Category:Inspection Plan
MONTHYEARML25010A1402025-01-10010 January 2025 Framatome Document Request - 2025-001 - OPS1 ML24225A1782024-08-12012 August 2024 Framatome Document Request - 2024-003 - OPS2 & PMA ML24184A0652024-06-28028 June 2024 Framatome Document Request RP 2024-003 ML24179A1172024-06-27027 June 2024 Framatome-Richland – Inspection Schedule for Calendar Year 2025 ML24038A2582024-02-0505 February 2024 Document Request for Framatome OPS1 Inspection 07001257/2024001 ML23276A6532023-09-26026 September 2023 Framatome Inc. - Plant Modification-Annual (PMA) Inspection & Nuclear Criticality Safety (2) (NCS2) Inspection - Document Request ML23255A2892023-09-15015 September 2023 Framatome-Richland – Inspection Schedule for Calendar Year 2024 ML23173A0342023-06-21021 June 2023 Framatome, Inc., Inspection Document Request ML21292A2882021-10-19019 October 2021 NRC Inspection Documentation Request - Framatome Inc. (FP & NCS2 - November 2021) ML21160A0182021-04-19019 April 2021 Framatome - NCS 1 and Transportation Document Request 2021-002 ML19170A3092019-06-19019 June 2019 Framatome, Inc., Calendar Year 2020 Inspection Schedule ML18176A1972018-06-25025 June 2018 2019 Framatome Inspection Schedule (Non-Safeguards) 2025-01-10
[Table view] Category:Letter
MONTHYEARML25028A4152025-01-28028 January 2025 Framatome, Inc., (Richland) Summary of Facility Changes Made During Calendar Year 2024 ML25028A3772025-01-28028 January 2025 Submittal of Integrated Safety Analysis (ISA) Summary Annual Update for Framatome Lnc.S (Framatomes) Richland, Washington Fuel Fabrication Facility ML25016A0582025-01-21021 January 2025 Framatome - Core Inspection Report 07001257/2024004 ML24348A1932025-01-0606 January 2025 Cover Letter - Request of Supplemental Information of Framatomes Application for a License Amendment B ML24297A3032024-11-0606 November 2024 Cover Letter - Acceptance of Framatome Triennial Update to Decommissioning Funding Plan ML24264A1712024-09-20020 September 2024 Framatome, Inc. - License Amendment Request for TRISO Fuel Production at the Framatome Fuel Fabrication Facility in Richland, Wa ML24250A2012024-09-0606 September 2024 Triennial Update to Decommissioning Funding Plan (DFP) for the Framatome Inc., Richland Nuclear Fuel Fabrication Facility ML24211A0592024-07-29029 July 2024 Framatome Inc. – Physical Security Core Inspection Report 07001257-2024401 Public ML24190A0292024-07-19019 July 2024 Framatome - Richland - Core Inspection Report 07001257/2024002 ML24179A1172024-06-27027 June 2024 Framatome-Richland – Inspection Schedule for Calendar Year 2025 ML24116A2922024-04-29029 April 2024 Framatome-Richland - Core Inspection Report 07001257/2024001 ML24092A2752024-04-0303 April 2024 Acceptance for Review of Framatome, Incs Triennial Update to Decommissioning Funding Plan - Enterprise Project Identifier Number L-2024-DFA-0000 ML24065A4842024-03-0808 March 2024 Framatome Inc. - Licensee Performance Review - Nuclear Regulatory Commission Inspection Report 07001257/2024005 ML24026A2792024-01-31031 January 2024 Framatome - Richland – Integrated Inspection Report 07001257/2023004 ML24031A5432024-01-23023 January 2024 Triennial Update to Decommissioning Funding Plan (DFP) for the Framatome Inc., Richland Nuclear Fuel Fabrication Facility Cover Letter ML23352A3912023-12-20020 December 2023 Framatome Inc. - Richland Material Control and Accounting Program Inspection Report 07001257-2023401-Public Cover Letter ML23313A0772023-11-27027 November 2023 Framatome Inc. - Request to Amend License and Approve Criticality Safety Methods - License Amendment 19 (Enterprise Project Identification Number L-2023-LLA-0073) ML23296A0072023-10-25025 October 2023 Framatome-Richland - Core Inspection Report 07001257/2023003 ML23291A2042023-10-18018 October 2023 Framatome Inc., Richland Nuclear Fuel Fabrication Facilitys Request to Amend License No. SNM-1227 and Approval of Criticality Safety Methods ML23255A2892023-09-15015 September 2023 Framatome-Richland – Inspection Schedule for Calendar Year 2024 ML23254A2502023-09-13013 September 2023 Request of Additional Information Letter to Framatome ML23202A2022023-07-24024 July 2023 Framatome Richland Core Inspection Report 07001257/2023002 ML23198A3172023-07-17017 July 2023 Framatome Inc. Richland Nuclear Fuel Fabrication Facilitys Revised Chapter 1 of License No. SNM-1227 ML23144A3092023-06-21021 June 2023 Acceptance Letter for Request by Framatome for a License Amendment for an Approval of Criticality Safety Methods ML23144A3372023-06-12012 June 2023 Letter to Framatome Approval of Request to Withhold Proprietary Information ML23145A3082023-06-0202 June 2023 Framatome - Licensing Project Manager Change Letter ML23137A3962023-05-17017 May 2023 Framatome, Inc., Richland Nuclear Fuel Fabrication Facility’S Request to Amend License No. SNM-1227; and Approval of Criticality Safety Methods ML23137A4062023-05-17017 May 2023 Framatome, Inc., Submittal of NRC Form 327s Which Report the Results of Material Balance Accounting and Seid Calculations for the Period March 22, 2022 to March 20, 2023 ML23089A2592023-04-10010 April 2023 2023-001 Framatome-Richland - NRC Integrated Inspection Report 07001257/2023001 ML23089A2602023-03-30030 March 2023 Framatome, Inc. - 2023 Fee Increase for Fuel Cycle Licensees; License No. SNM-1227; Docket No. 70-1257 ML23054A2562023-02-23023 February 2023 60-Day Report to January 2, 2023, Incident Reported Under 10 CFR 70 Appendix a Concurrent Report (NRC Event No. 56292); Framatome Richland Facility; License No. SNWI-1227; Docket No. 70-1257 ML22336A0992023-02-0303 February 2023 Cover Letter - Framatome Proprietary Approval 3x Letter of Intent Submittals 11/21/2022 and 11/29/2022 ML23030B6172023-01-31031 January 2023 Framatome-Richland - Core Inspection Report 07001257/2022004 ML23025A3172023-01-25025 January 2023 Submittal of Integrated Safety Analysis (ISA) Summary Annual Update for Framatome Inc.S (Framatomes) Richland, Washington Fuel Fabrication Facility ML22341A1562022-12-0707 December 2022 60-day Follow Up Report for an Incident Reported Under 10 CFR 70 Appendix a (C) Concurrent Report (NRC Event No.56713); Framatome Richland Facility ML22272A0252022-10-0404 October 2022 Framatome-Richland -Integrated Inspection Report 07001257/2022003 ML22263A4652022-09-20020 September 2022 Framatome, Inc. Submittal of Revised Fundamental Nuclear Material Control Plan ML22255A0122022-08-31031 August 2022 Framatome Inc. - Required Reporting of Effluents Per 10 CFR 70.59 ML22238A1602022-08-24024 August 2022 Framatome Richland Facility Emergency Plan Version 16.0 ML22236A5872022-08-23023 August 2022 Framatome Inc., Richland Nuclear Fuel Fabrication Facilitys Intent to Amend License No. SNM-1227; ML22201A5352022-07-21021 July 2022 Framatome 2022-002 Integrated Quarterly Inspection Report ML22192A1272022-07-11011 July 2022 Framatome, Inc., 60-day Report for a May 12, 2022 Incident Reported Under 10 CFR 70 Appendix a 24-hour Report (NRC Event No. 55897) ML22154A4382022-07-11011 July 2022 Cover Letter - Framatome Inc. - Request to Amend License and Approve Criticality Safety Methods - License Amendment 18 (Enterprise Project Identification Number L-2021-LLA-0218) ML22187A1892022-06-29029 June 2022 Framatome-Richland - Inspection Schedule for Calendar Year 2023 ML22187A0392022-06-28028 June 2022 Framatome Documentation Request - 2022-003 PMT ML22137A1282022-06-23023 June 2022 Cover Letter - Framatome- DFP Info and Form 327 Proprietary Review ML22166A3432022-06-10010 June 2022 Framatome Lnc., Submittal of Quality Assurance Program, FS1-0011462, Revision 8.0, 10 CFR 71, Subpart H Quality Assurance Program Description for Packaging and Transportation of Radioactive Materials for Us Fuel ML22132A2292022-05-12012 May 2022 Framatome, Inc., Submittal of NRC Form 327 ML22132A2952022-05-12012 May 2022 Framatome, Inc., Submittal of Triennial Update to Decommissioning Funding Plan (DFP) for the Richland Nuclear Fuel Fabrication Facility ML22087A1212022-03-31031 March 2022 Cover Letter Framatome Inc., - Request for Additional Information Regarding License Amendment Request for Approval of Criticality Safety Methods (Enterprise Project Identification Number L-2021-LLA-0218) 2025-01-06
[Table view] |
Text
Mr. Lance Stephens Site Manager Framatome Inc.
2101 Horn Rapids Road Richland, WA 99354
SUBJECT:
FRAMATOME-RICHLAND - INSPECTION SCHEDULE FOR CALENDAR YEAR 2024
Dear Mr. Stephens:
Enclosed is the schedule of inspections to be performed by the U.S. Nuclear Regulatory Commission (NRC) inspectors at the Framatome-Richland facility in calendar year 2024. The inspection schedule is provided in advance to minimize the resource impact on your staff and allow for the resolution of any scheduling conflicts and personnel availability issues, well in advance of inspector arrival onsite.
Please note that any regional initiative or reactive inspections are not included in the schedule.
If circumstances arise which cause the NRC inspectors to change the dates of the planned inspections, we will contact you to discuss the change as early as possible. Please contact Cynthia Taylor (404) 997-4480 with any questions or concerns you may have regarding this letter or the inspection schedule.
This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html, and at the NRC Public Document Room, in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Eric C. Michel, Chief Projects Branch 2 Division of Fuel Facility Inspection Docket No. 07001257 License No. SNM-1227
Enclosure:
As stated cc w/ encl: Distribution via LISTSERV September 14, 2023 Signed by Michel, Eric on 09/14/23
ML23255A289 X
SUNSI Review X
Non-Sensitivebct
Sensitive X
Publicly Available
Non-Publicly Available OFFICE RII/DFFI RII/DFFI RII/DFFI NAME C. Taylor T. Vukovinsky E. Michel DATE 09/13/2023 09/14/2023 09/14/2023
Enclosure 2024 U.S. NUCLEAR REGULATORY COMMISSION INSPECTION/ACTIVITY PLAN FOR FRAMATOME-RICHLAND Dates Number of Inspectors Description/Inspection Procedures (IPs)
March 4 - 8 2
Operational Safety 1 (IP 88020)
April 1 - 5 2
Radiation Protection (IP 88030)
May 13 - 17 2
Nuclear Criticality Safety 1 (IP 88015)
Transportation (IP 86740)
May 20 - 24 1
Physical Security (Various IPs)
September 9 - 13 4
Operational Safety 2 (IP 88020)
Plant Modifications - Annual (IP 88070)
November 21 - 25 2
Nuclear Criticality Safety 2 (IP 88015)
Emergency Preparedness (IP 88050)