COL Docs - Acceptance of Vogtle Unit 4, LAR 23-005 on Timing of Technical Specification Effectiveness Prior to Initial Criticality
ML23121A256
Person / Time
Site: Vogtle  
Issue date: 05/01/2023
From:
NRC
To:
NRC/NRR/DNRL
References
Download: ML23121A256 (3)


Text

From:

Billy Gleaves Sent:

Monday, May 1, 2023 3:13 PM To:

Dorsey, Keith A.

Cc:

Vogtle PEmails; Cayetano Santos; Lauren Nist (She); Chamberlain, Amy Christine; Robert Elliott; Pravin Sawant; Ryan Nolan; Hanry Wagage; Brian Wittick; Vic Cusumano; Rebecca Patton; Ravi Grover

Subject:

Acceptance of Vogtle Unit 4, LAR 23-005 on "Timing of Technical Specification Effectiveness Prior to Initial Criticality"

Keith, By letter dated April 17, 2023, SNC submitted a license amendment request for Vogtle Unit 4.

The proposed amendment would revise the COL Condition to provide temporary exceptions prior to initial criticality of the reactor core for certain Unit 4 Technical Specifications while operating in Modes 4, 5, and 6. The purpose of this letter is to provide the results of the U.S.

Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request.

The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an application for an amendment to a license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

Based on the information provided in your submittal and discussions during the pre-licensing technical exchange meeting on March 2, 2023 and the presubmittal meeting on April 13, 2023, the NRC staff have estimated that this licensing request will take approximately 350 staff-hours to complete. The NRC staff expect to complete this review by your requested, date of July 16, 2023. If there are emergent complexities or challenges in our review that would cause changes to the initial forecast completion date or significant changes in the forecast hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, audits, unanticipated additions of scope to the review, and review by NRC advisory committees or hearing-related activities.

Respectfully, Billy William (Billy) Gleaves Senior Project Manager NRR/Vogtle Project Office

US Nuclear Regulatory Commission The contents of this message may be sensitive. If this message has been received in error, please delete it without reading it. Your receipt of this message is not intended to waive any applicable privilege. Do not disseminate this message without the permission of the author. Communications by this author do not represent NRC policy or staff positions and are not binding on the Commission.

Hearing Identifier:

Vogtle_COL_Docs_Public Email Number:

663 Mail Envelope Properties (DM6PR09MB48397CF97EF9D123A0470AFA9F6E9)

Subject:

Acceptance of Vogtle Unit 4, LAR 23-005 on Timing of Technical Specification Effectiveness Prior to Initial Criticality Sent Date:

5/1/2023 3:12:47 PM Received Date:

5/1/2023 3:12:50 PM From:

Billy Gleaves Created By:

Bill.Gleaves@nrc.gov Recipients:

"Vogtle PEmails" <Vogtle.PEmails@usnrc.onmicrosoft.com>

Tracking Status: None "Cayetano Santos" <Cayetano.Santos@nrc.gov>

Tracking Status: None "Lauren Nist (She)" <lauren.nist@nrc.gov>

Tracking Status: None "Chamberlain, Amy Christine" <acchambe@southernco.com>

Tracking Status: None "Robert Elliott" <Robert.Elliott@nrc.gov>

Tracking Status: None "Pravin Sawant" <Pravin.Sawant@nrc.gov>

Tracking Status: None "Ryan Nolan" <Ryan.Nolan@nrc.gov>

Tracking Status: None "Hanry Wagage" <Hanry.Wagage@nrc.gov>

Tracking Status: None "Brian Wittick" <Brian.Wittick@nrc.gov>

Tracking Status: None "Vic Cusumano" <Victor.Cusumano@nrc.gov>

Tracking Status: None "Rebecca Patton" <Rebecca.Karas@nrc.gov>

Tracking Status: None "Ravi Grover" <Ravinder.Grover@nrc.gov>

Tracking Status: None "Dorsey, Keith A." <kadorsey@southernco.com>

Tracking Status: None Post Office:

DM6PR09MB4839.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3023 5/1/2023 3:12:50 PM Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date: