ML23034A213
| ML23034A213 | |
| Person / Time | |
|---|---|
| Site: | Hermes File:Kairos Power icon.png |
| Issue date: | 02/03/2023 |
| From: | Hastings P Kairos Power |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| Shared Package | |
| ML23034A212 | List: |
| References | |
| KP-NRC-2302-001 | |
| Download: ML23034A213 (1) | |
Text
KP-NRC-2302-001 Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE, Unit A 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211 February 3, 2023 Docket No. 50-7513 US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Kairos Power LLC Transmittal of Changes to Preliminary Safety Analysis Report, Revision 1, Chapter 2
References:
- 1. Letter, Kairos Power LLC to Document Control Desk, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 1, September 29, 2022 (ML22272A594)
- 2. Audit Plan, Nuclear Regulatory Commission, Kairos Power, LLC - Plan for a General Audit of the Hermes Construction Permit Application, February 10, 2022 (ML22039A336)
In September 2022, Kairos Power submitted Revision 1 of the Preliminary Safety Analysis Report (PSAR)
(Reference 1) as part of the Construction Permit Application (CPA) for the Hermes non-power reactor.
This letter transmits changes to the pages of the PSAR to address NRC feedback received on PSAR Chapter 2 in the General Audit (Reference 2). Changes to the pages of the PSAR are provided in. Kairos Power requests NRC review of these changes as part of the continued review of the Hermes CPA.
If you have any questions or need any additional information, please contact Austin Clark at clark@kairospower.com or (704) 247-6310 Ext. 1337, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on February 3, 2023 Sincerely, Peter Hastings, PE Vice President, Regulatory Affairs and Quality
Enclosure:
Changes to PSAR, Revision 1, Chapter 2
KP-NRC-2302-001 Page 2 xc (w/enclosure):
William Jessup, Chief, NRR Advanced Reactor Licensing Branch Benjamin Beasley, Project Manager, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor Licensing Branch Samuel Cuadrado de Jesus, Project Manager, NRR Advanced Reactor Licensing Branch Matthew Hiser, Project Manager, NRR Advanced Reactor Licensing Branch