MONTHYEARML24264A1712024-09-20020 September 2024 Framatome, Inc. - License Amendment Request for TRISO Fuel Production at the Framatome Fuel Fabrication Facility in Richland, Wa ML24211A0592024-07-29029 July 2024 Framatome Inc. – Physical Security Core Inspection Report 07001257-2024401 Public ML24190A0292024-07-19019 July 2024 Framatome - Richland - Core Inspection Report 07001257/2024002 ML24179A1172024-06-27027 June 2024 Framatome-Richland – Inspection Schedule for Calendar Year 2025 ML24116A2922024-04-29029 April 2024 Framatome-Richland - Core Inspection Report 07001257/2024001 ML24092A2752024-04-0303 April 2024 Acceptance for Review of Framatome, Incs Triennial Update to Decommissioning Funding Plan - Enterprise Project Identifier Number L-2024-DFA-0000 ML24065A4842024-03-0808 March 2024 Framatome Inc. - Licensee Performance Review - Nuclear Regulatory Commission Inspection Report 07001257/2024005 ML24026A2792024-01-31031 January 2024 Framatome - Richland – Integrated Inspection Report 07001257/2023004 ML24031A5432024-01-23023 January 2024 Triennial Update to Decommissioning Funding Plan (DFP) for the Framatome Inc., Richland Nuclear Fuel Fabrication Facility Cover Letter ML23352A3912023-12-20020 December 2023 Framatome Inc. - Richland Material Control and Accounting Program Inspection Report 07001257-2023401-Public Cover Letter ML23313A0772023-11-27027 November 2023 Framatome Inc. - Request to Amend License and Approve Criticality Safety Methods - License Amendment 19 (Enterprise Project Identification Number L-2023-LLA-0073) ML23296A0072023-10-25025 October 2023 Framatome-Richland - Core Inspection Report 07001257/2023003 ML23291A2042023-10-18018 October 2023 Framatome Inc., Richland Nuclear Fuel Fabrication Facilitys Request to Amend License No. SNM-1227 and Approval of Criticality Safety Methods ML23255A2892023-09-15015 September 2023 Framatome-Richland – Inspection Schedule for Calendar Year 2024 ML23254A2502023-09-13013 September 2023 Request of Additional Information Letter to Framatome ML23202A2022023-07-24024 July 2023 Framatome Richland Core Inspection Report 07001257/2023002 ML23198A3172023-07-17017 July 2023 Framatome Inc. Richland Nuclear Fuel Fabrication Facilitys Revised Chapter 1 of License No. SNM-1227 ML23144A3092023-06-21021 June 2023 Acceptance Letter for Request by Framatome for a License Amendment for an Approval of Criticality Safety Methods ML23144A3372023-06-12012 June 2023 Letter to Framatome Approval of Request to Withhold Proprietary Information ML23145A3082023-06-0202 June 2023 Framatome - Licensing Project Manager Change Letter ML23137A3962023-05-17017 May 2023 Framatome, Inc., Richland Nuclear Fuel Fabrication Facility’S Request to Amend License No. SNM-1227; and Approval of Criticality Safety Methods ML23137A4062023-05-17017 May 2023 Framatome, Inc., Submittal of NRC Form 327s Which Report the Results of Material Balance Accounting and Seid Calculations for the Period March 22, 2022 to March 20, 2023 ML23089A2592023-04-10010 April 2023 2023-001 Framatome-Richland - NRC Integrated Inspection Report 07001257/2023001 ML23089A2602023-03-30030 March 2023 Framatome, Inc. - 2023 Fee Increase for Fuel Cycle Licensees; License No. SNM-1227; Docket No. 70-1257 ML23054A2562023-02-23023 February 2023 60-Day Report to January 2, 2023, Incident Reported Under 10 CFR 70 Appendix a Concurrent Report (NRC Event No. 56292); Framatome Richland Facility; License No. SNWI-1227; Docket No. 70-1257 ML22336A0992023-02-0303 February 2023 Cover Letter - Framatome Proprietary Approval 3x Letter of Intent Submittals 11/21/2022 and 11/29/2022 ML23030B6172023-01-31031 January 2023 Framatome-Richland - Core Inspection Report 07001257/2022004 ML23025A3172023-01-25025 January 2023 Submittal of Integrated Safety Analysis (ISA) Summary Annual Update for Framatome Inc.S (Framatomes) Richland, Washington Fuel Fabrication Facility ML22341A1562022-12-0707 December 2022 60-day Follow Up Report for an Incident Reported Under 10 CFR 70 Appendix a (C) Concurrent Report (NRC Event No.56713); Framatome Richland Facility ML22272A0252022-10-0404 October 2022 Framatome-Richland -Integrated Inspection Report 07001257/2022003 ML22263A4652022-09-20020 September 2022 Framatome, Inc. Submittal of Revised Fundamental Nuclear Material Control Plan ML22255A0122022-08-31031 August 2022 Framatome Inc. - Required Reporting of Effluents Per 10 CFR 70.59 ML22238A1602022-08-24024 August 2022 Framatome Richland Facility Emergency Plan Version 16.0 ML22236A5872022-08-23023 August 2022 Framatome Inc., Richland Nuclear Fuel Fabrication Facility'S Intent to Amend License No. SNM-1227; ML22201A5352022-07-21021 July 2022 Framatome 2022-002 Integrated Quarterly Inspection Report ML22192A1272022-07-11011 July 2022 Framatome, Inc., 60-day Report for a May 12, 2022 Incident Reported Under 10 CFR 70 Appendix a 24-hour Report (NRC Event No. 55897) ML22154A4382022-07-11011 July 2022 Cover Letter - Framatome Inc. - Request to Amend License and Approve Criticality Safety Methods - License Amendment 18 (Enterprise Project Identification Number L-2021-LLA-0218) ML22187A1892022-06-29029 June 2022 Framatome-Richland - Inspection Schedule for Calendar Year 2023 ML22187A0392022-06-28028 June 2022 Framatome Documentation Request - 2022-003 PMT ML22137A1282022-06-23023 June 2022 Cover Letter - Framatome- DFP Info and Form 327 Proprietary Review ML22166A3432022-06-10010 June 2022 Framatome Lnc., Submittal of Quality Assurance Program, FS1-0011462, Revision 8.0, 10 CFR 71, Subpart H Quality Assurance Program Description for Packaging and Transportation of Radioactive Materials for Us Fuel ML22132A2292022-05-12012 May 2022 Framatome, Inc., Submittal of NRC Form 327 ML22132A2952022-05-12012 May 2022 Framatome, Inc., Submittal of Triennial Update to Decommissioning Funding Plan (DFP) for the Richland Nuclear Fuel Fabrication Facility ML22087A1212022-03-31031 March 2022 Cover Letter Framatome Inc., - Request for Additional Information Regarding License Amendment Request for Approval of Criticality Safety Methods (Enterprise Project Identification Number L-2021-LLA-0218) ML22059A7582022-03-0303 March 2022 Framatome, Inc., Licensee Performance Review (Nuclear Regulatory Commission Inspection Report 0701257/2022005) ML22060A1262022-03-0101 March 2022 60-day Report to January 4, 2022 Incident Reported Under 10 CFR 70 Appendix a Concurrent Report (NRC Event No. 55686); Framatome Richland Facility; License No. SNM-1227; Docket No. 70-1257 ML22066B2732022-02-28028 February 2022 Framatome, Inc. - Required Reporting of Effluents Per 10 CFR 70.59 for July-December 2021 ML22033A1722022-01-27027 January 2022 Framatome, Inc. Richland Washington Fuel Fabrication Facility Submittal of Update to Integrated Safety Analysis (ISA) ML22025A3902022-01-25025 January 2022 60-day Report to January 4, 2022 Incident Reported Under 10 CFR 70 Appendix a Concurrent Report (NRC Event No. 55686); Framatome Richland Facility ML22024A2152022-01-25025 January 2022 Framatome, Inc. - Richland, U.S. Nuclear Regulatory Commission Integrated Inspection Report 07001257/2021004 2024-09-20
[Table view] Category:Written Event Report (30 or 60 day)
MONTHYEARML23054A2562023-02-23023 February 2023 60-Day Report to January 2, 2023, Incident Reported Under 10 CFR 70 Appendix a Concurrent Report (NRC Event No. 56292); Framatome Richland Facility; License No. SNWI-1227; Docket No. 70-1257 ML22341A1562022-12-0707 December 2022 60-day Follow Up Report for an Incident Reported Under 10 CFR 70 Appendix a (C) Concurrent Report (NRC Event No.56713); Framatome Richland Facility ML22192A1272022-07-11011 July 2022 Framatome, Inc., 60-day Report for a May 12, 2022 Incident Reported Under 10 CFR 70 Appendix a 24-hour Report (NRC Event No. 55897) ML22060A1262022-03-0101 March 2022 60-day Report to January 4, 2022 Incident Reported Under 10 CFR 70 Appendix a Concurrent Report (NRC Event No. 55686); Framatome Richland Facility; License No. SNM-1227; Docket No. 70-1257 ML22025A3902022-01-25025 January 2022 60-day Report to January 4, 2022 Incident Reported Under 10 CFR 70 Appendix a Concurrent Report (NRC Event No. 55686); Framatome Richland Facility ML22024A4832022-01-24024 January 2022 60-Day Report to December 20, 2021 Incident Concurrently Reported Per 10 CFR 70 Appendix A(C) (NRC Event No. 55666); Framatome Richland Facility ML22007A3592022-01-0707 January 2022 Framatome, Inc., 30-Day Report to December 8, 2021 Incident Reported Under 10 CFR 70.50(b)(3) (NRC Event No. 55634) ML21336A7602021-12-0202 December 2021 Framatome, Inc., Richland Facility, 30-day Report to October 12, 2021 Incident Reported Under 10 CFR 70.50(b)(1) (NRC Event No. 55517) - Redacted 2023-02-23
[Table view] |
Text
framatome
CDM-23-003
February 23, 2023 U.S. Nuclear Regulatory Commission Director, Office of Nuclear Material Safety and Safeguards Attn: Document Control Desk Washington, D.C. 20555
To whom it may concern:
Subject:
60-day report to January 2, 2023, incident reported under 10 CFR 70 Appendix A Concurrent Report (NRC Event 56292); Framatome Richland Facility; License No. SNWI-1227; Docket No. 70-1257
On January 2, 2023, the Framatome Richland facility reported to the NRC Operations Center that a Framatome employee preparing an area for painting experienced a hand injury when a heavy object fell on his hand. The worker was surveyed out of the area and confirmed to be free from radioactive contamination above free release limits and was transported to the local hospital (Kadlec Regional Medical Center) for treatment.
The Washington State Department of Labor and Industry (L&l) was notified of this injury on 01/02/2023 at 16:28. The work area was quarantined pending investigation by L&l. L&l completed their investigation of the accident scene on January 18, 2023. On February 3, 2023, L&l issued an inspection report to Framatome and reported We found no safety violations at this sit during our visit and have not issued any violations or penalties.
The initial report to the NRC Operations Center was made per the requirements of 10 CFR 70 Appendix A (C) Concurrent reports because the nature of injury required reporting to L&l.
Caller Identification
The condition was reported to the NRC Operations Center by Calvin Manning, Framatome Manager of Licensing and Compliance, on January 3, 2023, at 12:47 ET. Mr. Manning s telephone number is (509) 375-8237.
Date, Time, and Exact Location of Incident
The reportable injury occurred on January 2, 2023, at approximately 12:20 FT. The location was in the ELO Building of Framatome s Richland facility at 2101 Horn Rapids Road, Richland WA 99354.
framatome
CDM-23-003
Incident Description
On January 2, 2023, at approximately 12:20 a Framatome employee preparing an area for painting experienced a hand injury when a heavy object fell on his hand.
Health and Safety Consequences
The injured employee was transported to a local hospital and was treated for the injury.
External Conditions
No external conditions were identified.
Status of the Event
The injured employee has since returned to work, the work area has been released by L&l and the work activities in the area have been returned to normal.
Notifications to Other Agencies
Washington State Department of Labor and Industry was notified of the injury on 01/02/2023 at 1628.
Inclusion in Integrated Safety Analysis
NA. This condition relates to an industrial injury.
Probable Causes of Event
This injury occurred because a heavy object was not completely dismantled and removed during a D&D activity. The worker was unaware that the heavy object was not adequately secured to prevent falling and his work activity caused sufficient vibration to cause the object to fall and land on his hand.
Corrective and Mitigating Actions
Framatome had the employee transported by ambulance to the local hospital for treatment.
Once the work area was released by L&l, the work area was inspected and verified to be in a safe configuration before allowing work to proceed in this area.
Framatome conducted safety standdowns in all work areas to review this injury and its causes.
Framatome employees also completed safety walk downs in all work areas looking for other heavy objects that could fall and injure workers. Any heavy objects identified during the framatome
CDM-23-003
walkdowns that could fall and cause an injury were relocated to reduce the risk of similar injuries in the future.
Preventive Actions
Framatome trained plant engineers and craft/craft leadership regarding situational awareness and questioning attitude while in the Line of Fire.
Review procedures that cover project/job site transition activities. Make procedure changes, as appropriate, for gate reviews, PJB s (when jobs extend to multiple days, and turnover meetings between organizations or within organizations (craft to craft). Verify procedures adequately emphasize stopping work if the area is cluttered or if equipment is not in a safe state for work to continue.
Review monthly housekeeping/fire safety PM procedure and management expectations with PM performers. Emphasis heightened awareness for potential Line of Fire accidents and Extent of Condition reviews of events that have occurred since the last inspection (these are typically covered in Site Status Slides following events). Update, as appropriate Housekeeping PMs list Line of Fire situations as conditions to look for.
Re-train plant engineers and craft/craft leadership regarding situational awareness and questioning attitude relative to potential Line of Fire accidents
If you have questions about this incident or Framatome s response, please contact me by phone at (509) 375-8237.
Cordially,
Calvin D. Manning
Manager, Licensing and Compliance
cc: U.S. Nuclear Regulatory Commission, Region II Attn; Eric Michel, Chief Fuel Facility Branch 2 Marquis One Tower, 23 T85 245 Peachtree Center Avenue N.E., Suite 1200 Atlanta, GA 30303-8931