans on Vistra Operations Company LLC; Comanche Peak Nuclear Power Plant, Units 1 and 2
ML24009A185
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/26/2023
From: Evans T
Luminant, Vistra Operations Company
To:
Office of Administration
References
88FR75629 00014, NRC-2022-0183
Download: ML24009A185 (1)


Text

1/9/24, 10:55 AM blob:https://www.fdms.gov/c973acbf-eb43-4b2a-bf17-c63eab309e77 SUNSI Review Complete Template=ADM-013 As of: 1/9/24, 10:55 AM E-RIDS=ADM-03 Received: December 26, 2023 PUBLIC SUBMISSION ADD: Tam Tran, Status: Pending_Post Antoinette Walker-Smith, Tracking No. lqm-u7bo-ztsg Lance Rakovan, Caroline Hsu, Mary Neely Comments Due: December 26, 2023 Comment (14) Submission Type: Web Publication Date:

11/3/2023 Docket: NRC-2022-0183 Citation: 88 FR 75629 Vistra Operations Company LLC Comanche Peak Power Company LLC Comanche Peak Nuclear Power Plant, Units 1 and 2

Comment On: NRC-2022-0183-2581 Vistra Operations Company LLC; Comanche Peak Nuclear Power Plant, Units 1 and 2

Document: NRC-2022-0183-DRAFT-2590 Comment on FR Doc # 2023-24294

Submitter Information

Email: todd.evans@luminant.com Organization: Vistra

General Comment

Docket NRC-2022-0183 Comanche Peak Nuclear Power Plant, Units 1 and 2, License Renewal Vistra / Luminant submits the attached comments.

Attachments

Comanche Peak DSEIS Comments

blob:https://www.fdms.gov/c973acbf-eb43-4b2a-bf17-c63eab309e77 1/1 Comanche Peak provides the following comments on the Comanche Peak Draft Environmental Impact Statement (DSEIS) NUREG-1437 Supplement 60 ML23299A252.

Submitted by Todd Evans, Manager, License Renewal, Comanche Peak

Comment DSEIS Section DSEIS Page Comment 1 Table 3-5 3-13, 3-14, Editorial - there are a number of duplications of 3-15 equipment in this table.

2 3.3.3 3-16, 3-17 Editorial - in the 3rd paragraph of this section, there are several sentences that are duplicated.

3 Table 2-1 2-21 The Land Requirements section for the NGCC Alternative in this table states An additional 40 ac (16ha) would be required for the associated BDTF. Section 2.3.2.2 (page 2-24 line 1) for the NGCC Alternative states that the BDTF would be cited within 400 ac. Vistra believes the 400 ac is more appropriate and recommends Table 2-1 reflect this.

4 3.5.1.2 3-32 line 43 The water storage tanks are stated to have a capacity of 524,000 gallons. The correct capacity is 524,500 (reference section 2.2.3.5 of the ER).

5 3.6.1 3-51 line 9 The acreage is incorrectly stated for the freshwater forested/shrub wetlands. It should be 335.46 ac (135.75 ha).

6 3.8.4.1 3-100 line northern long -eared bats should be tricolored bats.

17