ML23286A228
| ML23286A228 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 10/20/2023 |
| From: | Luke Haeg Plant Licensing Branch II |
| To: | Basta L Duke Energy Progress |
| Hood T | |
| References | |
| EPID L-2023-LLA-0112 | |
| Download: ML23286A228 (4) | |
Text
October 20, 2023 Ms. Laura Basta Site Vice President H. B. Robinson Steam Electric Plant Duke Energy Progress, LLC 3581 West Entrance Road, RNPA11 Hartsville, SC 29550
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 (EPID L-2023-LLA-0112)
Dear Ms. Basta:
By letter dated August 30, 2023, you submitted three affidavits. All affidavits were executed on March 13, 2023, by Camille Zozula, Manager/Interim Director, Management Systems and Regulatory Compliance, Westinghouse Electric Company LLC (Westinghouse). By this letter, you requested that the information contained in the following documents be withheld from public disclosure pursuant to Section 2.390 of Title 10 of the Code of Federal Regulations (10 CFR):
WCAP-17776-P, Revision 1, Technical Justification for Eliminating Pressurizer Surge Line Rupture as the Structural Design Basis for H. B. Robinson Unit 2, March 2023 (Proprietary)
WCAP-17778-P, Revision 1, Technical Justification for Eliminating Residual Heat Removal (RHR) Line Rupture as the Structural Design Basis for H. B. Robinson Unit 2, March 2023 (Proprietary)
WCAP-17779-P, Revision 1, Technical Justification for Eliminating Accumulator Line Rupture as the Structural Design Basis for H. B. Robinson Unit 2, March 2023 (Proprietary)
Nonproprietary copies of these documents have been placed in the U.S. Nuclear Regulatory Commissions (NRC) Public Document Room and added to the NRC Library in the Agencywide Documents Access and Management System.
The affidavits stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
(e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.
The NRC staff has reviewed your submittal and the material in accordance with the requirements of 10 CFR 2.390 and based on the statements in the affidavits, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the versions of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-0272.
Sincerely,
/RA/
Luke Haeg, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-261 cc: Camille Zozula Manager/Interim Director Management Systems and Regulatory Compliance Westinghouse Electric Company 1000 Westinghouse Drive, Building 1 Cranberry Township, PA 16066 cc: Listserv
ML23286A228 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DNLR/NPHP/BC NAME LHaeg RButler MMitchell DATE 10/12/2023 10/19/2023 10/20/2023 OFFICE NRR/DORL/LPL2-2/BC NRR/DORL/LPL2-2/PM NAME DWrona LHaeg DATE 10/20/2023 10/20/2023