MONTHYEARML21102A1272021-04-0909 April 2021 (Vcsns), Unit 1 - Application for Technical Specification Change Regarding Risk Informed Justification for the Relocation of Specific Surveillance Frquency Requirements to Licensee-Controlled Program Project stage: Request ML21125A1942021-05-0505 May 2021 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit 1 - Acceptance Review (L-2021-LLA-0064) Project stage: Acceptance Review ML21333A1892021-11-29029 November 2021 NRR E-mail Capture - Draft RAI for Summer LAR Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b, (TSTF-425) Project stage: Draft RAI ML22020A2262022-01-20020 January 2022 Response to Request for Additional Information to License Amendment Request LAR-20-203 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Project stage: Response to RAI ML22160A3652022-08-16016 August 2022 Issuance of Amendment No. 222 to Relocate Selected Surveillance Frequencies to a Risk-Informed Licensee Controlled Program Project stage: Approval ML22242A1642022-08-31031 August 2022 Vcsummer, Unit 1 FOL - Amd 222 Corrected Pages Project stage: Other ML22242A1622022-08-31031 August 2022 VC Summer Correction Letter to Amendment for TSTF-425 Project stage: Request ML22242A1632022-08-31031 August 2022 Correction to Issuance of Amendment to Relocate Selected Surveillance Frequencies to a Risk-Informed Licensee Controlled Program Project stage: Approval ML23115A4002023-04-25025 April 2023 Notice of Error on Technical Specification Page 3/4 8-3 Project stage: Request ML23137A1782023-05-22022 May 2023 Correction to Issuance of Amendment to Relocate Selected Surveillance Frequencies to a Risk-Informed Licensee Controlled Program Project stage: Approval 2022-01-20
[Table View] |
|
---|
Category:Letter
MONTHYEARML24038A0322024-02-0707 February 2024 (Vcsns), Unit 1, 10 CFR 21 Report - Emergency Diesel Generator Flash Contactor Relay IR 05000395/20230042024-01-31031 January 2024 Integrated Inspection Report 05000395/2023004 ML24022A1582024-01-22022 January 2024 (Vcsns), Unit 1 - Reply to a Notice of Violation: EA-23-093 ML24022A1202024-01-22022 January 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000395/2024403) ML24018A0112024-01-18018 January 2024 CFR 21 Report Emergency Diesel Generator Fuel Oil Piping IR 05000395/20240112024-01-17017 January 2024 Notification of VC Summer Station Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000395/2024011 ML23361A1042023-12-21021 December 2023 Inservice Testing Program for Pumps and Valves Fifth Interval Update and Associated Relief and Alternative Requests IR 05000395/20230912023-12-21021 December 2023 Final Significance Determination of a White Finding and Notice of Violation and Assessment Followup Letternrc Inspection Report 05000395/2023091 ML23354A1802023-12-20020 December 2023 301 Examination Report with Cover Letter ML23347A0492023-12-12012 December 2023 Technical Specification Bases Changes Updated Through November 2023 ML23334A2462023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23334A2372023-11-30030 November 2023 (Vvsns), Unit 1 - Annual Commitment Change Summary Report ML23332A1942023-11-28028 November 2023 (Vcsns), Unit 1, Correction of Typographical Error in License Amendment Request - Inverter Allowed Outage Time (AOT) Extension ML23317A2242023-11-0909 November 2023 (Vcsns), Unit 1 - License Amendment Request - Inverter Allowed Outage Time (AOT) Extension ML23289A1172023-11-0303 November 2023 Tribal Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA ML23289A1152023-11-0303 November 2023 Ltr to R. Nelson - Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA ML23289A1162023-11-0303 November 2023 Ltr to W. Emerson - Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA IR 05000395/20234032023-11-0101 November 2023 Material Control and Accounting Program Inspection Report 05000395/2023403 Cover IR 05000395/20230032023-11-0101 November 2023 Integrated Inspection Report 05000395/2023003 ML23284A1792023-10-16016 October 2023 Subsequent License Renewal Application Online Reference Portal ML23275A0142023-10-11011 October 2023 SLRA - Acceptance and Opportunity for Hearing - Letter ML23284A1662023-10-10010 October 2023 (Vcsns), Unit 1 - Request for Regulatory Conference; (EA-23-093) IR 05000395/20230902023-10-0404 October 2023 NRC Inspection Report 05000395/2023090 and Preliminary Yellow Finding and Apparent Violation IR 05000395/20230112023-09-27027 September 2023 Focused Engineering Inspection Report 05000395/2023011 ML23250A3112023-09-20020 September 2023 Request to Revise Reactor Vessel Material Surveillance Capsule Withdrawal Schedules ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations ML23235A0432023-09-0505 September 2023 Receipt and Availability of the Subsequent License Renewal Application IR 05000395/20234012023-08-30030 August 2023 Security Baseline Inspection Report 05000395/2023401 ML23242A1192023-08-29029 August 2023 (Vcsns), Unit 1 - Inservice Inspection (ISI) Owner'S Activity Report (OAR) for Refueling Outage 27 ML23243B0362023-08-25025 August 2023 Request for FEMA Consultation on the Dominion Energy Proposal to Consolidate the Emergency Operations Facility for the Virgil C. Summer Nuclear Station Unit 1 IR 05000395/20230052023-08-23023 August 2023 Updated Inspection Plan for Virgil C. Summer Nuclear Station (Report 05000395 2023005) ML23233A1752023-08-17017 August 2023 Application for Subsequent Renewed Operating License IR 05000395/20230022023-08-14014 August 2023 Integrated Inspection Report - Integrated Inspection Report 05000395/2023002 and Apparent Violation IR 05000395/20230102023-08-12012 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000395/2023010 ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000395/20234412023-07-17017 July 2023 95001 Supplemental Inspection Report 05000395/2023441 and Follow Up Assessment Letter ML23190A0012023-07-0909 July 2023 Special Report 2023-003 Inoperable Radiation Monitoring Instrumentation Channel ML23187A5092023-07-0606 July 2023 Request for Federal Emergency Management Agency Consultation on the Dominion Energy Proposal to Consolidate the Emergency Operations Facility for the Virgil C. Summer Nuclear Station Unit 1 ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23173A1052023-06-22022 June 2023 Special Report 2023-002 Inoperable Loose-Part Monitoring System Channel ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23159A2332023-06-0808 June 2023 License Amendment Request - Emergency Response Organization Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes ML23156A3092023-06-0505 June 2023 Requalification Program Inspection Virgil C. Summer Nuclear Station Unit 1 - 05000395/2023003 2024-02-07
[Table view] |
Text
Dominion Energy South Carol in a, Inc.
5000 Dominion Bou levard, Glen All en, VA 23060 DominionEnergy .com April 25, 2023 Attn: Document Control Desk Serial No.: 23-107 U. S. Nuclear Regulatory Commission NRA/YG: RO Washington, DC 20555-0001 Docket No.: 50-395 License No.: NPF-12 DOMINION ENERGY SOUTH CAROLINA (DESC}
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS} UNIT 1 NOTICE OF ERROR ON TECHNICAL SPECIFICATION {TS} PAGE 3/4 8-3 BACKGROUND During the preparation of the camera-ready pages for the previously submitted VCSNS LAR 20-203 (ML21102A127), Application for Technical Specification Change Regarding Risk-Informed Requirements to a Licensee-Controlled Program, an administrative error was introduced into VCSNS TS page 3/4 8-3. A condition report was generated. More specifically, erroneous information was included in surveillance requirement (SR) 4.8.1.1.2 a.3 of the VCSNS TS. The page with the incorrect information was subsequently transmitted to NRC as part of the camera-ready pages.
VCSNS TS SR 4.8.1.1.2 a.3 was not part of the proposed changes in LAR 20-203 submittal. The TS mark-up page provided in LAR 20-203 showed the correct content of SR 4.8.1.1.2 a.3, as shown in Attachment 3 of LAR 20-203.
REQUEST This letter provides a replacement SR 4.8.1.1.2 a.3. The corrected content as shown in of LAR 20-203, is as follows:
"Verifying the diesel generator can start* and accelerate to synchronous speed (504 rpm) with generator voltage and frequency at 7200 +/- 720 volts and 60 +/- 1.2 Hz."
Should you have any questions related to this letter, please contact Yan Gao at (804) 273-2768.
Res~ ~
James E. Holloway Vice President - Nuclear Engineering and Fleet Support Commitments made in this letter: None.
Serial No.23-107 Docket No. 50-395 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, Georgia 30303-1257 Mr. G. Edward Miller NRC Senior Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 09 E-3 11555 Rockville Pike Rockville, Maryland 20852-2738 NRC Senior Resident Inspector V.C. Summer Nuclear Station Ms. Robin S. Mack Bureau of Environmental Health Services South Carolina Department of Health and Environmental Control 8500 Farrow Road - Building 17 Columbia, SC 29203 Mr. G. J. Lindamood Santee Cooper- Nuclear Coordinator 1 Riverwood Drive Moncks Corner, SC 29461