ML22244A247
| ML22244A247 | |
| Person / Time | |
|---|---|
| Site: | Hermes File:Kairos Power icon.png |
| Issue date: | 09/01/2022 |
| From: | Hastings P Kairos Power |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML22244A246 | List: |
| References | |
| KP-NRC-2209-002 | |
| Download: ML22244A247 (2) | |
Text
KPNRC2209002
KairosPowerLLC
www.kairospower.com 707WTowerAve,SuiteA 5201HawkingDrSE,UnitA 2115RexfordRd,Suite325 Alameda,CA94501 Albuquerque,NM87106 Charlotte,NC28211
September1,2022 DocketNo.507513
USNuclearRegulatoryCommission ATTN:DocumentControlDesk Washington,DC205550001
Subject:
KairosPowerLLC
TransmittalofChangestoConstructionPermitApplication-KPTR018
References:
- 1. Letter,KairosPowerLLCtoDocumentControlDesk,SubmittalofthePreliminary SafetyAnalysisReportfortheKairosPowerFluorideSaltCooled,HighTemperature NonPowerReactor(Hermes),September29,2021(ML21272A376)
- 2. AuditPlan,NuclearRegulatoryCommission,PlanforanAuditoftheHermes ConstructionPermitPreliminarySafetyAnalysisReportChapters4and13,February 23,2022(ML22041B665)
InSeptember2021,KairosPowersubmittedaPreliminarySafetyAnalysisReport(PSAR)(Reference1)as partoftheConstructionPermitApplication(CPA)fortheHermesnonpowerreactor.Thesubmittal includedaPostulatedEventAnalysisMethodologyTechnicalReport(KPTR018).Thislettertransmits changestothepagesofthePostulatedEventAnalysisMethodologyTechnicalReporttoaddressNRC feedbackreceivedinthePSARChapter4and13Audit(Reference2).Changestothepagesofthe technicalreportareprovidedinEnclosure1.KairosPowerrequestsNRCreviewofthesechangesaspart ofthecontinuedreviewoftheHermesCPA.
Ifyouhaveanyquestionsorneedanyadditionalinformation,pleasecontactDelaneySimmonsat simmons@kairospower.comor(605)8385132,orDarrellGardneratgardner@kairospower.comor (704)7691226.
Ideclareunderpenaltyofperjurythattheforegoingistrueandcorrect.
ExecutedonSeptember1,2022
Sincerely,
PeterHastings,PE VicePresident,RegulatoryAffairsandQuality
Enclosure:
ChangestoPostulatedEventAnalysisMethodologyTechnicalReport(KPTR018)
KPNRC2209002 Page2 xc(w/enclosure):
WilliamKennedy,ActingChief,NRRAdvancedReactorLicensingBranch BenjaminBeasley,ProjectManager,NRRAdvancedReactorLicensingBranch EdwardHelvenston,ProjectManager,NRRAdvancedReactorLicensingBranch SamuelCuadradodeJesus,Project Manager, NRRAdvancedReactorLicensingBranch