Letter Sequence Supplement |
---|
|
|
|
|
---|
Category:Letter type:L
MONTHYEARL-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-117, Safety Injection Tank Vent Through Wall Leakage2024-07-11011 July 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda L-2024-045, Report of 10 CFR 72.48 Plant Changes2024-03-27027 March 2024 Report of 10 CFR 72.48 Plant Changes L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2024-023, Unusual or Important Environmental Event - Turtle Mortality2024-03-0606 March 2024 Unusual or Important Environmental Event - Turtle Mortality L-2024-027, Safety Injection Tank Vent Through Wall Leakage2024-02-29029 February 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-015, 2023 Annual Radioactive Effluent Release Report2024-02-29029 February 2024 2023 Annual Radioactive Effluent Release Report L-2024-029, 2023 Annual Operating Report2024-02-28028 February 2024 2023 Annual Operating Report L-2024-026, Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules2024-02-27027 February 2024 Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-175, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report 2024-09-09
[Table view] |
Text
November 29, 2023 L-2023-175 10 CFR 73.5
U. S. Nuclear Regulatory Commission Attn : Document Control Desk Washington, DC 20555-0001
Re : Florida Power & Light Company St. Lucie Units 1 and 2, Docket Nos. 50-335, 50-389, 72-61
Supplement to St. Lucie Exemption Request Regarding Enhanced Weapons. Firearms Background Checks, and Security Event Notifications Final Rule
Reference :
(1) Florida Power & Light letter L-2023-158 RE : St. Lucie Nuclear Plant, Units 1 and 2; Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule, November 16, 2023 (ADAMS Accession No. ML23320A266)
In Reference 1, Florida Power & Light Company (FPL) requested an exempt ion from the Enhanced Weapons, Firearms Background Checks, and Security Event Notifications final rule (hereto referred to as the 'final rule'), as specified in the Federal Register [88 FR 15864], for St. Lucie Nuclear Plant, Units 1 and 2 (St. Lucie). The proposed exemption would relieve compliance with the final rule at St. Lucie until December 31, 2024, or 180 days following publication of the Regulatory Guides (RGs) described in Federal Register 88 FR 15864, whichever is later.
During a November 20, 2023, clarification call with the Nuclear Regulatory Commission (NRC), FPL agreed to supplement the exemption request (Reference 1) with additional, clarifying information. The enclosure to this letter provides the supplemental information. Further, in l ieu of the approval date requested in the subject exemption request, FPL requests approval on or before January 8, 2024, which is the date specified in Federal Register 88 FR 15864 for final rule compliance.
This letter contains no regulatory commitments.
Should you have any questions regarding this submission, please contact Mr. Kenneth Mack, Fleet Licensing Manager, at 561-904-3635.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on the 29th day of November 2023.
Sincerely,
Dianne Strand General Manager, Regulatory Affairs Flor ida Power & Light Company
Enclosure :
Supplement to St. Lucie Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule
Florida Powe r & Light Company
15340 Endeavor Dr. Jupiter, FL, 33478 L-2023-175 Page 2 of 2
cc: USNRC Regional Administrator, Region II USNRC Project Manager, St. Lucie Nuclear Generating Station USNRC Senior Resident Inspector, St. Lucie Nuclear Generating Station Mr. Clark Eldredge, Florida Department of Health
L-2023-175 Enclosure Page 1 of 2
Supplement to St. Lucie Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notificati ons Final Rule
In Reference 1, Florida Power & Light Company (FPL) requested an exemption from the Enhanced Weapons, Firearms Background Checks, and Security Event Notifications final rule (hereto referred to as the final rule), as specified in Federal Register [88 FR 15864], for St. Lucie Nuclear Plant, Units 1 and 2 (St. Lucie). The proposed exemption would relieve compliance with the final rule at St. Lucie until December 31, 2024, or 180 days following publication of the Regulatory Guides (RGs) described in Federal Register 88 FR 15864, whichever is later.
In a November 20, 2023, clarification call with the NRC, FPL agreed to supplement the subject exemption requests with additional, clarifying information, which is provided below.
Supplemental Information:
FPL is requesting for St. Lucie, an exemption from the specific requirements, as described below, associated with the Enhanced Weapons, Firearms Background Checks, and Security Event Notifications final rule that would defer compliance with those provisions until December 31, 2024, or 180 days following publication of final RGs, whichever is later.
FPL is not requesting for St. Lucie, an extension to the compliance date for specific requirements in Title 10 of the Code of Federal Regulations (10 CFR) Part 73, Subpart B, "Enhanced Weapons, Preemption, and Firearms Background Checks," described in:
- 10 CFR 73.15, "Authorization for Use of Enhanced Weapons and Preemption of Firearms Laws,"
and
- 10 CFR 73.17, "Firearms Background Checks for Armed Security Personnel.
FPL is requesting for St. Lucie, an exemption from specific requirements below until the later of December 31, 2024, or 180 days following publication of the final RGs:
- 10 CFR Part 73, Subpart T, Security Notifications, Reports, and Recordkeeping,
- 10 CFR 73.1200(a) through 10 CFR 73.1200(t), Notification of Physical Security Events,
- 10 CFR 73.1205(a)(1) through 10 CFR 73.1205(e), Written Follow-up Reports of Physical Security Events,
- 10 CFR 73.1210(a)(1) through 10 CFR 73.1210(h), Recordkeeping of Physical Security Events,
- 10 CFR 73.1215(a) through 10 CFR 73.1215(f), Suspicious Activity Reports.
FPL is requesting for St. Lucie, an exemption from using the definitions for the terms "Contraband," and "Time of Discovery" as recently revised in 10 CFR 73.2, "Definitions," until the later of December 31, 2024, or 180 days following publication of the final RGs. The exemption would not apply to the definitions of those terms that were in effect prior to the issuance of the 2023 revisions.
The St. Lucie site security plan implements the requirements of 10 CFR 73.71, "Reporting of Safeguards Events" for reporting the suspension of security measures.
During the proposed period of exemption, FPL will continue to comply with security event reporting previously required in 10 CFR 73.71, "Reporting of Safeguards Events," and Appendix G to Part 73, "Reportable Safeguards Events, at St. Lucie.
L-2023-175 Enclosure Page 2 of 2
Supplement to St. Lucie Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notificati ons Final Rule
During the proposed period of exemption, FPL will continue to use the definitions for the terms "Contraband" and "Discovery (time of)" in the St. Lucie site security plan consistent with how these terms are currently defined in Regulatory Guide 5.76, Revision 1, "Physical Protection Programs at Nuclear Power Reactors."
Reference:
(1) F l o r i d a Power & Light letter L-2023-158 RE: St. Lucie Nuclear Plant, Units 3 and 4; Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule, November 16, 2023 (ADAMS Accession No. ML23320A266)