ML23241A222

From kanterella
Jump to navigation Jump to search
7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 108021, Sheet 6, Rev. 49, Engine Fuel Oil System 2-1
ML23241A222
Person / Time
Site: Diablo Canyon  
Issue date: 05/25/2023
From:
Pacific Gas & Electric Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML23241A052 List: ... further results
References
DCL-23-044
Download: ML23241A222 (1)


Text

A B

C D

60 NOTE 3 LS DAY TANK VENT

~

K-2 192-1 1/2

11/;"

F L EX HOSE 61 S2-3/4"

~

204 LOA

[L FLS J DIESEL FUEL OI L DAY TANK 0

40 I - I/z" K-3/4" 3/4" TUB I NG A

2-1 NOTE 12 ITYP.

61 62 63 1/~*

FLE X HOSE NOTE IOFln NOTE 15 1

45V I S2-3/4" MAGNET JC DR I VE MAKE-UP PUMP (TIMER CON TROLLED!

S2 3/4" 64 65 66 NOTE 11 NOTE 9

[qil cp L~

E/No_T_,_,7--------- -----~a'... 'f-l--l_-~ _ _j__J PRIM I NG TANK PR 1 M 1 NG PUMP HAND OPERATED 45V I

,-,VENT NOTE 16.

'/2" 43 1f2*

FLE X HOSE

-ffi NOTE 15 1/2' FLEX HOSE 1f2*

FLE X HOSE AS D.R.

,l_Q_,.

45VI 3/s" NOTE 6 Pl 625.

LI SIG HT 3 14 GLASS

,-,V ENT NOTE 16 67

~

y

  • -3/s "

PR I MARY

-ill T_

,--- 7--+---F-'L,EXH ro+sc:,>---* --'-'/_,2_" ----'---'---, SEFCIOtTotRRY

(

CLEAN-OUT POR T

( TYP.3 EA. I FILTER L.J0RA1N NOTE 17 ENGINE RV-267 F U EL OIL SYS TEM 2 -

I REFERENCE MFR.

DWG. DC-66 3082-4 01-03-2013 AJFJ FxC2 K ERSI J.

DALAL MEC H ANICAL M 16690 3/3 1/20 1<1 REVISED PER DFT - 7.,,I 94 I r-~o~,~-~[ --~w,-+~R~[-+-~: v---+-P~R~O~CC~S~S~l o~-,-,-, ~[~N~G~l N~,~,R~+-,P~E~J l~S~C-. -+-~P~[.--+-~P~[~[~X~P-. -,

L.JQRAIN NOTE 17 PCV-82 d9o Pl 68 69 NOT ES:

I.

[

J MANUFACTURER NO.

IOENT IF I CAT I ON

2.

MANUAL L Y OPERATED USED ON IN JT IA L START ONLY TIIT) 3, SEE l-1ANUFACTURER OWG, 663082 - 4 ~

4.

MOUN T ED ON ENGINE CONTROL PANEL ~

5.

BY SUPPLIER UNDER SPEC. 8735 WISMER AND BECKER~

6.

VALVETAG 45VISPECS AREINDWG05347'3~

7.

OPE N OTO 100 RPM, CLOSED -A BOVE 100 RPM~

8.

WHITE YBALLVAL VEMODE L uSS-45F8 2E:I) 9.

PLUG VALVE MODEL *SS-6P4T TIS:)

10.

PUMP AND TEE LOCATED AT SLJCTJON BELOW LOWEST DAY TANKFUELOILLEVELN])

I I.

WH I TEY CO.

SS-3NTRF4-A )63 - C,65 -B)

12.

MANUAL VALVES PER OWG 6 00 6473 - 222ILI)

13.

1f2 " VE L AN GATE VAL VE STOCK NO. 93-6B40lli:])

I 4.

"' DENOT ES MANUFACTURER SUPP L I ED I NS TR UMENTS AND EQU IPMENT.

IT 1S ACCEPTAB L E TO REPLACE MANUFACTURER A l SUPPLIED INSTRUMENT TUBING WITH PG&E SUPPL I ED S-SPEC

,_rr,.

STAINLESS STEEL TUBING

15.

CODE CLA SS E P JP ING IS QUALITY CLASS 'S' AND SE I SMICALLY EVALUATED FOR HOSGRI.

16.

EAS T AND WEST PRIMARY AND SECONDARY FILTER VENTS HAVE A BL EEDER.

I 7.

EAST AND WEST PR I MARY AND SECONDARY FILTER ORA 1 NS HAVE A PL UG.

18.

DISTANCE FROM BOTTOM OF FOOT VALVE TO BOTTOM OF DA Y TANK

  • 11/i."

62 D 45V3 ll< -3/4 1/2' TU BING 2

1f2" FLE X HOSE

  • Pl

[FOPG1 626 NOTE 4

  • -3/s" 1/2 FLEX HOSE FUEL I NJECTION SYSTEM ON DIESEL ENG I NE DC -6 63082 - 2 I/4FLOAT CHEC K JD NOTE 8 UNIT 2 1/4"FLOAT CHECK JD NO TE 8 DIAB LO CA NYON POWER PLANT - PG&E CO.

DIESEL ENGINE-GENERATOR ASSOCIATED SYSTEMS DRAW i NG SHEET PAGE REV 10802 1 6 0 49 A

B C

D E