Encl - Humboldt Bay RAI, HBI-L6, Humboldt Bay ISFSI Quality Assurance Plan, Rev. 1
ML22340A537
Person / Time
Site: Humboldt Bay, 07100969
Issue date: 12/19/2022
From:
NRC/NMSS/DFM/IOB
To:
Pacific Gas & Electric Co
Shared Package
ML22340A535 List:
References
Download: ML22340A537 (1)


Text

Request for Additional Information Humboldt Bay Docket No. 72-0027 HBI-L6, Humboldt Bay ISFSI Quality Assurance Plan, Revision 1 By submittal dated July 19, 2022, Pacific Gas and Electric Company (PG&E) requested approval of HBI-L6, Humboldt Bay ISFSI Quality Assurance Plan, Revision 1. This request for additional information (RAI) identifies information needed by the U.S. Nuclear Regulatory Commission (NRC) staff in connection with its review of the PG&E Quality Assurance Plan (QAP). The requested information is listed by chapter number and title in the applicant's QAP.

NUREG 2215, Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities," was used by the staff in its review.

Each RAI describes the information needed by the staff for it to complete its review of the submittal and to determine whether the applicant has demonstrated compliance with the regulatory requirements.

Section 12.0 CONTROL OF MEASURING AND TEST EQUIPMENT 12.1 State the quality requirements that PG&E intends to impose on Humboldt Bay (HB)

Independent Spent Fuel Storage Installation (ISFSI) facility procedures or QA programs related to the control of measuring and test equipment (M&TE) to ensure compliance with Title 10 of the Code of Federal Regulations (10 CFR), Part 72.164, Control of measuring and test equipment.

Section 3 of Enclosure 1, Description and Justification for Proposed Changes Included in Revision 1 of the Humboldt Bay Independent Spent Fuel Storage Installation Quality Assurance Plan, states, HB ISFSI does not currently possess or maintain M&TE. Should this change in the future, then HB ISFSI will provide instructions for their use and maintenance through facility procedures.

Section 12.1, GENERAL REQUIREMENTS, states, Proper control, calibration, and adjustments at specified periods to maintain accuracy of M&TE is described in HB ISFSI facility procedures as appropriate. The calibration program shall be compliant with an approved QA Program.

The previously approved NRC-approved HB QAP committed to using Diablo Canyon Power Plants (DCPP) Radiation Protection organization for controlling M&TE. DCPP has an NRC-approved QAP that meets the requirements of 10 CFR 50, Appendix B, and has been determined to incorporate the proper controls for M&TE. Since PG&E intends to control activities related to M&TE using HB procedures, PG&E needs to delineate the quality requirements that it intends to incorporate into these procedures should they be created and implemented.

This information is needed to determine compliance with 10 CFR 72.164.

Enclosure

ML22340A535; ML22340A537 OFFICE NMSS/DFM/IOB NMSS/DFM/STLB NMSS/DFM/IOB NAME AThomlinson AT SFigueroa SF ARivera-Varona AR DATE Dec 6, 2022 Dec 6, 2022 Dec 16, 2022