ML23023A198
| ML23023A198 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 01/23/2023 |
| From: | Henry D Constellation Energy Generation |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| Shared Package | |
| ML23023A197 | List: |
| References | |
| CCN: 23-02 | |
| Download: ML23023A198 (1) | |
Text
CCN: 23-02 10CFR 50.55a January 23, 2022 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station (PBAPS) Unit 2 Subsequent Renewed Facility Operating License No. DPR-44 NRC Docket No. 50-277
Subject:
Submittal of the lnservice Inspection (ISI) Owner's Activity Report (OAR) for the 24th Refueling Outage for Unit 2 Attached is the ISI Owner's Activity Report for the 24th refueling cycle covering ISI activities associated with the first period of the 5th ISI inspection interval for Unit 2. This report is submitted in accordance with 10CFR 50.55a(b)(2)(xxxii); ASME Section XI, Article IWA-6200; and ASME Code Case N-532-5.
If you have any questions or require additional information, please contact Marcellus Ruff at 610-765-5231.
Sincerely, David A. Henry Site Vice President Peach Bottom Atomic Power Station Attachment cc:
USNRC, Regional Administrator, Region 1 USNRC, Senior Resident Inspector, PBAPS W. DeHaas, Commonwealth of Pennsylvania S. Seaman, State of Maryland B. Watkins, PSEG