Enclosure 1: SMR, LLC Meeting Presentation Materials for April 19, 2023
ML23107A003
Person / Time
Site: 99902049
Issue date: 04/19/2023
From:
Holtec, SMR
To:
Office of Nuclear Reactor Regulation
Shared Package
ML23107A001 List:
References
160-USNRC-042
Download: ML23107A003 (1)


Text

SMR-160 Operational Programs HOLTEC INTERNATIONAL Date: 4/19/2023 Presented By: Andrew Brenner SMR, LLC, A Holtec International Company Krishna P. Singh Technology Campus One Holtec Boulevard Camden, NJ 08104, USA

[Not Export Controlled]

Agenda

Introductions

Purpose & Outcome Method List of Operational Programs Open Forum holtec.com I smrllc.com I Page 2 HOL T EC INI L l{NA II ON/\l

Purpose & Outcome e

~~N

~tt~

PURPOSE To provide SM R's understanding of the operational programs required for SMR-160 OUTCOME To obtain feedback and gain alignment with the NRC staff on the technical content threshold and implementation milestones of various operational programs for a future CPA.

holtec.com I smrllc.com I Page 3

Method Reviewed relevant SRP content, 13.4 Operational Programs Reviewed recently approved designs (NuScale, Vogtle)

H O L T EC INI L l<N A II ON ;\L Not directly applicable given differences between DCA/COLA and CPA.

General Question - Are SM R's anticipated PSAR content threshold and implementation milestones for each program aligned with NRC expectations?

holtec.com I smrllc.com I Page 4

Inservice Inspection Program Requirements/Guidance PSAR Section(s) 10 CFR 50.55a(g) 5.2.4 - Class 1 SSCs ASME BPVC Section XI IWX 5.4.2 - Class 1 SG tubes 2400, 2017 edition 6.6 - Class 2/3 SSCs holtec.com I smrllc.com I Page 5 PSAR Technical Threshold Implementation Milestone High level overview of the Prior to Commercial program including Service discussion on expected inspections per the ASME BPVC for the different SMR Class components e ~~N~:,~

Remarks Not planning to discuss inspection techniques or procedures until FSAR

Preservice Inspection Program Requirements/Guidance PSAR Section(s) 10 CFR 50.55a(g) 5.2.4 - Class 1 SSCs ASME BPVC Section XI IWX 5.4.2 - Class 1 SG tubes 2200, 2017 edition 6.6 - Class 2/3 SSCs holtec.com I smrllc.com I Page 6 PSAR Technical Threshold Similar to lnservice Inspection Program, high level overview of the program including discussion on expected inspections per the ASME BPVC for the different SMR Class components Implementation Milestone Completion prior to initial plant startup HOLTEC I N I L K N A I I () N,\ L Remarks If necessary, considering potential commitment in CPA to deliver full scope with sufficient time for NRC review and completion of program prior to initial plant startup

Inservice Testing Program Requirements/Guidance 10 CFR 50.55a(f)

ASME OM Code, 2017 edition PSAR Section(s) 3.9.6 - Pumps, valves, dynamic restraints 5.2.4 - Class 1 SSCs 5.4.2 - Class 1 SG tubes 6.6 - Class 2/3 SSCs holtec.com I smrllc.com I Page 7 PSAR Technical Threshold High level overview of the program including discussion on expected testing per the ASME OM Code for the different SMR Class components Implementation Milestone Prior to Commercial Service (after main generator online on nuclear heat)

HOL TEC IN I L f(NA I l ()N,\L Remarks Not planning to discuss testing techniques or procedures until FSAR

Preservice Testing Program Requirements/Guidance 10 CFR 50.55a(f)

ASME OM Code, 2017 edition PSAR Section(s) 3.9.6 - Pumps, valves, dynamic restraints 5.2.4 - Class 1 SSCs 5.4.2 - Class 1 SG tubes 6.6 - Class 2/3 SSCs holtec.com I smrllc.com I Page 8 PSAR Technical Threshold Implementation Milestone Similar to lnservice Testing Completion prior to initial Program, high level fuel load overview of the program including discussion on expected testing per the ASME OM Code for the different SMR Class components

- *"*K*

HO L TEC IN I L I{ NA I J () N,\ L Remarks If necessary, considering potential commitment in CPA to deliver full scope with sufficient time for NRC review and completion of program prior to initial plant startup

Motor Operated Valve Testing Requirements/Guidance 10 CFR 50.SSa(b )(3 )(ii)

GL-89-10 PSAR Section(s) 3.9.6 holtec.com I smrllc.com I Page 9 PSAR Technical Threshold Implementation Milestone Similar to lnservice Testing Prior to initial fuel load Program, high level overview of the program including discussion on expected testing per the ASME OM for the different SMR Class components H OL TEC I N I L KNA I I O NA L Remarks Not planning to discuss testing techniques or procedures until FSAR

Initial Test Program Requirements/Guidance 10 CFR 50.34(b)(6)(iii) 10 CFR 50.34(f)(2)(xxvi)

RG 1.68, Rev. 4 PSAR Section(s) 14.2 holtec.com I smrllc.com I Page 10 PSAR Technical Threshold High level overview of the Initial Test Program to be performed following construction Implementation Milestone Prior to the first construction test being conducted for the Construction Test Program Prior to the first preoperational test for the Preoperational Test Program Prior to initial fuel load for the Startup Test Program HOL T EC IN I L KNA I I ONi\L Remarks If necessary, considering potential commitment in CPA to deliver full scope with sufficient time for NRC review of program prior to initial plant startup

Environmental Qualification Program Requirements/Guidance PSAR Section(s) 10 CFR 50.49(a) 3.11 holtec.com I smrllc.com I Page 11 PSAR Technical Threshold Implementation Milestone High level overview of the Prior to initial fuel load EQ program including general scope l~IIC*

H O L TEC IN I L l<NA I I ON 1\L Remarks

Reactor Vessel Material Surveillance Program Requirements/Guidance 10 CFR 50.60 10 CFR Part 50, App. H ASTM E-185 - 2021 PSAR Section(s) 5.3.1.6 holtec.com I smrllc.com I Page 12 PSAR Technical Threshold High level overview of program Implementation Milestone Prior to initial criticality HO LTEC INI L f:N A II O N 1\L Remarks Per previous discussions regarding concerns predicting RPV neutron embrittlement, SMR intends include discussion on how to use Reactor Vessel Material Surveillance Program data in the PSAR. Full details of the program may not be developed.

Containment Leakage Rate Testing Program Requirements/Guidance PSAR Section(s)

PSAR Technical Threshold Implementation Milestone 10 CFR 50.54(0) 6.2.6 Containment will be Prior to initial fuel load described including 10 CFR SO, App. A, GDC 32 anticipated leakage rates to be verified in testing 10 CFR SO, App. J program holtec.com I smrllc.com I Page 13 e ~~N~~!

Remarks App J has two options to follow, specific details will be included in the FSAR

Fire Protection Program Requirements/Guidance 10 CFR 50.48 RG 1.189, Rev. 4 Also:

10 CFR 30.32 10 CFR 40.31 10 CFR 70.22 PSAR Section(s) 9.5.1 holtec.com I smrllc.com I Page 14 PSAR Technical Threshold FP Program definition, design basis, general system(s) overview, codes and standards; programmatic controls/

administration; quality assurance;generalFP design features for key plant areas; safe-shutdown capability; RG 1.189 conformance Implementation Milestone Prior to receipt of fuel onsite (to support receipt and storage of fuel on site);

Prior to initial fuel load (to support fuel load and plant operation)

- ~IIC*

HOLTEC I N *1 L f: N A I I () N,\ L Remarks Portions applicable to radioactive material will be in place to support materials licensing (10 CFR Parts 30, 40, 70)

Process and Effluent Monitoring and Sampling Program Requirements/Guidance PSAR Section(s)

I PSAR Technical Threshold I implementation Milestone 10 CFR 20.1301 and 11.4 - Process Control Description of the Prior to initial fuel load 20.1302 Program preliminary design of equipment to be installed 10 CFR 50.34a to maintain control over radioactive materials in 10 CFR 50.36a gaseous and liquid effluents produced during 10 CFR 50, App. I, normal reactor operations, Sect. II and IV 11.5 - Radiological Effluent including expected Prior to initial fuel load Technical Specifications/

operational occurrences.

Standard Radiological Also identify the design Effluent Controls objectives, and the means 11.5 - Offsite Dose to be employed, for Prior to initial fuel load Calculation Manual keeping levels of radioactive material in 11.5 - Radiological effluents to unrestricted Prior to initial fuel load Environmental Monitoring areas ALARA.

Program holtec.com I smrllc.com I Page 15 e ~~N~\,~

Remarks Guides on design objectives set forth in 10 CFR 50, App. I, Sect. II may be used by an applicant for a construction permit.

Guides on limiting conditions for operation for light-water-cooled nuclear power reactors set forth in 10 CFR 50, App. I, Sect. IV may be used by an applicant for Part 50 License.

Radiation Protection Program (including ALARA principle)

Requirements/Guidance 10 CFR 20.1101 10 CFR 20.1406 10 CFR Part 37 11.4 12.1 12.5 PSAR Section(s) holtec.com I smrllc.com I Page 16 PSAR Technical Threshold Information presented in the PSAR provides reasonable assurance that the applicant will comply with the requirements in 10 CFR Part 20 (Radwaste and Effluent Control)

Implementation Milestone

1. Radioactive source control (assignment of RP supervisor);

Minimization of contamination prior to receipt of by-product, source, or SNM

2. Personnel dosimetry; Radiation monitoring and surveys; Radiation work permits prior to receipt of fuel on site
3. Assignment of RP manager; Respiratory protection; Bioassy prior to initial fuel load
4. Effluents and environmental monitoring and assessment; Job coverage; Radioactive waste shipping prior to first shipment of radioactive waste)

HOLTEC I N I LKNA I I O N 1\L Remarks

Non-Licensed Plant Staff Training Program Requirements/Guidance 10 CFR 50.120 10 CFR 50.34(a)(6)

Also:

10 CFR 30.32 10 CFR 40.31 10 CFR 70.22 PSAR Section(s) 13.2.2 holtec.com I smrllc.com I Page 17 PSAR Technical Threshold A preliminary plan for the applicant's training of personnel Implementation Milestone 18 months prior to scheduled date of initial fuel load Prior to initial receipt of byproduct, source, or special nuclear materials (excluding Exempt Quantities as described in 10 CFR 30.18)

HOLTEC I N I L I{ N A I I () N,\ L Remarks Portions applicable to radioactive material will be in place to support materials licensing (10 CFR Parts 30, 40, 70)

Reactor Operator Training Program Requirements/Guidance 10 CFR 55.13 10 CFR 55.31 10 CFR 55.41 10 CFR 55.43 10 CFR 55.45 10 CFR 50.34(a)(6)

PSAR Section(s) 13.2.1 holtec.com I smrllc.com I Page 18 PSAR Technical Threshold Preliminary plan for the applicant's training of personnel Implementation Milestone 18 months prior to scheduled date of initial fuel load HO L TEC

' '" I L f(NA I I ONI\L Remarks

Reactor Operator Requalification Program Requirements/Guidance 10 CFR 50.34(b) 10 CFR 50.54(i) 10 CFR 55.59 10 CFR 50.34(a)(6)

PSAR Section(s) 13.2.1 holtec.com I smrllc.com I Page 19 PSAR Technical Threshold Implementation Milestone Preliminary plan for the Within 3 months after the applicant's requalification issuance of an operating of personnel license H O LTEC INI L KNA IJ ON 1\L Remarks

Emergency Planning Requirements/Guidance 10 CFR 50.47 10 CFR Part SO, App.E 10 CFR S0.34(a)(10)

PSAR Section(s) 13.3 holtec.com I smrllc.com I Page 20 PSAR Technical Threshold Discussion of the applicant's preliminary plans for coping with emergencies as set forth in 10 CFR SO App.E Implementation Milestone Full participation exercise conducted within 2 years of scheduled date for initial loading of fuel Onsite exercise conducted within 1 year before the schedule date for initial loading of fuel Applicant's detailed implementing procedures for its emergency plan submitted at least 180 days prior to scheduled date for initial loading of fuel H O L TEC I 1'-J I l I{ N A I I () N,\ l Remarks

Security Programs Requirements/Guidance 10 CFR 50.34(c) 10 CFR 73.1 10 CFR 73.67 10 CFR 73.55(b) 10 CFR 73.55(c)(3) 10 CFR 73.56 10 CFR 73.57 10 CFR 73.55(c)(5) 10 CFR 73.55(k) 10 CFR Part 73, App.C 10 CFR 73.55(c)(4) 10 CFR 73.55(d)(3) 10 CFR Part 73, App.B PSAR Section(s) 13.5.2.2.8, 13.6 - Physical Protection Program 13.6-Physical Security Program 13.6 - Safeguards Contingency Program 13.6 -Training and Qualification Program l,rcnara-11:nc*:1:1:*ra-111111*:nzz PSAR Technical Threshold Design of physical security systems - plans, training and quals, safeguards contingency plans, CAS, comms, power sources Access authorization Implementation Milestone Prior to initial receipt of SNM Prior to receipt of fuel onsite Prior to receipt of fuel onsite Prior to receipt of fuel onsite H O LT EC IN I L l-:N A I I ON ;\ L Remarks I

Physical Security Program (Cat 1 and 2 Quantities of Radioactive Material)

Requirements/Guidance 10 CFR 37 Subparts A, B, C, 11.4 D, F PSAR Section(s) 13.5.2.2 13.6 holtec.com I smrllc.com I Page 22 PSAR Technical Threshold High level summary Implementation Milestone Prior to possession of aggregated category 1 or category 2 quantity of radioactive materials HOLTEC I N I L I{ N A I I () N,\ L Remarks

Quality Assurance Program - Operation Requirements/Guidance 10 CFR 50.54(a) 10 CFR Part 50, App. A, GDC 1 10 CFR Part 50, App. B PSAR Section(s) 17.5 holtec.com I smrllc.com I Page 23 PSAR Technical Threshold QAPD Implementation Milestone 30 - 90 days prior to initial fuel load e ~~N~T,N~

Remarks

Maintenance Rule Requirements/Guidance PSAR Section(s) 10 CFR 50.65 17.6 holtec.com I smrllc.com I Page 24 PSAR Technical Threshold High level overview of the program including discussion on expected scope of RAP in MR program Implementation Milestone Within 3 months after the issuance of an operating license

- R1*11e*

H O L TEC I N I L ~ N A I I O N,\ L Remarks

Fitness for Duty Program Requirements/Guidance 10 CFR 26.4(f) 10 CFR Part 26, Subpart K 10 CFR 26.4(e)

PSAR Section(s)

13. 7 - Fitness for Duty Program (FFD) for Construction (Workers and First-Line Supervisors) 13.7 - FFD Program for Construction (Management and Oversight Personnel) 10 CFR 26.4(a)(S) or (e)(l) 13.7 - FFD Program (Security Personnel) 10 CFR Part 26, Subparts A

- H, N, and 0 holtec.com I smrllc.com I Page 25 PSAR Technical Threshold Full description of FFD Program required for portions required prior to initiating 10 CFR Part 26 construction activities.

Implementation Milestone Prior to initiating 10 CFR Part 26 construction activities Prior to initiating 10 CFR Part 26 construction activities Prior to initiating 10 CFR Part 26 construction activities Prior to the earlier of:

A. Licensee's receipt of SNM in the form of fuel assemblies, or B. Establishment of a protected area, or C. Operating License Issuance HOL T EC 1,'s I L l<N A I I O N ;\L Remarks

Fitness for Duty Program (cont)

Requirements/Guidance PSAR Section(s) 10 CFR 26.4(g) 13.7 - FFD Program (FFD Program Personnel) 10 CFR Part 26, Subparts A, B, D

- H, N, 0, and C per licensee's Discretion 10 CFR 26.4(c) 13.7 - FFD Program (TSC EOF Emergency 10 CFR Part 26, Subparts A - I, Responders)

N, and 0, except for§§ 26.205 -

209 10 CFR 26.4(a) and (b) 10 CFR Part 26, Subparts A - I, N,

and 0, except for individuals listed in § 26.4(b), who are not subject to §§ 26.205 -209 13.7 - FFD Program (Operations) holtec.com I smrllc.com I Page 26 PSAR Technical Threshold Full description of FFD Program required for portions required prior to initiating 10 CFR Part 26 construction activities.

Implementation Milestone Prior to initiating 10 CFR Part 26 construction activities Prior to the conduct of the first full-participation emergency preparedness exercise under 10 CFR Part 50, App. E, Section F.2.a Prior to the earlier of:

A. Establishment of a protected area, or B. Operating License Issuance H O L TEC 11'< I L 1'N A I I O N,\L Remarks

Cyber Security Program Requirements/Guidance 10 CFR 73.54(b) 10 CFR 73.55(b)(8) 10 CFR 73.54(c)(6)

PSAR Section(s) 13.7 holtec.com I smrllc.com I Page 27 PSAR Technical Threshold High level summary Implementation Milestone Prior to receipt of fuel onsite HOL TEC 11'1 I l f:NA I I O N 1\l Remarks

SNM Material Control and Accounting Program Requirements/Guidance PSAR Section(s) 10 CFR 74, Subpart B 13.5.2.2