ML22229A523

From kanterella
Jump to navigation Jump to search
Updated Inspection Plan for River Bend Station (Report 05000458/ 2022005)
ML22229A523
Person / Time
Site: Sterling
Issue date: 08/18/2022
From: Jeffrey Josey
NRC/RGN-IV/DORS/PBC
To: Karenina Scott
Entergy Operations
Josey J
References
IR 2022005
Download: ML22229A523 (6)


Text

August 18, 2022 Mr. Kent Scott, Site Vice President Entergy Operations, Inc.

River Bend Station 5485 U.S. Highway 61N St. Francisville, LA 70775

SUBJECT:

UPDATED INSPECTION PLAN FOR RIVER BEND STATION (Report 05000458/2022005)

Dear Mr. Scott:

The enclosed inspection plan lists the inspections scheduled through June 30, 2024, for River Bend Station. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

Beginning on January 1, 2023, the engineering inspection frequency will transition from a triennial (3-year) to a quadrennial (4-year) cycle. The new engineering inspection program will consist of a Comprehensive Engineering Team Inspection (CETI)1 and three Focused Engineering Inspections (FEIs) that will be performed in each quadrennial cycle. For the cycle beginning in 2023, the FEIs will be: Fire Protection Team Inspection, Commercial Grade Dedication and an engineering inspection that reviews age-related degradation and management2.

In response to the COVID-19 public health emergency (PHE), the NRC adjusted inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. While the PHE continues, overall conditions throughout the country support performance of our inspection and oversight activities to return to normal onsite presence by our resident and region-based inspectors and completion of nominal baseline inspection samples. We continue to monitor site-specific conditions and as discussed in our November 2, 2021, memo Implementation of Inspection Programs Following Re-Entry from the PHE for the Reactor Safety Program (ML21295A302), it may be necessary to alter how and when we perform our inspection and oversight activities as we balance the importance of protecting the health and safety of our staff with the need to conduct effective oversight that supports the NRCs critical safety mission.

1 Aspects of the Design Basis Assurance Inspection (DBAI), Evaluations of Changes, Tests, & Experiments, and Heat Sink inspections will be included in the CETI inspection. Attached Report 22 will reference DBAI procedure until the CETI procedure is made publicly available. Previously scheduled Evaluation of Changes, Tests, & Experiments and Heat Sink inspections have been cancelled and removed from attached Report 22.

2 The age-related degradation and management procedure is under development and will be publicly available by the end of calendar year 2022.

K. Scott 2 For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here: https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.

Between October 1, 2020, and September 30, 2021, the NRC issued three Severity Level III traditional enforcement violations associated with willfulness. The Regional Administrator has previously authorized follow-up inspection to be performed using Inspection Procedure 92722, Follow-Up Inspection for Any Severity Level I or II Traditional Enforcement Violation or for Two or More Severity Level III Traditional Enforcement Violations in a 12-Month Period, to follow-up on these violations. This inspection will be scheduled when you notify the NRC of your readiness.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 817-200-1239 with any questions you have regarding this letter.

Sincerely, Signed by Josey, Jeffrey on 08/18/22 Jeffrey E. Josey, Chief Projects Branch C Division of Operating Reactor Safety Docket No. 05000458 License No. NPF-47

Enclosure:

Inspection Plan Distribution:

cc w/ encl: Distribution via LISTSERV

ML22229A523 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: haf Yes No Publicly Available Sensitive NRC-002 OFFICE SPE:DORS/C BC:DORS/C NAME HFreeman /RA/ JJosey DATE 8/18/2022 8/18/2022 Site Inspection Activity Plan 07200049 - River Bend (ISFSI) 07/01/2022 - 06/30/2024 Unit Start End Activity CAC Title Staff Count River Bend ISFSI Triennial Loading Inspection (1 week in July)(Part 72) 2 7/18/2022 8/12/2022 IP 60855 001001 Operation Of An ISFSI RB ISFSI Concrete Pad Inspection (Part 72)(One week in the month) 2 6/1/2023 6/30/2023 IP 60853 000999 On-Site Fabrication Of Components And Construction On An ISFSI Prepared on 8/16/2022 11:55:37 AM 1 of 3

Site Inspection Activity Plan River Bend 07/01/2022 - 06/30/2024 Unit Start End Activity CAC Title Staff Count River Bend ISFSI Triennial Loading Inspection (Part 50) Feeder for Residents 2 1 7/25/2022 7/26/2022 IP 60855 001001 Operation Of An ISFSI RBS 2022 BRQ 3 1 8/28/2022 9/3/2022 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Security Training/Equip Maint .07 and .04 2 1 7/5/2022 10/14/2022 IP 71151 001338 Performance Indicator Verification 1 8/29/2022 9/2/2022 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1 8/29/2022 9/2/2022 IP 71130.07 000739 Security Training Fire Protection Inspection - RBS 3 1 10/17/2022 10/21/2022 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI) 1 10/31/2022 11/4/2022 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

EP 2022 Biennial Exercise & PI Inspection - RBS 5 1 10/17/2022 10/21/2022 IP 71114.01 000716 Exercise Evaluation 1 10/17/2022 10/21/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1 10/17/2022 10/21/2022 IP 71151 001397 Performance Indicator Verification RP 1,4,PI - RBS 2 1 11/14/2022 11/18/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 11/14/2022 11/18/2022 IP 71124.04 000728 Occupational Dose Assessment RBS 2022 INITIAL EXAM 5 1 10/30/2022 11/5/2022 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV) 1 12/4/2022 12/10/2022 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

Resident Baseline Inspection 1Q 2023 - RBS 2 1 1/1/2023 3/31/2023 IP 71152A 001792 Annual Follow-up Problem Identification and Resolution 1 1/1/2023 3/31/2023 IP 71153 001341 Follow Up of Events and Notices of Enforcement Discretion License Renewal Inspection 71003 (Phase 1) - RBS 2 1 2/27/2023 3/3/2023 IP 71003 000687 Post-Approval Site Inspection for License Renewal Inservice Inspection RFO 22 - RBS 1 1 2/27/2023 3/3/2023 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

RP 1,3,PI - 2 1 2/27/2023 3/3/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 2/27/2023 3/3/2023 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation Security Protective Strategy .05 (Place Holder) 2 Prepared on 8/16/2022 11:55:37 AM 2 of 3

Site Inspection Activity Plan 1 4/24/2023 4/28/2023 IP 71130.05 000737 Protective Strategy Evaluation Cyber Security Inspection - RBS 4 1 5/15/2023 5/19/2023 IP 71130.10 000741 Cybersecurity Security Access Authorization .01 and Access Control .02 + PIV + Plan Change .09 2 1 6/26/2023 6/30/2023 IP 71130.01 000733 Access Authorization 1 6/26/2023 6/30/2023 IP 71130.02 000734 Access Control 1 6/26/2023 6/30/2023 IP 71130.09 001656 Security Plan Changes 1 6/26/2023 6/30/2023 IP 71151 001338 Performance Indicator Verification Comprehensive Engineering Team Inspection - 21M - River Bend Station 7 1 7/17/2023 7/21/2023 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams) 1 7/31/2023 8/4/2023 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

RP 5,8 - 2 1 7/24/2023 7/28/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation 1 7/24/2023 7/28/2023 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Security FFD .08 1 1 8/7/2023 8/11/2023 IP 71130.08 000740 Fitness For Duty Program EP 2023 Program & PI Inspection - RBS 1 1 8/14/2023 8/18/2023 IP 71114.02 000717 Alert and Notification System Testing 1 8/14/2023 8/18/2023 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1 8/14/2023 8/18/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1 8/14/2023 8/18/2023 IP 71114.05 000720 Maintenance of Emergency Preparedness 1 8/14/2023 8/18/2023 IP 71151 001397 Performance Indicator Verification River Bend Station Biennial PI&R 4 1 10/16/2023 10/20/2023 IP 71152B 000747 Problem Identification and Resolution 1 10/30/2023 11/3/2023 IP 71152B 000747 Problem Identification and Resolution RBS 2023 INIT EXAM 2 1 10/8/2023 10/14/2023 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV) 1 11/12/2023 11/18/2023 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

RP 1,4,PI 2 1 1/29/2024 2/2/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 1/29/2024 2/2/2024 IP 71124.04 000728 Occupational Dose Assessment EP Exercise & PI Inspection (2024) - RBS 4 1 6/24/2024 6/28/2024 IP 71114.01 000716 Exercise Evaluation 1 6/24/2024 6/28/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1 6/24/2024 6/28/2024 IP 71151 001397 Performance Indicator Verification Prepared on 8/16/2022 11:55:37 AM 3 of 3