ML22238A160
ML22238A160 | |
Person / Time | |
---|---|
Site: | Framatome ANP Richland |
Issue date: | 08/24/2022 |
From: | Deist J Framatome |
To: | Document Control Desk, Office of Nuclear Security and Incident Response, Office of Nuclear Material Safety and Safeguards |
Shared Package | |
ML22238A164 | List: |
References | |
JMD:22:009 | |
Download: ML22238A160 (6) | |
Text
"Ti framatome rD- /Z51 August 24, 2022 JMD:22:009 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Office of Nuclear Security and Incident Response One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738
Subject:
Framatome Richland Facility Emergency Plan Version 16.0 Transmittal to USNRC Headquarters Document Control Desk Gentlemen; Enclosed is a CD-ROM that includes the latest revisions of the Framatome Richland Facility's Emergency Plan (E08-01-1.0), Emergency Plan Implementing Procedures (E08-03-X.XX), and Memoranda of Understanding (E08-04-X.XX). The document number designations "X.XX" are used to encompass all applicable document numbers, e.g. E08-03-1.1, E08-03-2.1, E08-03-3.11, etc. For your convenience, I have enclosed a document summary in hard copy. This summary includes a listing of folders, files, and document numbers and titles that are included on the CD-ROM. An electronic copy of the summary is included in the root directory of the disc.
Please destroy any previous copies of these documents that you still have on file.
10 CFR 70.32(i) requires emergency plan revisions to be furnished to the USN RC within six months after changes are made. On 02/28/2022, the Framatome Richland Emergency Plan (E08-01-1.0) was revised to version 16.0, which is the current revision. A nature of change listing and the electronic signature page is enclosed with this letter. Changes made in version 16.0 do not decrease the effectiveness of the plan.
Therefore, USN RC pre-approval of version 16.0 is not required.
Additional copies are being sent to Framatome Richland's USNRC Project Manager, USNRC Region II,.
and the USNRC Senior Resident Inspector at Columbia Generating Station.
The facility emergency plan, implementing procedures, and memoranda of understanding are proprietary documents and Framatome requests that the NRC handle them as such. There are three implementing procedures that contain security-related sensitive information and should be protected from public disclosure similar to protecting proprietary information. The transmittal letter is not proprietary when the attachments are removed.
If you have questions regarding this transmittal, please contact me at (509) 375-8285 or via email at jeff.deist@framatome.com .
- Very truly yours, Jeffrey M. Deist, Emergency Preparedness Coordinator 1)-ttJS Environment, Health, Safety & Licensing
- J-5/~IJ/
Enclosure A)~{ I:_
Framatoine Inc.
2101 Horn Rapids Road µ,vf S .5 Ri~hland, WA 9;i°354 Tel: (509) *375;8100 www.framai:ome.com
AFFIDAVIT STATE OF WASHINGTON )
ss COUNTY OF BENTON )
Timothy J. Tate, being duly sworn on oath, states as follows:
- 1. I am employed by Framatome Inc. (Framatome) as Manager, Environmental, Health, Safety and Licensi,ng in Richland, Washington. I am responsible for the overall administration of the safety programs at Framatome's Richland, Washington nuclear fuel fabrication fadlity, including regulatory .
licensing and permitting. This affidavit is based on my firsthand, personal knowledge and is submitted in my capacity as Manager, Environmental, Health, Safety and Licensing.
- 2. I am familiar with the content of the attached Facility Emergency Plan, Implementing Procedures, and Memoranda of Understanding. These documents have been classified and designated as "Proprietary" by Framatome in accordance with the document control system and policies established by Framatome for the control and protection of proprietary and confidential information. There are three Implementing Procedures (E08-03-8.8, E08-03-8.9, E08-03-8.10) that contain security-related sensitive information and have been designated as "Security-Related Information - Withhold Under 10CFR2.390".
- 3. Framatome is engaged in the business of designing and manufacturing nuclear fuel assemblies for commercial nuclear reactors. Within the United States, there are two additional firms that design and manufacture nuclear fuel for commercial nuclear reactors and there are several other companies outside of the United States that engage in the same business as Framatome.
Competition among these companies including Framatome is fierce and manufacturing costs of the nuclear fuel are critical to the maintenance of market share and to the growth of market share among utility customers.
Affidavit of Timothy J. Tate Framatome Emergency Plan Page 1 of 3
- 4. The Facility Emergency Plan, Implementing Procedures, and Memoranda of Understanding contain commercial information of a confidential nature that is not available in public sources or available to the public. This information is commercial and confidential because it:
A. Reveals distinguishing aspects of Framatome's business which a competitor within the field of nuclear fuel manufacturing may adapt for their business plans, thereby gaining a competitive advantage to the disadvantage of Framatome.
B. Reveals technical work performed by Framatome which a competitor could readily use without expenditure of funds and replicate this work thereby gaining a competitive advantage to the disadvantage of Framatome.
- 5. Framatome Inc. will suffer considerable competitive harm if the contents of the report are made available to Framatome domestic and international competitors.
Dated this _2_~-- day of August 2022.
Timothy J. Tate Manager, Environmental, Health, Safety and Licensing STATE OF WASHINGTON )
ss COUNTY OF BENTON )
On this 2 :3 day of August, 2022, before me, the undersigned, a Notary Public in and for the State of Washington, duly commissioned and sworn, personally appeared Timothy J. Tate to me known to be the Manager, Environmental, Health, Safety and Licensing of Framatome Inc., the corporation that executed the foregoing instrument, and acknowledged the said instrument to be the free and voluntary act and deed of said corporation, for the uses and purposes therein mentioned, and on oath stated that he is authorized to execute the said instrument.
Affidavit of Timothy J. Tate Framatome Emergency Plan Page 2 of 3
Witness my hand and official seal hereto affixed the day and year first above written.
Katherine Lynn Kerr Notary Public in and for the State of Washington, residing at Benton, Washington.
My Commission Expires: 9/12/2026 j,\. *state of Washin My Appointment Expires 9/12/
Commission Number 203028 Affidavit of Timothy J. Tate Framatome Emergency Plan Page 3 of 3
Framatome Richland Emergency Plan - Document Summary Page 1 of 2 Root Directory Filename Descri tion Document Summa for Transmittal (01,03,04) This document Folder = E0B-01 Emergency Plan Filename Document Title E0B-01-1.0 Folder= E08-03 Implementing Procedures Filename Document Titie E0B-03-1.1 Classifvinq an Emerqency E0B-03-2.1 Protective Action Decisions E0B-03-3.1 Plant Emergency Director E08-03-3.1A Interim Plant Emergency Director E0B-03-3.2 Security Liaison E0B-03-3.3 Process Support Liaison E0B-03-3.4 Accountability Liaison E0B-03-3.5 PERT Liaison E0B-03-3.6 Recorder E0B-03-3.7 Staging Area Supervisor E0B-03-3.8 PERT Incident Commander E0B-03-3.9 Public Information Liaison E0B-03-3.10 Licensinq Liaison E0B-03-3.11 Environmental Safety Liaisons E0B-03-3.12 Central Guard Station Officer E0B-03-3.13 County Emergency Operations Center Liaison E0B-03-3.14 Corporate CAT Liaison E0B-03-4.1 Participant Feedback Form E0B-03-4.2 Incident Notification Worksheet E0B-03-4.4 Incident Notification Worksheet- PERMT E0B-03-4.5 Plant Public Address Emergency Message Format E0B-03-5.1 After Action Report Form E08-03-6.1A Radiological Field Team Procedures - Air Samples E0B-03-6.1 B Radiological Field Team Procedures - Soil Samples E0B-03-6.1 C Radiological Field Team Procedures - Veqetation Samples E0B-03-6.2 Chemical Field Team Procedure E0B-03-6.3 Personnel Monitorinq E0B-03-6.5 Chemical Spill Response Plan E0B-03-6.6 Response to Severe Earthquake E0B-03-6.7 Response to Tornado / High Winds E0B-03-6.8 Response to Volcano Eruption E0B-03-6.9 Response to Severe Floods E0B-03-7.1 Public Information Officer E0B-03-7.2 Assistant Public Information Officer
Framatome Richland Emergency Plan - Document Summary Page 2 of 2 Filename Document Title.
E08-03-7.3 JIC Spokesperson E0S-03-7.4 Media Phone Team E0S-03-7.5 Public Information Phone Team E0S-03-7.6 Rumor Control Team E08-03-7.7 News Team E0S-03-7.8 JIC Secretary and Clerk E08-03-7.9 JIC Outside AQency Representatives E08-03-8.2 Plant Evacuation Procedures - Offsite E08-03-8.3 Plant Evacuation Procedures - Onsite E0S-03-8.4 Plant Evacuation Procedures - Individual Buildings E08-03-8.5 Emergency Equipment Lists E08-03-8.6 Admittance of Essential Personnel through Roadblocks E08-03-8.7 EmerQency Action Guides E0S-03-8.8 Imminent Threats Involving Aircraft E08-03-8.9 Imminent Threats NOT lnvolvinQ Aircraft E08-03-8.10 ChanQes in the National Terrorism Advisory System Threat Level E0S-03-8.11 Response to Offsite Transportation Event E0B-03-8.12 Relocating the Emergency Operations Center E0S-03-8.13 Criticality Alarm for PED E08-03-8.13A Criticality Alarm for IPED on Backshifts, Weekends, Holidays E08-03-8.13B Criticality Alarm for IC Folder= E08-04 Memoranda of Understanding Filename.. Document Title ' ?-
E08-04-1.0 Letters of Agreement E08-04-2.2 Kadlec ReQional Medical Center E0S-04-2.4 US Department of Energy, Richland Operations Office E0S-04-2.5 City of Richland E0S-04-2.7 Richland Police Department E0S-04-2.9 Benton County EmerQency Services E08-04-2.1 0 Enemv Northwest E0S-04-2.11 Franklin County Emergency Management E0S-04-2.12 Richland Fire Department E0S-04-3.1 Perma-Fix Northwest Richland, Incorporated