ML23041A391
| ML23041A391 | |
| Person / Time | |
|---|---|
| Site: | 07109375 |
| Issue date: | 02/10/2023 |
| From: | Manzione K Holtec |
| To: | Office of Nuclear Material Safety and Safeguards, Document Control Desk |
| References | |
| EPID L2022-LLA-0030, 2404025-NRC | |
| Download: ML23041A391 (1) | |
Text
Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 Doc. I.D.: 2404025-NRC Page 1 of 1 February 10, 2023 US Nuclear Regulatory Commission Division of Fuel Management Office of Nuclear Material Safety and Safeguards ATTN: USNRC Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Docket No.:
Subject:
Notification of Fabrication of the HI-STAR ATB-1T Transportation regulations, specifically 10 CFR 71.93(c), require a certificate holder or applicant for a certificate to submit a notice to the US NRC 45 days before the first cask is fabricated.
While this regulation does not explicitly apply to the HI-STAR ATB-1T cask, as its heat load and operating pressure are less than those outlined in 10 CFR 71.93(c), Holtec is providing this letter as information that fabrication on the first HI-STAR ATB-1T cask is planned to begin around March 3, 2023.
If you have any questions, please contact me at 856-797-0900 Ext. 3951.
Sincerely, Kimberly Manzione Director of Licensing Holtec International