7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-17, Drawing 108017, Rev. 70, Sheet 4, Saltwater Systems
ML23241A457
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/25/2023
From:
Pacific Gas & Electric Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML23241A052 List: ... further results
References
DCL-23-044
Download: ML23241A457 (1)


Text

N 0

N I

Ol 0

§,

Q) u

+-

  • C 0

?go sr

  • I 0 I'-

I sr sr V) o 1 Z a,1'-N o-..

-0 L 11 CO <I) o:: O U) w -

i f-II Vl ZO

<I: (") <I:

o::ou E

D C

40 41 NOTES:

I. ALL PIPING ON THIS SHEET IS PG&E CLASS E UNLESS OTHERWISE NOTED.

42

2. DEMUSSELING PROCEDURE STARTS AFTER THE SCREENS OF BOTH UNITS HAVE BEEN WASHED.@:D
3. SEAL INJECTION 3/4" FLEXHOSE CROSS TIE.@]>

4, TEMPORARY CONNECTION INSTALLED AT FX FOR FRESH WATER DEMUSSELING PROCESS, WHICH IS USED AS ALTERNATIVE TO HT DEMUSSELING.@:f)

5. COMPLIES WITH "S" SPECIFICATION EXCEPT FLANGES ARE 2" 150* FFSW Al82 GR 304. (45,46,47,48-E)
6. CHECK VALVES ARE NUPRO SS-CHSl2-10.(45,4B-EtD)
7. BALL VALVES ARE WHITEY SS-63TSl2.(45,4B-EID)

DE.MUSSELING FLOW SCHEME LEGEND CLOf>ED GATE 43 I NPGI C 1 size 01-19-2021 ZNS4 FXC2 NIA NOT REQUIRED PER CF3. ID5 DATE OWN RE IV PRO FESS IONAL ENGINEER 44 E 945 46 A l DECHLORINATION

,__7_0___,

TANK/PUMP/MANIF E c CONFIGURATIO FCV-729 A l DECHLORINA

,__7_0___,

TANK/PUMP/MA CONFIGURAT E G 17 47 49 il*4456

_<},i':;;;=-i;;; l= T _ _['-')+=:;;;rL,r7.1::{~,-,L:l?.-i:7.'~

MAIN CONDENSER WATER BOX VENT SYSTEM KE COOLEl?S Dl~Allq~---

2-,:..

-t><I- ~

TO INT"'l"I:.

STRUC.1\\JR PE DI SC.

PE*

PE DIABLO CANYON POWER PLANT - PG&E CO.

SALTWATER SYSTEMS DRAWING SHEET PAGE REV 108017 4

0 70 E

D C

B A