NRC Meeting:

Control Room Staffing (10 CFR 50.54(m))

HOLTEC INTERNATIONAL Date: 22 March 2023 Presented By: Michael Protesto SMR, LLC, A Holtec International Company Krishna P. Singh Technology Campus One Holtec Boulevard Camden, NJ 08104, USA

[Not Export Controlled]

Meeting Agenda

Introductions

Purpose & Outcome References 10 CFR 50.54 Regulation and SMR-160 Approach Discussion of Multi-Unit Simulation Requirements Discussion of Part 50 Exemption Submittal Process Open Forum holtec.com I smrllc.com I Page 2 HOLTEC 11'\\J l [ !{ NAT I ONAL

Purpose and Outcome

- ~11<*

HOLTEC INl [KNAT IO N,\\L PURPOSE To provide a high-level overview of the exemption path for 10 CFR 50.54(m).

OUTCOME To obtain feedback from the NRC staff on the exemption plan for the SMR-160 Control Room staffing.

holtec.com I smrllc.com I Page 3

References 10 CFR 50.54 NUREG-0800 Ch. 18 NUREG-0711 NUREG-1791 NUREG/CR-6838 SECY-11-0098 NEI Position Paper "Control Room Staffing for Small Reactors," 2001 holtec.com I smrllc.com I Page 4 HOLTEC I NT[ i< NAT I ONAL

Current 10 CFR 50.54(m) Regulation (i) Each licensee shall meet the minimum licensed operator staffing requirements in the following table:

Minimum Requirements1 Per Shift for On-Site Staffing of Nuclear Power Units by Operators and Senior Operators Licensed Under 10 CFR Part 55 One Unit

'two units Number of nuclear power units operating2 Position TI,ree units HOLTEC l,'-I T [ K N A fl O N,\\ I One control room One control room

'two control rooms

'1\\vo control rooms TI,ree control rooms Senior Operator 1

1 1

None Operator 1

2 2

3 3

Senior Operator 2

2 2

2 2

One Operator 2

3 3

4 4

Senior Operator 2

3 J3 3

Two Operator 3

4 J5 5

Senior Operator 3

4 Three Operator 5

6 1Temporary deviations from the numbers required by this table shall be in accordance with criteria established in the unit's technical specifications.

2For the purpose of this table, a nuclear power unit is considered to be operating when it is in a mode other than cold shutdown or refueling as defined by the unit's technical specifications.

JThe number of required licensed personnel when the operating nuclear power units are controlled from a common control room are two senior operators and four operators.

holtec.com I smrllc.com I Page 5

SMR-160 Key Attributes Passive safety systems No credited operator actions during DBAs Minimum important human actions {IHAs) expected No PSA-determined IHAs at this time

-,, e ~lRN~Jo~f Advanced digital system for automated controls reducing licensed operator workload Computer-based procedures Up to four units monitored from one Control Room holtec.com I smrllc.com I Page 6

Initial Staffing Levels H O LT EC I NT[ R NA TIO N,\\L Based on preliminary analysis on the SMR-160 control scheme from MELCO, JEXK-0135-1019, "System Requirements Specification for Human-System Interface System," a ((

))

Initial staffing level goals and staffing roles and responsibilities will be evaluated and modified.

iterative process through the SMR-160 design change control process, through the human engineering discrepancy (HED) process, and as information from other HFE elements and S&Q analyses, evaluations, and tests becomes available.

holtec.com I smrllc.com I Page 7

SMR-160 Anticipated Staffing Levels

((

holtec.com I smrllc.com I Page 8

))

HOLTEC I N T[R NA I I O Nt\\ L

Task Analysis Approach HO LT EC I N l [R NA fl O NA L NUREG-0800 Chapter 18 describes the methodology of assessing minimum staffing levels in Appendix B that is rooted in task analysis. It continues to state 5 to 10 scenarios should be sufficient provided they define a set of highest-workload conditions.

SECY-11-0098 states that identifying these tasks is a major challenge and plans to update guidance in NUREG-0711 to better prescribe the scope of tasks the staff would expect in a thorough task analysis.

Holtec indents to follow the general guidance to cover multiple operating conditions paired with the outcomes of FRA/FA, TA, and PRA-assisted workload cases.

holtec.com I smrllc.com I Page 9

Discussion of Multi-Unit Simulation Requirements HOLT EC I N T[R NA rlO N,\\ L The SMR-160 simulator, at the time submitted for declaration as an approved simulator for operator training, licensing and reactivity manipulations, will represent a multi-unit control room. Minimum staffing validation will contain multi-unit scenarios for work-load evaluation.

Question: Is there guidance on the scope of multi-unit simulation required for (1) minimum staff validation and (2) operating initial licensing?

holtec.com I smrllc.com I Page 10

Process for 10 CFR 50.54(m) Exemption Request HOLTEC I N T[K NA r1 0NA L The HFE process continues with submittals of Result Summary Reports (RSRs) for the Operator License Application. The RSRs are not planned to be available by the CPA but would form part of the 10 CFR S0.54(m) exemption justification.

Question: What are the expectations from the NRC regarding content in the CPA supporting an exemption request given 10 CFR 50.54(m) details licensing conditions for the operating license?

holtec.com I smrllc.com I Page 11

Discussion on 10 CFR 50.54 Exemption Request n

°' HOLTEC I NT[RNATION,\\L NUREG-1791 depicts an 11-step approach for determining the acceptability of an exemption request from 10 CFR 50.54(m). Part of this approach incorporates review of HFE milestone, including Operating Experience Review, Functional Requirements Analysis/Function Allocation, and Task Analysis.

Question: Are the Result Summary Reports sufficient justification or shall the exemption request contain portions of each report itself that supports the minimum staffing analysis?

holtec.com I smrllc.com I Page 12