Form 2.3-5 Written Examination Review Worksheet
Q#
- 1.
LOK (F/H)
- 2.
LOD (1-5)
- 3. Psychometric Flaws
- 4. Job Content Flaws
- 5. K/A Use Flaws
- 6. Source (B/M/N)
- 7. Status (U/E/S)
- 8. Explanation Stem Focus Cues T/F Cred.
Dist.
Partial Job Link Minutia
- /Units Logic Q-K/A License Level 1
H 3
B S
2 F
3 X
N U
Answer D is also a correct answer. The plausibility statement also seems to indicate so.
Rewrote question, new question meets K/A and is SAT 3
H 3
N S
4 F
2 X
B U
A2 and C2 can be correct, BOP can always do something (subjective)
- 1. Reworded the second part of the question to read:
The 2. is required to place-keep the master copy of the procedure.
- 2. Removed the verbs (is required to; can) from the answers.
Removed second half of question because of syntax issues. Now reads In accordance with AD-AA-102, Procedure Use and Adherence Added a fourth bullet since it could be argued there are two correct answers without it.
- The US has NOT authorized Reader-Doer 5
F 2
N S
6 H
3 M
E
- 1. Capitalized FW-44 noun name.
- 2. B is not an isolate action as asked by the stem.
Changed B to Place the #1 RESET/NORMAL/OVRD switch in OVRD and release. Also changed the plausibility statement. Operation of the switch will have no effect on feeding the S/G since the AFRV is failed open due to the loss of power.
7 F
3 B
S 8
F 2
N E
Question as written is not very discriminating and is borderline minutia. Changed question to ask where the Gaseous Radwaste discharge valves are operated from vice where they can be monitored.
9 H
2 N
S 10 H
3 M
S 11 H
2 B
S
12 H
3 N
E
- 1. First part of question tips off answer with plural verb. Changed 1 to What system(s) is/are operating to prevent Containment pressure from exceeding 54 psig?
- 2. Add words to define when the 15 minute clock starts. Changed 2 to What is the expected condition of Containment pressure 15 minutes after the steam generator has blown dry?
13 F
2 B
S 14 H
3 B
E Added with no operator actions to stem 15 F
2 N
S 16 H
3 N
E D is implausible. Changed D to SI-657 fails open.
This is plausible if the examinee doesnt remember the fail position of the valve.
Q#
- 1.
LOK (F/H)
- 2.
LOD (1-5)
- 3. Psychometric Flaws
- 4. Job Content Flaws
- 5. K/A Use Flaws
- 6. Source (B/M/N)
- 7. Status (U/E/S)
- 8. Explanation Stem Focus Cues T/F Cred.
Dist.
Partial Job Link Minutia
- /Units Logic Q-K/A License Level 17 H
3 M
S 18 H
3 M
S 19 H
3 B
S 20 F
2 N
S 21 H
3 N
S 22 F
2 B
S 23 H
3 B
S 24 H
3 N
S 25 F
2 M
E Question as written is not a good match for the K/A.
Pressurizer system is covered on other exam questions so this is also an overlap issue. Randomly selected 076 Service Water, 191001 K1.04 Redrew K/A, new question is SAT.
26 F
2 B
S 27 H
3 B
E The term appropriate is subjective. Changed question to What procedure is entered to mitigate this problem?
28 H
3 X
N U
The question as written is an SRO level question.
Rewrote question to RO level.
29 H
3 B
E Changed withdrawal to withdraw in distractors.
30 F
2 M
S 31 H
2 N
S 32 F
2 M
E Distractor D can be argued as correct as well if it is accomplished manually. Added to stem : Where will letdown be automatically directed to when the A CLRW Receiver tank gets full?.
Q#
- 1.
LOK (F/H)
- 2.
LOD (1-5)
- 3. Psychometric Flaws
- 4. Job Content Flaws
- 5. K/A Use Flaws
- 6. Source (B/M/N)
- 7. Status (U/E/S)
- 8. Explanation Stem Focus Cues T/F Cred.
Dist.
Partial Job Link Minutia
- /Units Logic Q-K/A License Level 33 F
2 N
S 34 H
3 N
E Awkward wording in stem (remains to be fulilled).
Changed part 1. to Which parameter is still required to be met to satisfy HPSI throttle/stop criteria?
35 F
3 M
E Distractor D2 stands out. Changed FIP to Feedback Incorporation Process.
Changed answer B based on validator pointing out that B could also be correct. Changed answer to:
Handwrite change in procedure and have a board operator initial and date.
Answer is plausible since the change is administrative in nature.
36 H
2 N
S 37 F
3 N
S 38 F
3 B
E Enhanced to be more Millstone specific. Initial condition statement changed to Millstone 2 is performing a reactor startup by means of CEA withdrawal.
39 F
2 N
S 40 H
2 M
S 41 F
2 N
E Edited stem to What Containment parameter would differentiate between an RCS leak and a steam leak?
42 F
3 B
S 43 F
2 B
S 44 H
3 B
S 45 H
2 M
S 46 H
2 N
S 47 F
2 N
S
48 F
2 N
E Added more specific Millstone language. Changed to:
Water in the Unit 2 hotwell is 1. its boiling point; therefore, it is subcooled.
Any additional heat addition will 2..
Q#
- 1.
LOK (F/H)
- 2.
LOD (1-5)
- 3. Psychometric Flaws
- 4. Job Content Flaws
- 5. K/A Use Flaws
- 6. Source (B/M/N)
- 7. Status (U/E/S)
- 8. Explanation Stem Focus Cues T/F Cred.
Dist.
Partial Job Link Minutia
- /Units Logic Q-K/A License Level 49 H
3 N
S 50 H
3 B
S 51 F
1 X
N U
This question too easy a question (GFE). Redrew K/A and rewritten question is SAT.
52 H
3 X
N U
1st bullet cues answer. Bullet removed:.
- PRESSURIZER CH Y LEVEL HI/LO (C02/03, A-39) annunciates.
53 F
2 M
S 54 H
3 B
S 55 H
3 M
S 56 F
2 B
S 57 H
3 B
S 58 H
3 N
E Redrew K/A. Is this SRO level TS?
59 H
3 N
E Minor edit, Formatted all numbers to this style: Two (2) 60 H
3 N
E Minor edits, removed periods.
61 F
2 B
E Underlined only in A & B.
62 F
3 B
E MSIVs in distractors make the answer choices obvious since the stem refers to a main steam isolation signal. Reworded stem to What Main Steam System valves, in addition to MSIVs, receive a CLOSE signal on a Main Steam Isolation (MSI)?
Removed one choice from each answer.
63 F
3 N
S 64 H
2 N
S
Q#
- 1.
LOK (F/H)
- 2.
LOD (1-5)
- 3. Psychometric Flaws
- 4. Job Content Flaws
- 5. K/A Use Flaws
- 6. Source (B/M/N)
- 7. Status (U/E/S)
- 8. Explanation Stem Focus Cues T/F Cred.
Dist.
Partial Job Link Minutia
- /Units Logic Q-K/A License Level 65 H
3 X
N U
Question as written is SRO level. Changed question to a < 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> LCO failed Reactor Protection System channel.
66 F
2 B
S 67 H
3 B
S 68 H
3 B
S 69 H
3 N
S 70 H
3 N
S 71 H
3 M
E Underlined only.
72 H
3 B
E Minor edit, use of LNP - Changed D2 to The Instrument Air Compressors dont auto-start on a LOOP.
73 F
2 B
E Tier 4, minor edit to make more Millstone specific, Changed stem to The thermal conductivity of a Millstone 2 fuel assembly from the fuel pellets to the reactor coolant at beginning of cycle (BOC) is 1. than the end of cycle (EOC) due to 2..
74 H
3 N
S 75 H
2 M
E Minor edit - Changed question to : What effect (if any) will this have on the plant?