Form 2.3-5, Written Examination Review Worksheet
ML23059A226
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/22/2023
From: Thomas Setzer
NRC/RGN-I/DORS/OB
To:
Dominion Nuclear Connecticut
Shared Package
ML22300A088 List:
References
EPID L-2023-OLL-0036
Download: ML23059A226 (1)


Text

Form 2.3-5 Written Examination Review Worksheet

Q#

1.

LOK (F/H)

2.

LOD (1-5)

3. Psychometric Flaws
4. Job Content Flaws
5. K/A Use Flaws
6. Source (B/M/N)
7. Status (U/E/S)
8. Explanation Stem Focus Cues T/F Cred.

Dist.

Partial Job Link Minutia

  1. /Units Logic Q-K/A License Level 1

H 3

B S

2 F

3 X

N U

Answer D is also a correct answer. The plausibility statement also seems to indicate so.

Rewrote question, new question meets K/A and is SAT 3

H 3

N S

4 F

2 X

B U

A2 and C2 can be correct, BOP can always do something (subjective)

1. Reworded the second part of the question to read:

The 2. is required to place-keep the master copy of the procedure.

2. Removed the verbs (is required to; can) from the answers.

Removed second half of question because of syntax issues. Now reads In accordance with AD-AA-102, Procedure Use and Adherence Added a fourth bullet since it could be argued there are two correct answers without it.

  • The US has NOT authorized Reader-Doer 5

F 2

N S

6 H

3 M

E

1. Capitalized FW-44 noun name.
2. B is not an isolate action as asked by the stem.

Changed B to Place the #1 RESET/NORMAL/OVRD switch in OVRD and release. Also changed the plausibility statement. Operation of the switch will have no effect on feeding the S/G since the AFRV is failed open due to the loss of power.

7 F

3 B

S 8

F 2

N E

Question as written is not very discriminating and is borderline minutia. Changed question to ask where the Gaseous Radwaste discharge valves are operated from vice where they can be monitored.

9 H

2 N

S 10 H

3 M

S 11 H

2 B

S

12 H

3 N

E

1. First part of question tips off answer with plural verb. Changed 1 to What system(s) is/are operating to prevent Containment pressure from exceeding 54 psig?
2. Add words to define when the 15 minute clock starts. Changed 2 to What is the expected condition of Containment pressure 15 minutes after the steam generator has blown dry?

13 F

2 B

S 14 H

3 B

E Added with no operator actions to stem 15 F

2 N

S 16 H

3 N

E D is implausible. Changed D to SI-657 fails open.

This is plausible if the examinee doesnt remember the fail position of the valve.

Q#

1.

LOK (F/H)

2.

LOD (1-5)

3. Psychometric Flaws
4. Job Content Flaws
5. K/A Use Flaws
6. Source (B/M/N)
7. Status (U/E/S)
8. Explanation Stem Focus Cues T/F Cred.

Dist.

Partial Job Link Minutia

  1. /Units Logic Q-K/A License Level 17 H

3 M

S 18 H

3 M

S 19 H

3 B

S 20 F

2 N

S 21 H

3 N

S 22 F

2 B

S 23 H

3 B

S 24 H

3 N

S 25 F

2 M

E Question as written is not a good match for the K/A.

Pressurizer system is covered on other exam questions so this is also an overlap issue. Randomly selected 076 Service Water, 191001 K1.04 Redrew K/A, new question is SAT.

26 F

2 B

S 27 H

3 B

E The term appropriate is subjective. Changed question to What procedure is entered to mitigate this problem?

28 H

3 X

N U

The question as written is an SRO level question.

Rewrote question to RO level.

29 H

3 B

E Changed withdrawal to withdraw in distractors.

30 F

2 M

S 31 H

2 N

S 32 F

2 M

E Distractor D can be argued as correct as well if it is accomplished manually. Added to stem : Where will letdown be automatically directed to when the A CLRW Receiver tank gets full?.

Q#

1.

LOK (F/H)

2.

LOD (1-5)

3. Psychometric Flaws
4. Job Content Flaws
5. K/A Use Flaws
6. Source (B/M/N)
7. Status (U/E/S)
8. Explanation Stem Focus Cues T/F Cred.

Dist.

Partial Job Link Minutia

  1. /Units Logic Q-K/A License Level 33 F

2 N

S 34 H

3 N

E Awkward wording in stem (remains to be fulilled).

Changed part 1. to Which parameter is still required to be met to satisfy HPSI throttle/stop criteria?

35 F

3 M

E Distractor D2 stands out. Changed FIP to Feedback Incorporation Process.

Changed answer B based on validator pointing out that B could also be correct. Changed answer to:

Handwrite change in procedure and have a board operator initial and date.

Answer is plausible since the change is administrative in nature.

36 H

2 N

S 37 F

3 N

S 38 F

3 B

E Enhanced to be more Millstone specific. Initial condition statement changed to Millstone 2 is performing a reactor startup by means of CEA withdrawal.

39 F

2 N

S 40 H

2 M

S 41 F

2 N

E Edited stem to What Containment parameter would differentiate between an RCS leak and a steam leak?

42 F

3 B

S 43 F

2 B

S 44 H

3 B

S 45 H

2 M

S 46 H

2 N

S 47 F

2 N

S

48 F

2 N

E Added more specific Millstone language. Changed to:

Water in the Unit 2 hotwell is 1. its boiling point; therefore, it is subcooled.

Any additional heat addition will 2..

Q#

1.

LOK (F/H)

2.

LOD (1-5)

3. Psychometric Flaws
4. Job Content Flaws
5. K/A Use Flaws
6. Source (B/M/N)
7. Status (U/E/S)
8. Explanation Stem Focus Cues T/F Cred.

Dist.

Partial Job Link Minutia

  1. /Units Logic Q-K/A License Level 49 H

3 N

S 50 H

3 B

S 51 F

1 X

N U

This question too easy a question (GFE). Redrew K/A and rewritten question is SAT.

52 H

3 X

N U

1st bullet cues answer. Bullet removed:.

  • PRESSURIZER CH Y LEVEL HI/LO (C02/03, A-39) annunciates.

53 F

2 M

S 54 H

3 B

S 55 H

3 M

S 56 F

2 B

S 57 H

3 B

S 58 H

3 N

E Redrew K/A. Is this SRO level TS?

59 H

3 N

E Minor edit, Formatted all numbers to this style: Two (2) 60 H

3 N

E Minor edits, removed periods.

61 F

2 B

E Underlined only in A & B.

62 F

3 B

E MSIVs in distractors make the answer choices obvious since the stem refers to a main steam isolation signal. Reworded stem to What Main Steam System valves, in addition to MSIVs, receive a CLOSE signal on a Main Steam Isolation (MSI)?

Removed one choice from each answer.

63 F

3 N

S 64 H

2 N

S

Q#

1.

LOK (F/H)

2.

LOD (1-5)

3. Psychometric Flaws
4. Job Content Flaws
5. K/A Use Flaws
6. Source (B/M/N)
7. Status (U/E/S)
8. Explanation Stem Focus Cues T/F Cred.

Dist.

Partial Job Link Minutia

  1. /Units Logic Q-K/A License Level 65 H

3 X

N U

Question as written is SRO level. Changed question to a < 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> LCO failed Reactor Protection System channel.

66 F

2 B

S 67 H

3 B

S 68 H

3 B

S 69 H

3 N

S 70 H

3 N

S 71 H

3 M

E Underlined only.

72 H

3 B

E Minor edit, use of LNP - Changed D2 to The Instrument Air Compressors dont auto-start on a LOOP.

73 F

2 B

E Tier 4, minor edit to make more Millstone specific, Changed stem to The thermal conductivity of a Millstone 2 fuel assembly from the fuel pellets to the reactor coolant at beginning of cycle (BOC) is 1. than the end of cycle (EOC) due to 2..

74 H

3 N

S 75 H

2 M

E Minor edit - Changed question to : What effect (if any) will this have on the plant?