Letter Sequence Request |
---|
EPID:L-2023-LLA-0123, ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.1.02.08e (Index No. 40) for Vogtle Unit 4 Combined License (VOG4) (Open) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance
|
MONTHYEARND-22-0830, ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.1 0.ii (Index Number 816)2022-10-26026 October 2022 ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.1 0.ii (Index Number 816) Project stage: Request ND-22-0689, ITAAC Closure Notification on Completion of ITAAC 2.1.02.12a.i (Index Number 53)2022-11-0303 November 2022 ITAAC Closure Notification on Completion of ITAAC 2.1.02.12a.i (Index Number 53) Project stage: Request ND-22-0862, ITAAC Closure Notification on Completion of ITAAC Item C.2.5.04.04a (Index Number 561)2022-11-0808 November 2022 ITAAC Closure Notification on Completion of ITAAC Item C.2.5.04.04a (Index Number 561) Project stage: Request ND-22-0730, ITAAC Closure Notification on Completion of ITAAC 2.3.03.02 (Index Number 319)2022-11-10010 November 2022 ITAAC Closure Notification on Completion of ITAAC 2.3.03.02 (Index Number 319) Project stage: Request ND-22-0657, ITAAC Closure Notification on Completion of ITAAC 2.3.14.04 (Index Number 480)2022-11-17017 November 2022 ITAAC Closure Notification on Completion of ITAAC 2.3.14.04 (Index Number 480) Project stage: Request ND-22-0898, ITAAC Closure Notification on Completion of 3.2.00.04 (Index Number 751)2022-11-18018 November 2022 ITAAC Closure Notification on Completion of 3.2.00.04 (Index Number 751) Project stage: Request ND-22-0714, ITAAC Closure Notification on Completion of ITAAC 2.3.08.02.iii (Index Number 4171)2022-11-22022 November 2022 ITAAC Closure Notification on Completion of ITAAC 2.3.08.02.iii (Index Number 4171) Project stage: Request ND-22-0711, ITAAC Closure Notification on Completion of ITAAC 3.3.00.01 (Index Number 759)2022-11-23023 November 2022 ITAAC Closure Notification on Completion of ITAAC 3.3.00.01 (Index Number 759) Project stage: Request ML22332A5372022-11-28028 November 2022 Draft LAR 23-001 for 12-8-22 Public Meeting ND-22-0821, ITAAC Closure Notification on Completion of ITAAC 3.3.00.13 (Index Number 819)2022-11-29029 November 2022 ITAAC Closure Notification on Completion of ITAAC 3.3.00.13 (Index Number 819) Project stage: Request ML22334A0752022-12-0101 December 2022 Update to Targeted Inspections, Tests, Analysis, and Acceptance Criteria for Vogtle Electric Generating Plant Unit 4 Project stage: Request ND-22-0920, ITAAC Closure Notification on Completion of ITAAC 2.7.01 .02a (Index Number 678)2022-12-0707 December 2022 ITAAC Closure Notification on Completion of ITAAC 2.7.01 .02a (Index Number 678) Project stage: Request ND-22-0899, ITAAC Closure Notification on Completion of ITAAC 2.2.03.12a.i (Index Number 214)2022-12-15015 December 2022 ITAAC Closure Notification on Completion of ITAAC 2.2.03.12a.i (Index Number 214) Project stage: Request ND-22-0656, ITAAC Closure Notification on Completion of ITAAC 2.3.05.03b.iii (Index Number 348)2022-12-15015 December 2022 ITAAC Closure Notification on Completion of ITAAC 2.3.05.03b.iii (Index Number 348) Project stage: Request ND-22-0600, ITAAC Closure Notification on Completion of ITAAC 2.3.02.05.i (Index Number 291)2022-12-16016 December 2022 ITAAC Closure Notification on Completion of ITAAC 2.3.02.05.i (Index Number 291) Project stage: Request ND-22-0747, ITAAC Closure Notification on Completion of ITAAC 2.1 .02.08d.ii (Index Number 33)2022-12-21021 December 2022 ITAAC Closure Notification on Completion of ITAAC 2.1 .02.08d.ii (Index Number 33) Project stage: Request ND-22-0967, Resubmittal of Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 3.3.00.07d.ii.c (Index Number 802)2022-12-22022 December 2022 Resubmittal of Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 3.3.00.07d.ii.c (Index Number 802) Project stage: Request ND-22-0964, Resubmittal of Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 3.3.00.07d.ii.a (Index Number 800)2022-12-22022 December 2022 Resubmittal of Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 3.3.00.07d.ii.a (Index Number 800) Project stage: Request ND-22-0965, Resubmittal of Notice of Uncompleted IT Aac 225-days Prior to Initial Fuel Load Item 3.3.00.07d.ii.b (Index Number 801)2022-12-22022 December 2022 Resubmittal of Notice of Uncompleted IT Aac 225-days Prior to Initial Fuel Load Item 3.3.00.07d.ii.b (Index Number 801) Project stage: Request ND-22-0895, ITAAC Closure Notification on Completion of ITAAC 2.2.01.01 (Index Number 90)2022-12-28028 December 2022 ITAAC Closure Notification on Completion of ITAAC 2.2.01.01 (Index Number 90) Project stage: Request ML22349A2142023-01-0303 January 2023 Summary of December 8, 2022, Public Meeting with Southern Nuclear Operating Company Project stage: Request ND-23-1001, ITAAC Closure Notification on Completion of ITAAC 2.7.01.05.i (Index Number 684)2023-01-0505 January 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.01.05.i (Index Number 684) Project stage: Request ND-22-0848, ITAAC Closure Notification on Completion of ITAAC 2.3.02.14 (Index Number 317)2023-01-10010 January 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.02.14 (Index Number 317) Project stage: Request ND-22-0869, ITAAC Closure Notification on Completion of Item 2.3.13.05.i (Index Number 462)2023-01-12012 January 2023 ITAAC Closure Notification on Completion of Item 2.3.13.05.i (Index Number 462) Project stage: Request ND-23-0030, ITAAC Closure Notification on Completion of ITAAC 3.3.00.02a.i.d (Index Number 763)2023-01-13013 January 2023 ITAAC Closure Notification on Completion of ITAAC 3.3.00.02a.i.d (Index Number 763) Project stage: Request ND-23-0026, ITAAC Closure Notification on Completion of ITAAC 2.2.03.12a.iv (Index Number 216)2023-01-13013 January 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.03.12a.iv (Index Number 216) Project stage: Request ND-23-0029, ITAAC Closure Notification on Completion of ITAAC 3.3.00.02a.i.c (Index Number 762)2023-01-13013 January 2023 ITAAC Closure Notification on Completion of ITAAC 3.3.00.02a.i.c (Index Number 762) Project stage: Request ND-22-0649, ITAAC Closure Notification on Completion of ITAAC 2.1.02.12a.iv (Index Number 56)2023-01-13013 January 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.02.12a.iv (Index Number 56) Project stage: Request ND-22-0893, ITAAC Closure Notification on Completion of ITAAC 2.1.02.01 (Index Number 12)2023-01-16016 January 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.02.01 (Index Number 12) Project stage: Request ND-22-0700, ITAAC Closure Notification on Completion of Item 2.2.04.12a.i (Index Number 248)2023-01-20020 January 2023 ITAAC Closure Notification on Completion of Item 2.2.04.12a.i (Index Number 248) Project stage: Request ND-22-0521, ITAAC Closure Notification on Completion of ITAAC 2.2.03.08c.i.03 (Index Number 179)2023-01-20020 January 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.03.08c.i.03 (Index Number 179) Project stage: Request ND-22-0585, ITAAC Closure Notification on Completion of 2.2.02.11a.i (Index Number 154)2023-01-23023 January 2023 ITAAC Closure Notification on Completion of 2.2.02.11a.i (Index Number 154) Project stage: Request ND-23-0041, ITAAC Closure Notification on Completion of ITAAC 2.2.04.01 (Index Number 219)2023-01-26026 January 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.04.01 (Index Number 219) Project stage: Request ND-23-0078, ITAAC Closure Notification on Completion of ITAAC 2.2.02.06b (Index Number 133)2023-01-27027 January 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.02.06b (Index Number 133) Project stage: Request ND-22-0739, ITAAC Closure Notification on Completion of ITAAC 2.3.08.02.i (Index Number 415)2023-01-31031 January 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.08.02.i (Index Number 415) Project stage: Request ND-22-0876, ITAAC Closure Notification on Completion of ITAAC 3.3.00.02h 9Index Number 776)2023-01-31031 January 2023 ITAAC Closure Notification on Completion of ITAAC 3.3.00.02h 9Index Number 776) Project stage: Request ND-23-0079, ITAAC Closure Notification on Completion of ITAAC 2.3.02.02a (Index Number 285)2023-02-0202 February 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.02.02a (Index Number 285) Project stage: Request ND-23-0039, ITAAC Closure Notification on Completion of ITAAC 2.2.03.08c.ii (Index Number 181)2023-02-0303 February 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.03.08c.ii (Index Number 181) Project stage: Request ND-23-0043, ITAAC Closure Notification on Completion of ITAAC 2.1.02.08d.i (Index Number 32)2023-02-0303 February 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.02.08d.i (Index Number 32) Project stage: Request ND-22-0670, ITAAC Closure Notification on Completion of 2.4.06.02 (Index Number 504)2023-02-0707 February 2023 ITAAC Closure Notification on Completion of 2.4.06.02 (Index Number 504) Project stage: Request ND-22-0733, ITAAC Closure Notification on Completion of ITAAC 2.3.05.03c.ii (Index Number 350)2023-02-10010 February 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.05.03c.ii (Index Number 350) Project stage: Request ND-23-0130, ITAAC Closure Notification on Completion of ITAAC 2.3.07.07c (Index Number 408)2023-02-10010 February 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.07.07c (Index Number 408) Project stage: Request ND-22-0737, ITAAC Closure Notification on Completion of ITAAC 2.3.05.03d.ii (Index Number 352)2023-02-10010 February 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.05.03d.ii (Index Number 352) Project stage: Request ND-23-0124, ITAAC Closure Notification on Completion of ITAAC Item 2.3.10.12 (Index Number 879)2023-02-13013 February 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.3.10.12 (Index Number 879) Project stage: Request ND-23-0153, ITAAC Closure Notification on Completion of ITAAC 2.3.09.02a (Index Number 421)2023-02-16016 February 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.09.02a (Index Number 421) Project stage: Request ND-23-0141, ITAAC Closure Notification on Completion of ITAAC 2.3.04.05 (Index Number 332)2023-02-16016 February 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.04.05 (Index Number 332) Project stage: Request ND-23-0071, ITAAC Closure Notification on Completion of Item 2.2.05.05a.i (Index Number 259)2023-02-17017 February 2023 ITAAC Closure Notification on Completion of Item 2.2.05.05a.i (Index Number 259) Project stage: Request ND-23-0118, ITAAC Closure Notification on Completion of ITAAC 2.3.07.05.i (Index Number 396)2023-02-17017 February 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.07.05.i (Index Number 396) Project stage: Request ND-22-0919, ITAAC Closure Notification on Completion of ITAAC 3.3.00.07d.i (Index Number 799)2023-02-24024 February 2023 ITAAC Closure Notification on Completion of ITAAC 3.3.00.07d.i (Index Number 799) Project stage: Request ND-23-0159, ITAAC Closure Notification on Completion of ITAAC 2.6.03.05d.i (Index Number 613)2023-03-0101 March 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.03.05d.i (Index Number 613) Project stage: Request 2023-01-12
[Table View] |
|
---|
Category:ITAAC Closure Verification Evaluation Form (VEF)
MONTHYEARML23202A0942023-07-21021 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 3.3.00.07c.ii.a (Index No. 797) for Vogtle Unit 4 Combined License (VOG4) ML23202A1252023-07-21021 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 3.3.00.07c.ii.a (Index No. 797) for Vogtle Unit 4 Combined License (VOG4) ML23202A1852023-07-21021 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.1.03.03 (Index No. 72) for Vogtle Unit 4 Combined License (VOG4) ML23202A1782023-07-21021 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.1.02.02a (Index No. 13) for Vogtle Unit 4 Combined License (VOG4) ML23201A2162023-07-20020 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 3.3.00.08 (Index No. 813) for Vogtle Unit 4 Combined License (VOG4) ML23201A0662023-07-20020 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.6.03.04c (Index No. 603) for Vogtle Unit 4 Combined License (VOG4) ML23201A0402023-07-20020 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.2.03.05a.i (Index No. 165) for Vogtle Unit 4 Combined License (VOG4) ML23200A0412023-07-19019 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.6.04.02c (Index No. 624) for Vogtle Unit 4 Combined License (VOG4) ML23200A0992023-07-19019 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.6.01.04e (Index No. 588) for Vogtle Unit 4 Combined License (VOG4) ML23200A1972023-07-19019 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.6.01.04d (Index No. 587) for Vogtle Unit 4 Combined License (VOG4) ML23200A3112023-07-19019 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.5.02.06a.ii (Index No. 530) for Vogtle Unit 4 Combined License (VOG4) ML23200A3022023-07-19019 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.2.05.07a.i (Index No. 265) for Vogtle Unit 4 Combined License (VOG4) ML23201A1632023-07-19019 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.2.03.02a (Index No. 159) for Vogtle Unit 4 Combined License (VOG4) ML23199A0772023-07-18018 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.3.06.02a (Index No. 355) for Vogtle Unit 4 Combined License (VOG4) ML23199A2432023-07-18018 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.1.03.07.i (Index No. 78) for Vogtle Unit 4 Combined License (VOG4) ML23199A0592023-07-18018 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.1.02.05a.i (Index No. 19) for Vogtle Unit 4 Combined License (VOG4) ML23199A2522023-07-18018 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.1.01.04 (Index No. 4) for Vogtle Unit 4 Combined License (VOG4) ML23198A3322023-07-17017 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 3.5.00.06 (Index No. 831) for Vogtle Unit 4 Combined License (VOG4) ML23198A1182023-07-17017 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 3.3.00.07c.ii.b (Index No. 798) for Vogtle Unit 4 Combined License (VOG4) ML23198A3022023-07-17017 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.7.01.14 (Index No. 700) for Vogtle Unit 4 Combined License (VOG4) ML23198A2012023-07-17017 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number C.2.6.09.08a (Index No. 668) for Vogtle Unit 4 Combined License (VOG4) ML23198A1682023-07-17017 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number C.2.6.09.07 (Index No. 667) for Vogtle Unit 4 Combined License (VOG4) ML23198A1942023-07-17017 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.6.09.13a (Index No. 652) for Vogtle Unit 4 Combined License (VOG4) ML23198A1902023-07-17017 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.6.09.05c (Index No. 646) for Vogtle Unit 4 Combined License (VOG4) ML23199A0662023-07-17017 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.6.05.02.ii (Index No. 629) for Vogtle Unit 4 Combined License (VOG4) ML23198A3632023-07-17017 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.5.04.02.i (Index No. 557) for Vogtle Unit 4 Combined License (VOG4) ML23199A0912023-07-17017 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.4.02.02b for Combined License ML23198A2462023-07-17017 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.4.02.02a (Index No. 497) for Vogtle Unit 4 Combined License (VOG4) ML23198A1082023-07-17017 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.3.04.10 (Index No. 337) for Vogtle Unit 4 Combined License (VOG4) ML23199A0332023-07-17017 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.2.05.07c for Combined License ML23199A0442023-07-17017 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.2.04.12a.iii (Index No. 250) for Vogtle Unit 4 Combined License (VOG4) ML23198A0722023-07-17017 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.2.01.11a.iv (Index No. 117) for Vogtle Unit 4 Combined License (VOG4) ML23194A1812023-07-14014 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.3.04.04.ii (Index No. 331) for Vogtle Unit 4 Combined License (VOG4) ML23194A2072023-07-13013 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.6.02.02c (Index No. 595) for Vogtle Unit 4 Combined License (VOG4) ML23194A1802023-07-13013 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.7.02.03a (Index No. 703) for Vogtle Unit 4 Combined License (VOG4) ML23194A1782023-07-13013 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.6.04.02a (Index No. 622) for Vogtle Unit 4 Combined License (VOG4) ML23194A0852023-07-13013 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.2.04.02a (Index No. 220) for Vogtle Unit 4 Combined License (VOG4) ML23194A2292023-07-13013 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.7.06.03.i (Index No. 726) for Vogtle Unit 4 Combined License (VOG4) ML23193A9962023-07-12012 July 2023 ITAAC Closure Verification Evaluation Form (Vef_Icn) ML23193A9832023-07-12012 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.6.03.02.i (Index No. 597) for Vogtle Unit 4 Combined License (VOG4) ML23193A7852023-07-12012 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.5.01.02a (Index No. 506) for Vogtle Unit 4 Combined License (VOG4) ML23193A4572023-07-12012 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.6.09.08 (Index No. 650) for Vogtle Unit 4 Combined License (VOG4) ML23193A4532023-07-12012 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.2.03.10 (Index No. 206) for Vogtle Unit 4 Combined License (VOG4) ML23193A3752023-07-12012 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 3.3.00.16 (Index No. 821) for Vogtle Unit 4 Combined License (VOG4) ML23193A3722023-07-12012 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number C.2.6.09.03b (Index No. 661) for Vogtle Unit 4 Combined License (VOG4) ML23193A3712023-07-12012 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 3.3.00.17 (Index No. 822) for Vogtle Unit 4 Combined License (VOG4) ML23193B0192023-07-12012 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 3.3.00.05c (Index No. 786) for Vogtle Unit 4 Combined License (VOG4) ML23193A0132023-07-11011 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 3.3.00.10.i (Index No. 815) for Vogtle Unit 4 Combined License (VOG4) ML23192A8312023-07-11011 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.2.01.05.i (Index No. 98) for Vogtle Unit 4 Combined License (VOG4) ML23192A4562023-07-11011 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.5.02.06c.i (Index No. 532) for Vogtle Unit 4 Combined License (VOG4) 2023-07-21
[Table view] Category:Letter type:ND
MONTHYEARND-24-0103, Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests2024-04-26026 April 2024 Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests ND-24-0114, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-04-0101 April 2024 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-24-0046, (Vegp), Unit 3, Condition Prohibited by Technical Specification Limiting Condition of Operation 3.1.6 Control Bank Overlap Limits Exceeded Due to Inadequate Procedure Guidance2024-03-18018 March 2024 (Vegp), Unit 3, Condition Prohibited by Technical Specification Limiting Condition of Operation 3.1.6 Control Bank Overlap Limits Exceeded Due to Inadequate Procedure Guidance ND-24-0059, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-03-0404 March 2024 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0693, Combined License (COL) License Condition 2.D.(4)(d) Completion of Initial Criticality and Low-Power Tests2024-02-15015 February 2024 Combined License (COL) License Condition 2.D.(4)(d) Completion of Initial Criticality and Low-Power Tests ND-23-0690, Combined License (COL) License Condition 2.D.(3)(e) Completion of Pre-Critical Tests2024-02-0808 February 2024 Combined License (COL) License Condition 2.D.(3)(e) Completion of Pre-Critical Tests ND-24-0019, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-02-0101 February 2024 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0912, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-01-0202 January 2024 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0881, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-12-0404 December 2023 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0817, Report of UFSAR Chapter 14 Changes to the Initial Test Program in Accordance with License Condition 2.D.(7)(a)2023-11-17017 November 2023 Report of UFSAR Chapter 14 Changes to the Initial Test Program in Accordance with License Condition 2.D.(7)(a) ND-23-0823, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-11-0303 November 2023 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0723, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-10-0404 October 2023 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0697, Submittal of Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-09-0505 September 2023 Submittal of Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0669, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-08-0707 August 2023 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0205, Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests2023-07-28028 July 2023 Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests ND-23-0607, ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13) ND-23-0618, Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797)2023-07-20020 July 2023 Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797) ND-23-0609, Notification of Completion of All ITAAC2023-07-20020 July 2023 Notification of Completion of All ITAAC ND-23-0608, ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72) ND-22-0796, ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813) ND-23-0459, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587) ND-23-0162, ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165) ND-23-0575, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588) ND-23-0439, ITAAC Closure Notification on Completion of ITAAC 2.2.05.07a.i (Index Number 265)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.05.07a.i (Index Number 265) ND-23-0552, Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624)2023-07-18018 July 2023 Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624) ND-23-0483, ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4) ND-23-0586, ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159)2023-07-17017 July 2023 ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159) ND-23-0610, ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603)2023-07-17017 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603) ND-23-0573, ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497) ND-23-0406, ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498) ND-22-0816, ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19)2023-07-15015 July 2023 ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19) ND-23-0603, ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831) ND-23-0446, ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250) ND-23-0594, ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629) ND-23-0601, ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719) ND-23-0606, ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557) ND-23-0499, ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700) ND-23-0476, ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355) ND-23-0588, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78) ND-23-0121, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667) ND-23-0122, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668) ND-23-0597, ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530) ND-23-0002, ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270) ND-23-0543, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622) ND-23-0394, ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703) ND-23-0461, ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652) ND-22-0980, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75) ND-23-0111, ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646) ND-23-0587, ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595) ND-23-0589, ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601) 2024-04-26
[Table view] |
Text
Jamie M. Coleman 7825 River Road Regulatory Affairs Director Waynesboro, GA 30830 Vogtle 3 & 4 706-848-6926 tel
February 10, 2023
Docket No.: 52-026
ND-23-0130 10 CFR 52.99(c)(1)
U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 4 ITAAC Closure Notification on Completion of ITAAC 2.3.07.07c [Index Number 408]
Ladies and Gentlemen:
In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant (VEGP)
Unit 4 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.3.07.07c [Index Number 408], for verifying check valve exercise testing requirements, pump flowrate, and controls and displays in the main control room (MCR) of the Spent Fuel Pool Cooling System.
The closure process for this ITAAC is based on the guidanc e described in NEI 08-01, Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52, which is endorsed by the NRC in Regulatory Guide 1.215.
This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.
If there are any questions, please contact Kelli Roberts at 706-848-6991.
Respectfully submitted,
Jamie M. Coleman Regulatory Affairs Director Vogtle 3 & 4
Enclosure:
Vogtle Electric Generating Plant (VEGP) Unit 4 Completion of ITAAC 2.3.07.07c [Index Number 408]
JMC/PCM/sfr
U.S. Nuclear Regulatory Commission ND-23-0130 Page 2 of 2
cc: Regional Administrator, Region ll Director, Office of Nuclear Reactor Regulation (NRR)
Director, Vogtle Project Office NRR Senior Resident Inspector - Vogtle 3 & 4
U.S. Nuclear Regulatory Commission ND-23-0130 Enclosure Page 1 of 6
Southern Nuclear Operating Company ND-23-0130 Enclosure
Vogtle Electric Generating Plant (VEGP) Unit 4 Completion of ITAAC 2.3.07.07c [Index Number 408]
U.S. Nuclear Regulatory Commission ND-23-0130 Enclosure Page 2 of 6
ITAAC Statement
Design Commitment
7c) The SFS provides check valves in the drain line from the refueling cavity to prevent flooding of the refueling cavity during containment flooding.
- 8. The SFS provides the nonsafety-related function of removing spent fuel decay heat using pumped flow through a heat exchanger.
- 9. Safety-related displays identified in Table 2.3.7-1 can be retrieved in the MCR.
- 10. Controls exist in the MCR to cause the pumps identified in Table 2.3.7-3 to perform their listed functions.
- 11. Displays of the SFS parameters identified in Table 2.3.7-3 can be retrieved in the MCR.
Inspections/Tests/Analyses
Exercise testing of the check valves with active safety-functions identified in Table 2.3.7-1 will be performed under pre-operational test pressure, temperature and flow conditions.
ii) Testing will be performed to confirm that each SFS pump provides flow through its heat exchanger when taking suction from the SFP and returning flow to the SFP.
Inspection will be performed for retrievability of the safety-related displays in the MCR.
Testing will be performed to actuate the pumps identified in Table 2.3.7-3 using controls in the MCR.
Inspection will be performed for retrievability in the MCR of the displays identified in Table 2.3.7-3.
Acceptance Criteria
Each check valve changes position as indicated on Table 2.3.7-1.
ii) Each SFS pump produces at least 900 gpm through its heat exchanger.
Safety-related displays identified in Table 2.3.7-1 can be retrieved in the MCR.
Controls in the MCR cause pumps identified in Table 2.3.7 -3 to perform the listed functions.
Displays of the SFS parameters identified in Table 2.3.7-3 are retrieved in the MCR.
ITAAC Determination Basis
Testing is performed to demonstrate that the Spent Fuel Pool Cooling System (SFS) provides check valves in the drain line from the refueling cavity to prevent flooding of the refueling cavity during containment flooding, verifies the SFS provides the nonsafety-related function of
U.S. Nuclear Regulatory Commission ND-23-0130 Enclosure Page 3 of 6
removing spent fuel decay heat using pumped flow through a heat exchanger, and that controls exist in the Main Control Room (MCR) to cause the pumps identified in Table 2.3.7-3 to perform their listed functions. Inspections are performed to verify that safety-related displays identified in Table 2.3.7-1 can be retrieved in the MCR and that displays of the SFS parameters identified in Table 2.3.7-3 can be retrieved in the MCR.
Each check valve changes position as indicated on Table 2.3.7-1.
Testing was performed in accordance with Unit 4 Preoperational Test 4-SFS-ITPP-502 (Reference 1) as documented in Reference 2 with the initial conditions of the refueling cavity drain isolation valve closed, with water level in the refueling cavity at a level of approximately 107 ft. elevation (approximately 3 inches below the reactor vessel flange), temporary drain hose attached to the cavity drain with a valve attached and routed to a floor drain, and non-intrusive valve disk monitoring installed on SFS-PL-V071 and SFS-PL-V072. The refueling cavity drain isolation valve and the temporary valve on the drain hose were opened to initiate flow and both check valves were verified to open by flow and the non-intrusive monitoring instruments. The temporary valve on the drain hose was closed to stop flow and both check valves were verified to close using the non-intrusive monitoring instruments. This was documented in ITAAC Technical Report SV4-SFS-ITR-800408 (Reference 2). This flow path is depicted on Piping and Instrument Drawing SV4-SFS-M6-001.
This testing verified that for Unit 4, each check valve changed position as indicated on Combined Operating License (COL) Appendix C Table 2.3.7-1 (Attachment A).
ii) Each SFS pump produces at least 900 gpm through its heat exchanger.
Testing was performed in accordance with 4-SFS-ITPP-502 (Reference 1) as documented in Reference 3. The test was conducted by running each of the SFS pumps individually, taking suction from and returning flow to the Spent Fuel Pool (SFP). Once steady flow was established, instrument readings were taken at the respective SFS pump discharge flow sensor, recorded in the test procedure and corrected for measurement uncertainty. The test was performed using multiple system alignments with the demineralizers in/out of service and single and dual pump configurations.
The Unit 4 A SFS pump (SFS-MP-01A) produced a minimum flow of 1415 gallons per minute (gpm) for all alignments and the B SFS pump (SFS-MP-01B) produced a minimum flow of 1353 gpm for all alignments during testing. This was documented in ITAAC Technical Report SV4-SFS-ITR-801408 (Reference 3).
The Unit 4 preoperational test results (Reference 3) confirmed that each SFS pump produce d at least 900 gpm through its heat exchanger when taking suction from and returning flow to the SFP.
U.S. Nuclear Regulatory Commission ND-23-0130 Enclosure Page 4 of 6
Safety-related displays identified in Table 2.3.7-1 can be retrieved in the MCR.
An inspection was performed to confirm that safety-related displays identified in COL Appendix C Table 2.3.7-1 (Attachment B) can be retrieved in the MCR.
The inspection visually confirmed that when each of the safety-related displays identified in Attachment B was summoned at the MCR Protection and Safety Monitoring System (PMS)
Visual Display Units (VDUs), the summoned safety-related display appears on the PMS VDU.
This was documented in ITAAC Technical Report SV4-SFS-ITR-802408 (Reference 4).
This confirmed that the safety-related displays identified in Table 2.3.7-1 can be retrieved in the Unit 4 MCR.
Controls in the MCR cause pumps identified in Table 2.3.7-3 to perform the listed functions.
Testing was performed to verify controls in the MCR cause pumps identified in COL Appendix C Table 2.3.7-3 (Attachment C) to perform the listed functions.
Testing was performed by ensuring the SFS B Train was filled and vented and then SFS Pump B was started per the operating procedure in the MCR. The test then ensured the SFS A Train was filled and vented and then SFS Pump A was started per the operating procedure in the MCR. Both pump starts were verified locally and documented in ITAAC Technical Report SV4-SFS-ITR-802408 (Reference 4).
This confirmed that controls in the MCR cause pumps identified in Table 2.3.7-3 to perform the listed functions.
Displays of the SFS parameters identified in Table 2.3.7-3 are retrieved in the MCR.
An inspection was performed to confirm that the displays identified in COL Appendix C Table 2.3.7-3 (Attachment D) can be retrieved in the MCR.
The inspection visually confirmed that when each of the displays of parameters identified in Attachment D was summoned at a MCR workstation, the summoned plant parameter appeared on a display monitor at that MCR workstation. This was documented in ITAAC Technical Report SV4-SFS-ITR-802408 (Reference 4).
References 1 through 4 are available for NRC inspection as part of the Unit 4 ITAAC Completion Package (Reference 5).
List of ITAAC Findings
In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there were no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 2.3.07.07c (Reference 5) and is available for NRC review.
U.S. Nuclear Regulatory Commission ND-23-0130 Enclosure Page 5 of 6
ITAAC Completion Statement
Based on the above information, SNC hereby notifies the NRC that ITAAC 2.3.07.07c was performed for VEGP Unit 4 and that the prescribed acceptance criteria were met.
Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.
References (available for NRC inspection)
- 1. 4-SFS-ITPP-502, Rev 1.1, TPC for Spent Fuel Pool Cooling System Flow Path Preoperational Test Procedure
- 2. SV4-SFS-ITR-800408, Rev 0, ITAAC Technical Report, Unit 4 Recorded Results of SFS Check Valves Position: ITAAC 2.3.07.07c Item 7c
- 3. SV4-SFS-ITR-801408, Rev 0, ITAAC Technical Report, Unit 4 Recorded Results of SFS Pump Flow: ITAAC 2.3.07.07c Item 8.ii
- 4. SV4-SFS-ITR-802408, Rev 0, ITAAC Technical Report, Unit 4 Recorded Results of MCR Safety-Related Displays: ITAAC 2.3.07.07c Item 9, 10 and 11
- 5. 2.3.07.07c-U4-CP-Rev0, ITAAC Completion Package
U.S. Nuclear Regulatory Commission ND-23-0130 Enclosure Page 6 of 6
Attachment A
- Excerpt from COL Appendix C Table 2.3.7-1
- Component Name *Tag No. *Active Function Refueling Cavity Drain Line SFS-PL-V071 Transfer Open Check Valve Transfer Closed Refueling Cavity Drain Line SFS-PL-V072 Transfer Open Check Valve Transfer Closed
Attachment B
- Excerpt from COL Appendix C Table 2.3.7-1
- Component Name *Tag No. *Safety-Related Display Spent Fuel Pool Level Sensor SFS-019A Yes Spent Fuel Pool Level Sensor SFS-019B Yes Spent Fuel Pool Level Sensor SFS-019C Yes Refueling Cavity Drain to SGS Compartment SFS-PL-V031 Yes Isolation Valve Refueling Cavity Drain to Containment Sump SFS-PL-V033 Yes Isolation Valve SFS Containment Floodup Isolation Valve SFS-PL-V075 Yes
Attachment C
- Excerpt from COL Appendix C Table 2.3.7 -3
- Component Name *Tag No. *Control Function SFS Pump A SFS-MP-01A Start SFS Pump B SFS-MP-01B Start
Attachment D
- Excerpt from COL Appendix C Table 2.3.7-3
- Component Name *Tag No. *Display SFS Pump A SFS-MP-01A Yes (Run Status)
SFS Pump B SFS-MP-01B Yes (Run Status)
SFS Flow Sensor SFS-13A Yes SFS Flow Sensor SFS-13B Yes Spent Fuel Pool Temperature Sensor SFS-018 Yes Cask Loading Pit Level Sensor SFS-022 Yes