Enclosure 1: Changes to the Vallecitos Nuclear Center Limited Post Shutdown Decommissioning Activities Report
ML22326A353
Person / Time
Site: Vallecitos, Vallecitos Nuclear Center
Issue date: 11/22/2022
From:
GE Hitachi Nuclear Energy
To:
Office of Nuclear Material Safety and Safeguards
Shared Package
ML22326A351 List:
References
M220157
Download: ML22326A353 (1)


Text

Enclosure1toGEHLetterM220157 ChangestotheVallecitosNuclearCenterLimitedPostShutdown DecommissioningActivitiesReport

1

DOCUMENTPURPOSE:

ThisdocumentprovidesanupdatetoinformationsubmittedintheVallecitosNuclearCenter LimitedPostShutdownDecommissioningActivitiesReport.

Contents A.

ChangestoTable41VBWRSchedule:.................................................................................................1 B.

ChangestoTable41,EVESRSchedule:................................................................................................1 C.

AdditionalContentChanges:................................................................................................................2

A.

ChangestoTable41VBWRSchedule:

Description Theforecastcompletiondateforbioshieldremovalhasbeenupdatedandexplanatorydetailaddedin theCompletioncolumn.

Activity Start Completion BioshieldRemoval&AsbestosAbatement Theupperbioshieldisremoveableandiscontaminated withasbestos.Allofthisbioshieldwillberemoved, includingtheprimarypiping,anddisposedatalicensed facility.Further,hazardousmaterialswillbeabated duringthisactivity June 2022 Primarypipingwillberemoved inassociationwithVBWRIntact RemovalPreparationsoverthe 1sthalfof2023 Thewastegeneratedin Novemberwillbedisposed within90daysofgeneration NLTJan2023 B.

ChangestoTable41,EVESRSchedule:

Description TheforecastcompletiondateforplanningactivitiesandD&Dactivitieshavebeenupdated.

Activity Start Completion Planning:

Development/submittalofthisLPSDAR Developmentofspecifications,RequestforProposals (RFPs), receipt and evaluation of proposals and decisionmakingfordemolitionoptionsforremaining components Polarcranerepair/replaceevaluation Developmentofplansandproceduresforexecutionof decommissioningactivities November 2023 June2027

toGEHLetterM220157 ChangestotheVallecitosNuclearCenterLimitedPostShutdown DecommissioningActivitiesReport

2

Characterizationofremainingcomponents Dismantlement&Decontamination PolarCranerepair/replacement Hazardousmaterialsabatement RemovalofEVESRVessel,internalsandinterferences througheithersegmentationorintactremovaland disposal RemovalofremainingSSCsincludingmiscellaneous piping,vessels,valves,andtanks ConcretedemolitiontobelowDCGLsincluding activatedportionsofbioshieldandotherfacilities withinthe300licensedArea Removalofanyimpactedsoilsasrequired Removalofanymiscellaneouscomponentsas necessarytofacilitatelicensetermination March2024 April2030

C.

AdditionalContentChanges:

Description Section4.1.3,lastsentenceonPg19currentlyreads:SeparateFSSPlanswillbedevelopedforVBWR andEVESR,reflectingthedifferentcompletiondates.

BecausetheresidualcontaminationintheVBWRwillbetransferredtotheEVESRlicensethissentenceis replacedwith:AnFSSPlanwillbedevelopedforboththeVBWRandtheEVESRfacilitieswitha completiondatesupportingthefinallicenseterminationdateoftheEVESRlicense.

Description Section4.1.3,lastparagraphcurrentlyreads:TheVBWRFSSwillverifythatanyresidualradioactive materialwillnotposeapotentialradiationdosetoworkersorpublicinexcessofthe10CFR20,Subpart E,decommissioningdosecriterionof25mremperyear,consideringthatVBWRremainsboundedbythe 300AreawhichfallsundertheEVESRlicense.

ThissentenceisdeletedbecauseaseparateFinalStatusSurvey(FSS)willnotbeperformedforVBWR.

TheFSSwillbeperformedundertheEVESRlicenseandwillincludetheVBWRfacility.