Enclosure 1 to GEH Letter M220157 Changes to the Vallecitos Nuclear Center Limited Post Shutdown Decommissioning Activities Report DOCUMENT PURPOSE:

This document provides an update to information submitted in the Vallecitos Nuclear Center Limited Post Shutdown Decommissioning Activities Report.

Contents A. Changes to Table 41 VBWR Schedule: ................................................................................................. 1 B. Changes to Table 41, EVESR Schedule: ................................................................................................ 1 C. Additional Content Changes: ................................................................................................................ 2 A. Changes to Table 41 VBWR Schedule:

Description The forecast completion date for bioshield removal has been updated and explanatory detail added in the Completion column.

Activity Start Completion Bioshield Removal & Asbestos Abatement June Primary piping will be removed The upper bioshield is removeable and is contaminated 2022 in association with VBWR Intact with asbestos. All of this bioshield will be removed, Removal Preparations over the including the primary piping, and disposed at a licensed 1st half of 2023 facility. Further, hazardous materials will be abated The waste generated in during this activity November will be disposed within 90 days of generation NLT Jan 2023 B. Changes to Table 41, EVESR Schedule:

Description The forecast completion date for planning activities and D & D activities have been updated.

Activity Start Completion Planning: November June 2027 Development/submittal of this LPSDAR 2023 Development of specifications, Request for Proposals (RFPs), receipt and evaluation of proposals and decision making for demolition options for remaining components Polar crane repair/replace evaluation Development of plans and procedures for execution of decommissioning activities 1

Enclosure 1 to GEH Letter M220157 Changes to the Vallecitos Nuclear Center Limited Post Shutdown Decommissioning Activities Report Characterization of remaining components Dismantlement & Decontamination March 2024 April 2030 Polar Crane repair/replacement Hazardous materials abatement Removal of EVESR Vessel, internals and interferences through either segmentation or intact removal and disposal Removal of remaining SSCs including miscellaneous piping, vessels, valves, and tanks Concrete demolition to below DCGLs including activated portions of bioshield and other facilities within the 300 licensed Area Removal of any impacted soils as required Removal of any miscellaneous components as necessary to facilitate license termination C. Additional Content Changes:

Description Section 4.1.3, last sentence on Pg 19 currently reads: Separate FSS Plans will be developed for VBWR and EVESR, reflecting the different completion dates.

Because the residual contamination in the VBWR will be transferred to the EVESR license this sentence is replaced with: An FSS Plan will be developed for both the VBWR and the EVESR facilities with a completion date supporting the final license termination date of the EVESR license.

Description Section 4.1.3, last paragraph currently reads: The VBWR FSS will verify that any residual radioactive material will not pose a potential radiation dose to workers or public in excess of the 10 CFR 20, Subpart E, decommissioning dose criterion of 25 mrem per year, considering that VBWR remains bounded by the 300 Area which falls under the EVESR license.

This sentence is deleted because a separate Final Status Survey (FSS) will not be performed for VBWR.

The FSS will be performed under the EVESR license and will include the VBWR facility.

2