ML23298A071
| ML23298A071 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 10/30/2023 |
| From: | Karla Stoedter NRC/RGN-III/DORS/EB1 |
| To: | Patrick Boyle Exelon Generation Co |
| References | |
| EA-23-126 IR 2023011 | |
| Download: ML23298A071 (1) | |
See also: IR 05000237/2023011
Text
Site Vice-President
Dresden Nuclear Power Station
6500 N. Dresden Rd
Morris, IL 60450-9766
SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 -
ACKNOWLEDGEMENT OF RESPONSE TO NRC INSPECTION REPORT
05000237/2023011 AND 05000249/2023011 AND DISPUTED NON-CITED
VIOLATION
Dear Patrick Boyle:
This letter acknowledges your October 6, 2023, correspondence (Agencywide Document and
Access Management System (ADAMS) Accession No. ML23279A071) sent in response to
U.S. NRC Inspection Report 05000237/2023011 and 05000249/2023011 (ML23242A188) dated
September 6, 2023. In your letter, you dispute one non-cited violation (NCV 05000237,05000249/2023011-01) associated with the failure to assure a condition adverse to quality was
corrected. Specifically, the report asserted that corrective actions for a 2020 test control
violation did not correct a violation issued in Inspection Report 05000237/2020001;
05000249/2020001 (ML20133J811). The NRC is currently reviewing your basis for contesting
the violation in accordance with Section 2.8 of the Enforcement Manual. Accordingly, we will
provide the results of our evaluation by written response upon completion of our review.
October 30, 2023
P. Boyle
2
In accordance with 10 CFR 2.390, Agency Rules of Practice, a copy of this letter will be made
available electronically for public inspection in the NRC Public Document Room or in the NRCs
ADAMS, accessible from the NRCs website at http://www.nrc.gov/reading-rm/adams.html.
Should you have any questions concerning this inspection, please contact me at
Karla.Stoedter@nrc.gov or 630-829-9731.
Sincerely,
Karla Stoedter, Chief,
Engineering Branch 1
Division of Operating Reactor Safety
Docket Nos. 05000237 and 05000249
License Nos. DPR-19 and DPR-25
cc: Distribution via LISTSERV
Signed by Stoedter, Karla
on 10/30/23
P. Boyle
3
Letter to P. Boyle from K. Stoedter October 30, 2023.
SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 -
ACKNOWLEDGEMENT OF RESPONSE TO NRC INSPECTION REPORT
05000237/2023011 AND 05000249/2023011 AND DISPUTED NON-CITED
VIOLATION
DISTRIBUTION:
Diana Betancourt
Ken Lambert
ADAMS Accession Number: ML23298A071
Publicly Available
Non-Publicly Available
Sensitive
Non-Sensitive
OFFICE
RIII-EICS
RIII-DORS
NAME
DBetancourt:bw
KStoedter
DATE
10/26/2023
10/30/2023
OFFICIAL RECORD COPY