ML22284A155

From kanterella
Jump to navigation Jump to search
Kairos Power, LLC - Transmittal of Changes to Preliminary Safety Analysis Report Chapters 3, 4, 6, and 14
ML22284A155
Person / Time
Site: Hermes
Issue date: 10/11/2022
From: Hastings P
Kairos Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML22284A154 List:
References
KP-NRC-2210-007
Download: ML22284A155 (2)


Text

KP-NRC-2210-007 October 11, 2022 Docket No. 50-7513 US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Kairos Power LLC Transmittal of Changes to Preliminary Safety Analysis Report Chapters 3, 4, 6, and 14

References:

1. Letter, Kairos Power LLC to Document Control Desk, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 1, September 29, 2022 (ML22272A594)
2. Audit Plan, Nuclear Regulatory Commission, Plan for a General Audit of the Hermes Construction Permit Application, February 10, 2022 (ML22039A336)

In September 2022, Kairos Power submitted Revision 1 of the Preliminary Safety Analysis Report (PSAR)

(Reference 1) as part of the Construction Permit Application (CPA) for the Hermes non-power reactor.

This letter transmits changes to the pages of the PSAR to address NRC feedback in the General Audit (Reference 2). Changes to the pages of the PSAR are provided in Enclosure 1. Kairos Power requests NRC review of these changes as part of the continued review of the Hermes CPA.

If you have any questions or need any additional information, please contact Michael Ellett at ellettmic@kairospower.com or (704) 247-6310 x1368, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on October 11, 2022 Peter Hastings, PE Vice President, Regulatory Affairs and Quality

Enclosure:

Changes to Hermes PSAR Chapters 3, 4, 6, and 14 Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE, Unit A 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211

KP-NRC-2210-007 Page 2 xc (w/enclosure):

William Kennedy, Acting Chief, NRR, Advanced Reactor Licensing Branch Benjamin Beasley, Project Manager, NRR, Advanced Reactor Licensing Branch Samuel Cuadrado de Jesus, Project Manager, NRR, Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR, Advanced Reactor Licensing Branch Matthew Hiser, NRR Advanced Reactor Licensing Branch