ML23241A145

From kanterella
Jump to navigation Jump to search
7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-17, Drawing 102017, Sheet 3
ML23241A145
Person / Time
Site: Diablo Canyon  
Issue date: 05/25/2023
From:
Pacific Gas & Electric Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML23241A052 List: ... further results
References
DCL-23-044
Download: ML23241A145 (1)


Text

>65-E

, 63A *E UN IT 2 31 32 33 34 S-1/,

INTAKE STRUCTURE SU MP PUMPS DC - 686369 - 6 E-469 - 11/,

C-0 I 40 S-1/2 I - 2 E-468 - I'/,

C-01 40

_______ l@f-c1 ___ ~

_ c_2_

- 4_____, ~

>-----~(1:DI I B-6 176-<

] f----f---

~ C2~--4_____, ~

---jld}~) I B-6177-4 TRAVELI NG SC RE ENS OC-663 022 -1 8.:2 o:,;,_,,.:

_;,[7.

NO TE 2 ( TYPl 35 V-01 66 V- 0 I 66 ASW PP I - I VAUL T DRA IN ASW PP I - 2 VA ULT DRAIN 36 3" f5 150* B. F.

TR UCK FI LL CONN E-4 70 - 3 E-'/,

11z 11 0 I 09 SANPL E CONN 37 38 0 I 0 9 E-51 7 - 4 R O I 09 4"

4" 0253 4 70 - 3 6 I 70 E-6 169-3 R- 0 109 3" R-0109 3 "

( I - I )

( I -2)

TO CWPS SUCTION BA YS NOTE 5 F2 - 22 14-6 l 1-D SCREEN REFUS E SUNP 5~ -A I

STR 29 SLOWDOWN INT AKE STRU N

G-675 -1 6 I 2 "

PCI

<IillJIE>I 2 "

I 5:

PC 15 2 G-6 U-2 116 "

DE,;ATER ING PP HOOKUP E-46 46-6

~

0253 fr Is~

r-- --Jc-----

C- 0253 E-4 646 - 6 6 "

~f--..,._,-----~----,11 U - I

@+/-o :!:s ls' DEWA TER I NG PP HOOKUP NO TES I, VALV ES I N THE I NTAKE STRUCTURE WITH PG&E MA RK NOS.

ARE FURNISH ED BY SPEC.

8 74 9.

UNL ESS OTH ERW I SE NO TED. af6)

2. SW I NG CHECK VALVE EAGL E SERIES 10 A l -B r OR STA I NL ESS STEEL.
3.

<JD>

4" - 150 LB. FLANGED{

oow CHEM. MOO.

0676767 D I APHRAGM VA L VE:

ON LI NE 70 6 <fil::>

DOW MODE L 373 ON L INE 707. ~

5.

6.

7.

8.

(EG)

@:(0 Itx1I NOT E'-;-;i B-020 2 FZ-357 4 - 6 (EG)

Itx1I B-020

-3573-6 (EG)

Itx1I B- 020

- 3572 - 6 (EG)

Itx1 B-0 20 5 71 -6 F2-I 302-8 SEC. D G-I 30 I - I 0 SEC. C F2-35 72-6 G-1300- 14 SEC. B FCV-489 F-3577-4

~

Ac~WL Rcg~ T TI_Js,:_::-,~==----,-----1 NOTE DI SCH G-502-16 NOTE I 2 HYPOCHL ORITE ~

PUNP SYS TEM T

FCV 490 3579 - 4 T

I NOTE 41 NO TE 6 I - I T

C-0253 14,,

SCREEN WASH PUMPS DC - 663023 - 1 G-502-16 SCR EE N WA SH STR.

DC-663 025 - I 6

T

{ NOTE 171 G-477-16 G-942-24 G-943 - 16 SW-0-248 E,: -35 80 -2t

_-ffi C-0253 B- 0 I I I

~

Sl3 - 944 - 16 ©-

I~

G 944 - I 6 2

ERA TED

\j OTOR ATES OTE 71 G-7 00 -1 8

~

ili PVDF SPACER WITH PORT I NG TO AL LOW CHLORINA T ION BY EI THER I NTERMI TT ENT OR CON T I NUOUS SUPP LY VI A 2" PIPE AND 1/2 TUB I NG RESPECTIVELY.1/2" HASTELLOY TUB I NG I S I NS I DE 2 " P I PE BETWE EN SPACER AND

<- l4EL.~

F2 SPEC.

ON SCREEN WASH SYSTEM HAS LINING FOR NON - VEN TED P I P I NG.<TI])

9.

I 0.

I I.

12.

13.

14.

E 46 7 2L..J NO TE -

)

08

~

HYPOCHLOR I TE PUMP SYSTEM

{ UN I T 2 I I - 2 SCREEN WASH 2" APCO MODEL 14 5C, AI R RE LEASE/VA CUUM RE LI EF ~

2" N!B CO PVC BAL L VA L VE <::TI}),

1/i" N I BCO PVC BALL VALVE (TY P OF 5) <:TIJ) 2" THI CK PVDF SPACER / INJECTOR~

FOR EXPANSION JO I NT,

SEE DWG 663323 -1 2 <JED PORTI ON OF TH I S PIP I NG MAY I NC LUDE PI PI NG SPEC " C3,

SEE P I P I NG I SOMETRIC FOR DET AIL S. ~

HASTELLOY TUBING RUNS ADJACEN T TO 2"P VC IN

15.

TEST CONNECTION VA L VES MAY BE REP LACED WI TH PL UG~

TEN 1/i" DI A. HOLES IN 2" PIP E. SEE NOTE 4.<}B) 16.

2" GOLDEN ANDERSON, AIR RE LEASED/VA CUUM VA LVE~

ASW GATE MOTOR I S REMOTE L Y OPERAT ED FROM I NTAK E.

l7. STRA I NER INTERNALS REMOVED.

ALL PIPES ON THI S SHEE T ARE PG&E CLASS " E" UNLESS

18.

VA L VE JS BURIED SOUTH OF INTA KE, EXCAVATE PRIOR TO USE.

OTH ERWISE NOTED.<fil)

~

19. REFERENCE RPE 8><3656 FOR THE REPLACEME NT OF THESE VA L VES.

SYSTEM

,_0_5_-_1_6_-_2_0 _I 6-+-Z_N_S_4+-F_x_C2-+-_N_/ A-+_N_OT_ R_E_O_U_I_R_E_D_P_E_R_ C_F_3_. _I D_5-+-----+----+-------< REV l SED PER DF T 7

  • 368 8 DAT E DWN RE IV PROFESS I ONAL ENGINEER PE DISC.

PE EXP.

03)

I G-0285 D

B- 0202 G- <

UN I T UN IT UN IT G-7 00 -1 8 TO COV E

{ EXISTING!

LJ NI T NOTE DIAB LO CAN YON POWER PL ANT SALTWATER SYSTEM:

DRAWING SHEET 1020 17 3