ML23312A210

From kanterella
Jump to navigation Jump to search
EIP-ZZ-C0010, Rev. 43, Emergency Operations Facility Operations
ML23312A210
Person / Time
Site: Callaway 
Issue date: 10/26/2023
From: Jeffrey Reed
Ameren Missouri
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
EIP-ZZ-C0010, Rev. 43
Download: ML23312A210 (1)


Text

PROCEDURE REVIEW FORM (PRF)

LO Initiation Initiator:

.-. ---- Date: IQL2L2Q

_ Procedure Dept:

EP Document #:

oQlp New Rev. #

043 (3dígitsrequtred)

Title:

Emergency Operatioiaci1ity Operations Level ofUse:

ElContinuous LReference 1nformation Mu1tip1e UN/A 2.0 Reason for Change/Description of Change (List commitments, CRs, eB Change Requests, OERS, Plant Mods etc. and record nzrnthers here.)

CR 2023065 1 5. Updated references and format. Updated verbiage in step 3 1.3.a See SOC for more detail.

Continued: 0 3.0.

Document Disposition UTemp Change UNew Docure4t

,1UOr Revision UMinor Revision UCancellation Admrnistrative Coirection

_f) L4_

ijr7 tij(/,.,

Dept. IleadorDesignatcdApprover required for AdministrativeCorrections (Snature/P1N/Date)no other snatures required 4.0 Interim Approval (Temp. Change Only)

Temp. Change #:

Expiration Date:

Cognizant SUpIv1sc)1 (StgnitureIPIN/Dat.)

SRI) (Signatui e/PIN/D ik.)

5.0 Comments

Continued: D 6.0 Reviews and Signatures (NOT requiredfor Administrative Corrections)

,,,fivfrf!cE4!d p.pt,I PiN j

IThie I

ClOJ39Attachecl

- PrRL_

. V j519L

. (kiø-z

.. N/A Technical Review U Yes U io Technical Review U Yes U No AddlReview

[

UYes UNo AddlReview j

UAdditional Reviews (See AuachedCAO]39Jorms).

Number ofadditional CAO139s:

Type Coordinator PIN St&nature Date

}

CAt)] 39 Attadzed Uvalidation

I

j Yes U ro 50.59 Review UcA25lo UcA251I UCA2512 I EIN/A (perAPA-ZZ-00143)

Screener Initial / PIN Reviewer foitial / FIN (Dept. Head or I)esignated Approver) Is a Change Management Plan required?

UYes UNo (IF YES, attach CA2?73 or CA2?74)

Is a Cross-DiscipEioary review required? UYes UNo 7.0 Approval (Either approval must be quafl/Iedas PATMPVR or PAT/GAP)? in QuatAfastei)

U Senior Director Nuclear Operations Approval (perAPA-ZZ-t)O1O1) U ORC is required in accordance with APA-ZZ-00091 U Department Head final Review and Approval ORC Meeting:

A190 0001 2 5 35 A210 0062 65 69 M190 0001 Page 1 of3 CA0033 APA-ZZ-OO1O1 Rev. 002

Reference Tracking Parent Document No.:

EIP-ZZ-COO1O Revision No.: 043 Reference Transaction Director item (Document, Characteristic, Director update complete Synopsis, CAR, etc.)

Add Delete Initiat YY I DD RERP SECflQN5210.6 L

i:i RERP SECTION 5.212

I

. 0 RERP SECTION 53.25 I

1 0

RERP SECTION 5.a4.1 I

I D

I U

LI II 0

El 11 0

0 U

1j L--

IL Dc:

II DEJ

II U

LI

0 D

I I

U U

I

/

0 0

II n

n Ii El CAO 134 Rev. 000 Page 1 of 1