ML23241A301

From kanterella
Jump to navigation Jump to search
7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-8, Drawing 102008, Sheet 6A, Rev. 89, Chemical & Volume Control System
ML23241A301
Person / Time
Site: Diablo Canyon  
Issue date: 05/25/2023
From:
Pacific Gas & Electric Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML23241A052 List: ... further results
References
DCL-23-044
Download: ML23241A301 (1)


Text

{{#Wiki_filter:A B C D 0 N ,'l 0/4 OU 60A 61A BATCH TANK OUTLET 578-E C-0250 3/4X420 ~o 8226 2-C58 6047 8783 V- 0265 ~v 3/~X42D 3/~X42D ~o NO TE S: C-0250 8784 V- 0265 198 ALL PIPING JS SPEC. S2 AND 2 ' DIAMETER WITH CLASS I I I I NSULAT IO N EXCEPT AS NOTED.

2.

ALL PIPING IS CODE CLASS E EXCEPT AS NOTED.

3.
4.

TA NKS ARE H ISULATED WI TH CLASS I I I I NSUL ATION ; TANK TOPS ARE NOT INSUL ATED.

5.

TEHPORARY STRAINER I S PLACED IN SPOOL PIECE DURING FLUSHING OPERATIONS, STRAINER MUST BE REMOVED BEFORE PLAN T START-UP.<ili:[)~

6.

BORlC AC I D RESERVE TANKS ARE SUPPLIED WI TH DI APHRAGM MEMBRANE. ~@])

7.

TAN KS AR E NOT 1N@ SCOPE. <IE:D~ 8, NUPROSS - 6UW - JNVALVE.~

9.

WH I TEYSS - 44S6VALVE.~

10. NITROGEN VENT FL OW PA TH PROVIDED BY SIX 1/ 2 "

HOLES I N TANK BLADDER BOLT ING BAR REF; DC-663221-30 1 1. WH I TEY SS - 45S8 VALVE 62A NOTE 11 8227A 2 - X42D 884 6051 6049 PCV 885 1526 63A 64A 65A 66A BOR I C AC I D R E S ER V E TANKS 6048 LONG REC I RC ULA T I ON LI NE SAMPLE REClRC LOOP s-3/4 /PX\ 1525B PRIMARY C- 0250 MAKEUP P-0130 WATER P-0130 6053-11/2 0 - I B 6057-1112 P-0130 6056 - 1112 ~ P - 0130 S-1/a 199-3 3-X42D s-3/4 BART TRANSF ER PUMP 0-1 0C-6632 10-2 4 6049 SHORT REC I RC LINE 20 I -3 605 1 8236 FL USH LINE BYPASS 3 -X 420 FCV 1526 6062-4 8235B P - 0 I 30 P-0 130 PUMP 0 -2 ') SAMPLE REC JRC L OOP S-1/s 'S-3/4 CQ8l 6054 - 1112 P-0 130 0250 6059 -1 1/2 P - 0 I 3 0 f---{><1-+.-' P-0130 S-1/s S-3/s S-3/s NOTE 8 NOTE ( TYP,21 9 SAMPLE S I NK DC - 663221 -4 7 6055 1112 FLOOR DRAIN 0 - 2A /PX\ 1526B C-0250 6060 - 11/ 2 0-2B BAR T REC I RC PUMPS DC-66322 1 -43, 44 P- 0 130 205 08-10-2011 AJFJ FAZI KERSI J, DALAL MEC HANICAL M 16690 3/3 1/20 12 REVISED PER DAS-6.,423 r-~o~,~-~[ --~w,-+~R~[-+-~: v-+-P~R~O~C[~S~s~, o~,-A-L ~[~N~c~, N~,~,R~+-,P~E~J,~s~,-. -+-~P~[.--+-~P~[~[~X~P-. --, 67A 6058 204 P - 0 13 0 6050 P - 0 130 BART RECJR C HEA TER 0C-663221 -'1 1, '12 68A 69A ~v P - 0 l 30f P-0 130 558-E P-0130 BAST Fl LL P - 0130 HEADER A ~ PROCESSED WASTE B RECEIVER 21 0 8239 8240 61-A 19 2-C58 ~- X420 206 NON-INSUL ATED 6048 P - 0 130 UNIT 2 LIOU! D ~v ~v HOLDUP 3/4X 420 3/4X42D TANKS 824 1 209 INL ET HOR. 2-(58 2-X420 Al &h P - 0 I 30 C 205 D UN IT E DIABLO CANYON POWER PLANT - PG& E CO. CHEMICAL & VOLUME CONTROL SYSTEM DRAW i NG SHEET PAGE REV 102008 6A 0 89}}