ML22297A091

From kanterella
Jump to navigation Jump to search
Re-Issuance of the Core Operating Limits Report for Reload 23, Cycle 24
ML22297A091
Person / Time
Site: Peach Bottom 
Issue date: 10/20/2022
From: Henry D
Constellation Energy Generation
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML22297A090 List:
References
22-75
Download: ML22297A091 (1)


Text

TS 5.6.5.d CCN 22-75 October 20, 2022 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Unit 2 Subsequent Renewed Facility Operating License No. DPR-44 NRC Docket No. 50-277

Subject:

Re-Issuance of the Core Operating Limits Report for Reload 23, Cycle 24 Enclosed is a copy of Revision 17 of the Core Operating Limits Report (COLR) for Peach Bottom Atomic Power Station (PBAPS) Unit 2 for Reload 23, Cycle 24. This revision incorporates updated power restrictions with a Main Steam Isolation Valve out of service or a Turbine Control Valve and/or Turbine Stop Valve out of service.

This COLR is being submitted to the NRC as required by the PBAPS, Unit 2 Technical Specifications (TS) Section 5.6.5.d.

If you have any questions concerning this letter, please contact the Peach Bottom Regulatory Assurance Manager, Wade Scott at (717) 456-3047.

Respectfully, David A. Henry Site Vice President Peach Bottom Atomic Power Station

Attachment:

Core Operating Limits Report for PBAPS Unit 2, Revision 17 cc:

Regional Administrator, Region I, USNRC (with attachment)

USNRC Senior Resident Inspector, PBAPS (with attachment)

Project Manager - PBAPS, USNRC (with attachment)

W. De Haas, Pennsylvania Bureau of Radiation Protection (with attachment)

S. Seaman, State of Maryland (with attachment)