ML23160A060
| ML23160A060 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 03/16/2023 |
| From: | Constellation Energy Generation |
| To: | NRC/RGN-III |
| Gregory Roach | |
| Shared Package | |
| ML22007A046 | List: |
| References | |
| SVPLTR: #23-0002 | |
| Download: ML23160A060 (1) | |
Text
TQ-AA-150-J020 Revision 01 Page 1 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Job Performance Measure IN FIELD ACTIONS FOR A FIRE IN THE 903-5 PANEL LASTING GREATER THAN 10 MINUTES JPM Number:
S-N-i Revision Number:
01 Date:
11/22 Developed By:
Derek Siuda
/
Exam Author: Print / Sign Date Approved By:
Jonathan Chapman
/
Facility Representative: Print / Sign Date
TQ-AA-150-J020 Revision 01 Page 2 of 9 SRRS: 3D.100; There are no retention requirements for this section S-N-i Rev 01 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:
All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
- 1. Task description and number, JPM description and number are identified.
- 2. Knowledge and Abilities (K/A) references are included.
- 3. Performance location specified. (in-plant, control room, simulator, or other)
- 4. Initial setup conditions are identified.
- 5. Initiating cue (and terminating cue if required) are properly identified.
- 6. Task standards identified and verified by instructor or SME review.
- 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
- 8. IAW NUREG 1021 Appendix C, clearly identify the task standard (i.e., the predetermined qualitative or quantitative outcome) against which task performance will be measured.
- 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure: DOA 0010-10 Revision:
28 Procedure:
Revision:
Procedure:
Revision:
- 10. Verify cues both verbal and visual are free of conflict.
- 11. Verify performance time is accurate.
- 13. When JPM is initially validated, sign and date JPM cover page. For subsequent validations, sign and date below:
/
SME / Instructor (Print/Sign)
Date
/
SME / Instructor (Print/Sign)
Date
/
SME / Instructor (Print/Sign)
Date
TQ-AA-150-J020 Revision 01 Page 3 of 9 SRRS: 3D.100; There are no retention requirements for this section S-N-i Rev 01 Revision Record (Summary)
Revision #
Summary 00 New JPM for ILT 20-1 (2021-301) CERT Exam 01 Updated for the ILT 22-1 (2023-301) NRC Exam
TQ-AA-150-J020 Revision 01 Page 4 of 9 SRRS: 3D.100; There are no retention requirements for this section S-N-i Rev 01 SIMULATOR SETUP INSTRUCTIONS N/A - In-Plant JPM DOCUMENT PREPARATION Need a clean copy of current revision of DOA 0010-10, FIRE/EXPLOSION, to provide to examinee.
TQ-AA-150-J020 Revision 01 Page 5 of 9 SRRS: 3D.100; There are no retention requirements for this section S-N-i Rev 01 INITIAL CONDITIONS
- 1. Unit 3 is at full power when a fire occurred in the 903-5 panel.
- 2. ALL attempts to put out the fire have been unsuccessful, and a Manual SCRAM was inserted.
INITIATING CUE
- 1. You are an extra NSO.
- 2. The Unit 3 Unit Supervisor has directed you perform the actions for DOA 0010-10, FIRE/EXPLOSION, Attachment A, ACTIONS FOR FIRE NOT EXTINGUISHED IN 10 MINUTES, Step 1.b
- 3. Notify the Unit 3 Supervisor upon task completion.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
TQ-AA-150-J020 Revision 01 Page 6 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-i Rev 01 JPM Start Time:
JPM Sequence #:
of 10 / 11 Task Standard:
The Examinee will perform actions due to a fire in Panel 903-5 per DOA 0010-10, FIRE/EXPLOSION, Attachment A, ACTIONS FOR FIRE NOT EXTINGUISHED IN 10 MINUTES.
STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Provide the candidate with a clean copy of DOA 0010-10, FIRE / EXPLOSION Note If the candidate asks about Tech Spec 3.6.1.3, for Primary Containment Isolation Valves, state:
Another NSO is addressing the Tech Specs.
- 1.
Proceed to step G.3 of procedure.
Step G.1 identifies the bypass for Drywell Cooler Trip is located in Step G.3
- 2.
Obtains a copy of DOA 0010-10, Attachment B Locates a copy of Attachment B in the DOA that was provided, or finds the copy located at MOV 2-0220-1 or 3-0220-1.
- 3.
Verifies that valve 2-0220-1 is in the CLOSED position.
Contacts the MCR and verifies that valve 2-0220-1 is in the CLOSED position.
Cue MOV 2-0220-1 is CLOSED.
- 5.
Notifies the SM/NSO that the breaker for MOV 2-0220-1 is OPEN.
Contacts the NSO and SM and informs them that the breaker for MOV 2-0220-1 is OPEN.
Cue NSO/SM acknowledges report.
- 6.
Proceeds to U3 RBX EL 517, and locates the breaker for MOV 3-0220-1, located at panel 38-1-1, on wall south of MCC 38-1.
Locates breaker MO 3-0220-1, U3 MN STM LINES INBD DRN VLV, at panel 38 1.
- 7.
Verifies that valve 3-0220-1 is in the CLOSED position.
Contacts the MCR and verifies that valve 3-0220-1 is in the CLOSED position.
Cue MOV 3-0220-1 is CLOSED.
- 8.
Opens the breaker for MOV 3-0220-1 at panel 38-1-1.
Identifies and opens the breaker for MO 3-0220-1, U3 MN STM LINES INBD DRN VLV, at panel 38-1-1.
Cue Breaker MO 3-0220-1, U3 MN STM LINES INBD DRN VLV is open
TQ-AA-150-J020 Revision 01 Page 7 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-i Rev 01 STEP ELEMENT STANDARD SAT UNSAT Comment Number
- 9.
Notifies the SM/NSO that the breaker for MOV 3-0220-1 is OPEN.
Contacts the NSO and SM and informs them that the breaker for MOV 3-0220-1 is OPEN.
Cue NSO/SM acknowledges report.
- 10.
Proceeds to the 250VDC MCC #2 (Bus 2A) to pre-stage in case an entry into DSSP 0100-CR is required.
Proceeds to the 250VDC MCC #2 (Bus 2A)
(located in U2 RB 570 south)
- 11.
Notifies Unit Supervisor of task completion.
Unit Supervisor notified of task completion.
Cue Acknowledge the completion of the task.
END JPM Stop Time:
TQ-AA-150-J020 Revision 01 Page 8 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-i Rev 01 JPM
SUMMARY
Operators Name:
Emp. ID#:
Job
Title:
Title:
In Field Actions for a Fire in the 903-5 Panel Lasting Greater Than 10 Minutes JPM Number: S-N-i Revision Number: 01 Task Number and
Title:
299LS4, Perform Safe Shutdown Procedure CR for a fire in the control room.
Task Standard: The Examinee will perform actions due to a fire in Panel 903-5 per DOA 0010-10, FIRE/EXPLOSION, Attachment A, ACTIONS FOR FIRE NOT EXTINGUISHED IN 10 MINUTES.
K/A Number and Importance: 295016 G.2.4.34 4.2 Suggested Testing Environment:
In-Plant Alternate Path:
Yes No SRO Only:
Yes No Time Critical:
Yes No Reference(s):
Procedure: DOA 0010-10 Revision:
28 Procedure:
Revision:
Procedure:
Revision:
Procedure:
Revision:
Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
12 minutes Actual Time Used:
minutes EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory NOTE: Enter finalized grading, comments, and notes relevant to this evaluation in the associated TQ-AA-150-F03A/B. (See AR 4282419).
Evaluators Name (Print):
Evaluators Signature:
Date:
TQ-AA-150-J020 Revision 01 Page 9 of 9 SRRS: 3D.100; There are no retention requirements for this section S-N-i Rev 01 INITIAL CONDITIONS
- 1. Unit 3 is at full power when a fire occurred in the 903-5 panel.
- 2. ALL attempts to put out the fire have been unsuccessful, and a Manual SCRAM was inserted.
INITIATING CUE
- 1. You are an extra NSO.
- 2. The Unit 3 Unit Supervisor has directed you perform the actions for DOA 0010-10, FIRE/EXPLOSION, Attachment A, ACTIONS FOR FIRE NOT EXTINGUISHED IN 10 MINUTES, Step 1.b.
- 3. Notify the Unit 3 Supervisor upon task completion.
TQ-AA-150-J020 Revision 01 Page 1 of 10 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Job Performance Measure BYPASS THE TRIP OF DRYWELL COOLERS JPM Number:
S-N-j Revision Number:
14 Date:
11/22 Developed By:
Derek Siuda
/
Exam Author: Print / Sign Date Approved By:
Jonathan Chapman
/
Facility Representative: Print / Sign Date
TQ-AA-150-J020 Revision 01 Page 2 of 10 SRRS: 3D.100; There are no retention requirements for this section S-N-j Rev 14 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:
All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
- 1. Task description and number, JPM description and number are identified.
- 2. Knowledge and Abilities (K/A) references are included.
- 3. Performance location specified. (in-plant, control room, simulator, or other)
- 4. Initial setup conditions are identified.
- 5. Initiating cue (and terminating cue if required) are properly identified.
- 6. Task standards identified and verified by instructor or SME review.
- 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
- 8. IAW NUREG 1021 Appendix C, clearly identify the task standard (i.e., the predetermined qualitative or quantitative outcome) against which task performance will be measured.
- 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure: DEOP 0500-02 Revision:
22 Procedure:
Revision:
Procedure:
Revision:
- 10. Verify cues both verbal and visual are free of conflict.
- 11. Verify performance time is accurate.
- 13. When JPM is initially validated, sign and date JPM cover page. For subsequent validations, sign and date below:
/
SME / Instructor (Print/Sign)
Date
/
SME / Instructor (Print/Sign)
Date
/
SME / Instructor (Print/Sign)
Date
TQ-AA-150-J020 Revision 01 Page 3 of 10 SRRS: 3D.100; There are no retention requirements for this section S-N-j Rev 14 Revision Record (Summary)
Revision #
Summary 10 Revised for ILT 15-1 (2016-301) NRC Exam 11 Revised for ILT 16-1 (2017-301) NRC Exam 12 Revised for ILT 19-1 (2020-301) NRC Exam 13 Revised for ILT 20-1 (2021-301) NRC Exam and new revision (01) of TQ-AA-150-J020 14 Updated for the ILT 22-1 (2023-301) NRC Exam
TQ-AA-150-J020 Revision 01 Page 4 of 10 SRRS: 3D.100; There are no retention requirements for this section S-N-j Rev 14 SETUP INSTRUCTIONS This JPM is performed in the plant.
DOCUMENT PREPARATION Provide a clean copy of DEOP 0500-02, BYPASSING INTERLOCKS AND ISOLATIONS.
OTHER PREPARATION Ensure a laser pointer is given to the Evaluator for use during this JPM.
TQ-AA-150-J020 Revision 01 Page 5 of 10 SRRS: 3D.100; There are no retention requirements for this section S-N-j Rev 14 INITIAL CONDITIONS
- 1. A fire has occurred resulting in a loss of the feeder breakers to Busses 33-1 AND 34-1 from Busses 33 AND 34.
- 2. The Unit 3 and 2/3 Diesel Generators have started AND are powering Busses 33-1 and 34-1.
- 3. The loss of Busses 33-1 AND 34-1 caused a spurious trip of the Unit 3 Drywell Coolers.
- 5. Drywell temperature and pressure are rising.
INITIATING CUE
- 1. Unit Supervisor has directed you to perform the in-plant actions to bypass the Drywell Cooler trip signals to allow the restart of the Unit 3 Drywell Coolers for Drywell temperature control in accordance with DEOP 500-02.
- 2. Your Pre Job Brief has been completed.
- 3. Notify the Unit Supervisor when the in-plant actions are complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
TQ-AA-150-J020 Revision 01 Page 6 of 10 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-j Rev 14 JPM Start Time:
JPM Sequence #:
of 10 / 11 Task Standard:
The Examinee will bypass the Drywell Cooler trip signal IAW DEOP 0500-02, BYPASSING INTERLOCKS AND ISOLATIONS.
STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Provide the Examinee with the provided copy of DEOP 0500-02.
- 1.
Proceed to step G.3 of procedure.
Step G.1 identifies the bypass for Drywell Cooler Trip is located in Step G.3 Note The DEOP Equipment Storage Cabinet key must be obtained from the Unit Supervisor.
Examinee should locate the proper Equipment Box in the cabinet (U3 Drawer). Tools required are electrical tape, standard straight screwdriver, split blade screwdriver, and insulated gloves.
Do NOT allow examinee to remove Equipment Box from DEOP Equipment Storage Cabinet.
Lock cabinet and return DEOP key to Unit Supervisor PRIOR to leaving the Control Room.
- 2.
Obtain appropriate Equipment Box from the Control Room DEOP Equipment Storage Cabinet.
Prerequisite 3, OBTAINS appropriate EQUIPMENT BOX from the Control Room DEOP Equipment Storage Cabinet.
Cue The DEOP Equipment Box you have identified is in your hand.
Note DS key is required for entry into the AEER.
Do not allow the examinee to break the plane of the panel.
This is a simulated JPM. The Examinee must explain the task.
- 3.
Proceed to the AEER and panel 903-
- 32.
Locates Panel 903-32.
TQ-AA-150-J020 Revision 01 Page 7 of 10 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-j Rev 14 STEP ELEMENT STANDARD SAT UNSAT Comment Number
- 4.
Lift AND tape lead on 903-32 panel terminal block AA terminal point 6 OR terminal point 7.
Step G.3.b, On 903-32 panel terminal block AA terminal point 6 OR terminal point 7 Puts on insulated gloves and ensures long sleeves.
Loosens screw with standard screwdriver.
Uses split blade screwdriver to grasp screw and remove it.
Tapes the loose wire with electricians tape.
Cue 903-32 panel terminal block AA terminal point 6 OR terminal point 7 screw is removed, and the loose wire is taped.
- 5.
Lift AND tape lead on 903-33 panel terminal block AA terminal point 6 OR terminal point 7.
Step G.3.b, On 903-33 panel terminal block AA terminal point 6 OR terminal point 7 Puts on insulated gloves and ensures long sleeves.
Loosens screw with standard screwdriver.
Uses split blade screwdriver to grasp screw and remove it.
Tapes the loose wire with electricians tape.
Cue 903-33 panel terminal block AA terminal point 6 OR terminal point 7 screw is removed, and the loose wire is taped.
- 6.
Verify restart or start the Drywell Coolers.
Contacts the Main Control Room via phone to start the Drywell Coolers.
Cue The Drywell Coolers have been started.
- 7.
Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
Cue Acknowledge the completion of the task.
END
TQ-AA-150-J020 Revision 01 Page 8 of 10 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-j Rev 14 JPM Stop Time:
TQ-AA-150-J020 Revision 01 Page 9 of 10 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-j Rev 14 JPM
SUMMARY
Operators Name:
Emp. ID#:
Job
Title:
Title:
Bypass the trip of Drywell coolers JPM Number: S-N-j Revision Number: 14 Task Number and
Title:
295L074, Bypass the trip of Drywell Coolers Task Standard: The Examinee will bypass the Drywell Cooler trip signal IAW DEOP 0500-02, BYPASSING INTERLOCKS AND ISOLATIONS.
K/A Number and Importance: 295028.A1.03 3.7 Suggested Testing Environment:
In-Plant Alternate Path:
Yes No SRO Only:
Yes No Time Critical:
Yes No Reference(s):
Procedure: DEOP 0500-02 Revision:
22 Procedure:
Revision:
Procedure:
Revision:
Procedure:
Revision:
Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
15 minutes Actual Time Used:
minutes EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory NOTE: Enter finalized grading, comments, and notes relevant to this evaluation in the associated TQ-AA-150-F03A/B. (See AR 4282419).
Evaluators Name (Print):
Evaluators Signature:
Date:
TQ-AA-150-J020 Revision 01 Page 10 of 10 SRRS: 3D.100; There are no retention requirements for this section S-N-j Rev 14 INITIAL CONDITIONS
- 1. A fire has occurred resulting in a loss of the feeder breakers to Busses 33-1 AND 34-1 from Busses 33 AND 34.
- 2. The Unit 3 and 2/3 Diesel Generators have started AND are powering Busses 33-1 and 34-1.
- 3. The loss of Busses 33-1 AND 34-1 caused a spurious trip of the Unit 3 Drywell Coolers.
- 5. Drywell temperature and pressure are rising.
INITIATING CUE
- 1. Unit Supervisor has directed you to perform the in-plant actions to bypass the Drywell Cooler trip signals to allow the restart of the Unit 3 Drywell Coolers for Drywell temperature control in accordance with DEOP 500-02.
- 2. Your Pre Job Brief has been completed.
- 3. Notify the Unit Supervisor when the in-plant actions are complete.
TQ-AA-150-J020 Revision 01 Page 1 of 8 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Job Performance Measure CROSSTIE UNIT 2 AND UNIT 3 INSTRUMENT AIR SYSTEMS JPM Number:
S-N-k Revision Number:
17 Date:
11/22 Developed By:
Derek Siuda
/
Exam Author: Print / Sign Date Approved By:
Jonathan Chapman
/
Facility Representative: Print / Sign Date
TQ-AA-150-J020 Revision 01 Page 2 of 8 SRRS: 3D.100; There are no retention requirements for this section S-N-k Rev 17 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:
All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
- 1. Task description and number, JPM description and number are identified.
- 2. Knowledge and Abilities (K/A) references are included.
- 3. Performance location specified. (in-plant, control room, simulator, or other)
- 4. Initial setup conditions are identified.
- 5. Initiating cue (and terminating cue if required) are properly identified.
- 6. Task standards identified and verified by instructor or SME review.
- 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
- 8. IAW NUREG 1021 Appendix C, clearly identify the task standard (i.e., the predetermined qualitative or quantitative outcome) against which task performance will be measured.
- 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure: DOP 4700-03 Revision:
23 Procedure:
Revision:
Procedure:
Revision:
- 10. Verify cues both verbal and visual are free of conflict.
- 11. Verify performance time is accurate.
- 13. When JPM is initially validated, sign and date JPM cover page. For subsequent validations, sign and date below:
/
SME / Instructor (Print/Sign)
Date
/
SME / Instructor (Print/Sign)
Date
/
SME / Instructor (Print/Sign)
Date
TQ-AA-150-J020 Revision 01 Page 3 of 8 SRRS: 3D.100; There are no retention requirements for this section S-N-k Rev 17 Revision Record (Summary)
Revision #
Summary 15 Updated for 2019 LORT Exam 16 Updated for 2022 LORT Exam and new JPM format 17 Updated for the ILT 22-1 (2023-301) NRC Exam
TQ-AA-150-J020 Revision 01 Page 4 of 8 SRRS: 3D.100; There are no retention requirements for this section S-N-k Rev 17 SIMULATOR SETUP INSTRUCTIONS N/A: In-Plant JPM DOCUMENT PREPARATION Need a clean copy of current revision of DOP 4700-03, UNIT 2/3 INSTRUMENT AIR CROSS-CONNECT OPERATION.
TQ-AA-150-J020 Revision 01 Page 5 of 8 SRRS: 3D.100; There are no retention requirements for this section S-N-k Rev 17 INITIAL CONDITIONS
- 1. Unit 3 is shutdown for a refuel outage.
- 2. Unit 2 is at 100% power and is experiencing an Instrument Air transient that is causing the Unit 2 Instrument Air header pressure to drop slowly.
- 3. The Unit 2 Service Air to Instrument Air cross-tie valve is already open and the Instrument Air header pressure is still dropping slowly.
- 4. The Shift Manager has given permission to carry out "cross-connect" operations.
INITIATING CUE
- 1. The Unit 2 Unit Supervisor has directed you to cross-connect the Unit 2 to Unit 3 Instrument Air headers by opening BOTH the North and South Instrument Air header cross-tie valves in accordance with DOP 4700-03, Step G.8. Appropriate portions of DOP 4700-03 have been completed up to Step G.8.
- 2. All applicable prerequisites of DOP 4700-03 have been met.
- 3. Your Pre Job Brief has been completed.
- 1. Notify the Unit Supervisor when you are complete with the task.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
TQ-AA-150-J020 Revision 01 Page 6 of 8 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-k Rev 17 JPM Start Time:
JPM Sequence #:
of 10 / 11 Task Standard:
The Examinee will crosstie Unit 2 and Unit 3 Instrument Air Headers IAW DOP 4700-03, UNIT 2/3 INSTRUMENT AIR CROSS-CONNECT OPERATION.
STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Provide the candidate with a clean copy of DOP 4700-03, UNIT 2/3 INSTRUMENT AIR CROSS-CONNECT OPERATION.
- 1.
Proceed to step G.8 in DOP 4700-03 Proceeds to Step G.8
- 2.
Open the Unit 2 Instrument Air to Unit 3 Instrument Air South cross-tie valve 2-4705-330, U2 INST AIR SYS XTIE VLV TO/FROM THE U3 INST AIR SYS.
Rotates Instrument Air South cross-tie valve 2-4705-330 CCW until stem is out.
(Valve is located in the overhead, north of 2B IAC)
Cue The Instrument Air South cross-tie valve 2-4705-330 stem is full out.
- 3.
Open the Unit 3 Instrument Air to Unit 2 Instrument Air North cross-tie valve 3-4712-501, U2 INST AIR SYS XTIE VLV TO/FROM THE U3 INST AIR SYS.
Rotates Instrument Air North cross-tie valve 3-4712-501 CCW until stem is out.
(Valve is located in the overhead west of stairs to TBCCW Pumps)
Cue The Instrument Air North cross-tie valve 3-4712-501 stem is full out.
- 4.
Notify Unit Supervisor upon completion of task.
Notifies Unit Supervisor upon completion of task.
Cue Acknowledge the completion of the task.
END JPM Stop Time:
TQ-AA-150-J020 Revision 01 Page 7 of 8 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-k Rev 17 JPM
SUMMARY
Operators Name:
Emp. ID#:
Job
Title:
Title:
Crosstie Unit 2 and Unit 3 Instrument Air Systems JPM Number: S-N-k Revision Number: 17 Task Number and
Title:
278N011, Crosstie unit two and unit three instrument air headers Task Standard: The Examinee will crosstie Unit 2 and Unit 3 Instrument Air Headers IAW DOP 4700-03, UNIT 2/3 INSTRUMENT AIR CROSS-CONNECT OPERATION.
K/A Number and Importance: 295019.A1.02 3.4 Suggested Testing Environment:
In-Plant Alternate Path:
Yes No SRO Only:
Yes No Time Critical:
Yes No Reference(s):
Procedure: DOP 4700-03 Revision:
23 Procedure:
Revision:
Procedure:
Revision:
Procedure:
Revision:
Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
8 minutes Actual Time Used:
minutes EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory NOTE: Enter finalized grading, comments, and notes relevant to this evaluation in the associated TQ-AA-150-F03A/B. (See AR 4282419).
Evaluators Name (Print):
Evaluators Signature:
Date:
TQ-AA-150-J020 Revision 01 Page 8 of 8 SRRS: 3D.100; There are no retention requirements for this section S-N-k Rev 17 INITIAL CONDITIONS
- 1. Unit 3 is shutdown for a refuel outage.
- 2. Unit 2 is at 100% power and is experiencing an Instrument Air transient that is causing the Unit 2 Instrument Air header pressure to drop slowly.
- 3. The Unit 2 Service Air to Instrument Air cross-tie valve is already open and the Instrument Air header pressure is still dropping slowly.
- 4. The Shift Manager has given permission to carry out "cross-connect" operations.
INITIATING CUE
- 1. The Unit 2 Unit Supervisor has directed you to cross-connect the Unit 2 to Unit 3 Instrument Air headers by opening BOTH the North and South Instrument Air header cross-tie valves in accordance with DOP 4700-03, Step G.8. Appropriate portions of DOP 4700-03 have been completed up to Step G.8.
- 2. All applicable prerequisites of DOP 4700-03 have been met.
- 3. Your Pre Job Brief has been completed.
- 4. Notify the Unit Supervisor when you are complete with the task.