PMNS20220799, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Extend the Completion Time for an Inoperable Reactor Trip Breaker for the Turkey Point Generating, Unit Nos. 3 and
Letter Sequence Meeting | |
---|---|
EPID:L-2022-LRM-0061, (Open) | |
MONTHYEARPMNS20220799, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Extend the Completion Time for an Inoperable Reactor Trip Breaker for the Turkey Point Generating, Unit Nos. 3 and2022-08-16016 August 2022
[Table View]Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Extend the Completion Time for an Inoperable Reactor Trip Breaker for the Turkey Point Generating, Unit Nos. 3 and 4 Project stage: Meeting ML22227A1302022-08-17017 August 2022 License Amendment Request Reactor Trip Breaker Completion Time Extension - Public Meeting August 17, 2022 (EPID L-2022-LRM-0061) (Slides) Project stage: Meeting ML22238A2762022-08-29029 August 2022 Summary of August 17, 2022, Meeting with Florida Power and Light/Nextera to Discuss a Turkey Point Planned License Amendment Request to Extend the Completion Time for an Inoperable Reactor Trip Breaker Project stage: Meeting 2022-08-17 |
ML22228A025 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 08/16/2022 |
From: | Office of Nuclear Reactor Regulation |
To: | |
References | |
PMNS20220799 | |
Download: ML22228A025 (3) | |
Similar Documents at Turkey Point | |
---|---|
Category:Meeting Notice
MONTHYEARPMNS20240533, Plants - 2023 Annual Assessment Meeting2024-04-12012 April 2024
[Table view]Plants - 2023 Annual Assessment Meeting PMNS20240303, Notice of Meeting with NextEra Energy/Florida Power & Light Regarding License Amendment Request to Create a Fleet Emergency Plan2024-03-0606 March 2024 Notice of Meeting with NextEra Energy/Florida Power & Light Regarding License Amendment Request to Create a Fleet Emergency Plan PMNS20230969, Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement2023-09-0707 September 2023 Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement PMNS20230973, Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement2023-09-0707 September 2023 Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement PMNS20230932, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-08-14014 August 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230879, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-08-0101 August 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230809, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-07-11011 July 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230775, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-06-30030 June 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230732, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle for Turkey Point Generating Unit Nos. 3 and 42023-06-26026 June 2023 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle for Turkey Point Generating Unit Nos. 3 and 4 PMNS20230718, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-06-12012 June 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230673, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-05-26026 May 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230599, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-05-15015 May 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230594, Annual Assessment Meeting2023-05-0404 May 2023 Annual Assessment Meeting PMNS20230447, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-04-20020 April 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230449, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-18018 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230409, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-11011 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230253, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-04-0707 April 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230278, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-0303 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230308, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-03-27027 March 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230226, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-03-0707 March 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230223, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-03-0606 March 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230192, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-03-0101 March 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230168, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-02-22022 February 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230134, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-02-22022 February 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230159, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-02-15015 February 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230049, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-01-27027 January 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230080, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-26026 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230060, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-18018 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230003, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-0505 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20221243, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 32022-12-0202 December 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and PMNS20221177, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle Turkey Point Generating Unit Nos. 3 and 42022-11-22022 November 2022 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle Turkey Point Generating Unit Nos. 3 and 4 PMNS20221132, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-31031 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20221080, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-17017 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20221057, Meeting Between the U.S. Nuclear Regulatory Commission and Florida Power & Light Company to Discuss Review of Digital Instrumentation and Controls License Amendment Requests for Turkey Point Nuclear Generating, Units 3 and 42022-10-11011 October 2022 Meeting Between the U.S. Nuclear Regulatory Commission and Florida Power & Light Company to Discuss Review of Digital Instrumentation and Controls License Amendment Requests for Turkey Point Nuclear Generating, Units 3 and 4 PMNS20220997, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-0303 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20220876, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Review of Defense-in-Depth and Diversity (D3) Evaluation for Turkey Point Nuclear Generating, Units 3 and 4 (Turkey Point)2022-09-22022 September 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Review of Defense-in-Depth and Diversity (D3) Evaluation for Turkey Point Nuclear Generating, Units 3 and 4 (Turkey Point) PMNS20220998, Notice of Meeting with Florida Power and Light Company (FPL) Regarding Turkey Point Setpoint Methodologies as It Relates to the Improved Technical Specification (ITS) Conversion License Amendment Request2022-09-22022 September 2022 Notice of Meeting with Florida Power and Light Company (FPL) Regarding Turkey Point Setpoint Methodologies as It Relates to the Improved Technical Specification (ITS) Conversion License Amendment Request PMNS20220935, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-09-0909 September 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests PMNS20220930, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Acceptance Review of the Turkey Point Digital Instrumentation and Controls License Amendment Request2022-09-0808 September 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Acceptance Review of the Turkey Point Digital Instrumentation and Controls License Amendment Request PMNS20220832, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-08-16016 August 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests PMNS20220799, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Extend the Completion Time for an Inoperable Reactor Trip Breaker for the Turkey Point Generating, Unit Nos. 3 and2022-08-16016 August 2022 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Extend the Completion Time for an Inoperable Reactor Trip Breaker for the Turkey Point Generating, Unit Nos. 3 and 4 PMNS20220748, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-08-0303 August 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests PMNS20220701, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-07-14014 July 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request PMNS20220683, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-06-28028 June 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request PMNS20220609, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-06-14014 June 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request PMNS20220582, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 42022-06-10010 June 2022 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 4 PMNS20220592, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-06-0606 June 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request PMNS20220454, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-05-17017 May 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request PMNS20220478, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 42022-05-11011 May 2022 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 4 PMNS20220468, Notice of Meeting with NextEra Energy Llc/Florida Power & Light Company2022-05-0404 May 2022 Notice of Meeting with NextEra Energy Llc/Florida Power & Light Company 2024-04-12 Category:Meeting Agenda MONTHYEARPMNS20240533, Plants - 2023 Annual Assessment Meeting2024-04-12012 April 2024
[Table view]Plants - 2023 Annual Assessment Meeting ML24073A3372024-03-13013 March 2024 NextEra - NRC Slides for the Public Meeting on March 19, 2024 Regarding Emergency Plan Licensing Amendment PMNS20240303, Notice of Meeting with NextEra Energy/Florida Power & Light Regarding License Amendment Request to Create a Fleet Emergency Plan2024-03-0606 March 2024 Notice of Meeting with NextEra Energy/Florida Power & Light Regarding License Amendment Request to Create a Fleet Emergency Plan PMNS20230969, Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement2023-09-0707 September 2023 Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement PMNS20230973, Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement2023-09-0707 September 2023 Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement PMNS20230932, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-08-14014 August 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230879, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-08-0101 August 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230809, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-07-11011 July 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230775, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-06-30030 June 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230732, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle for Turkey Point Generating Unit Nos. 3 and 42023-06-26026 June 2023 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle for Turkey Point Generating Unit Nos. 3 and 4 PMNS20230718, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-06-12012 June 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230673, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-05-26026 May 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230599, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-05-15015 May 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230594, Annual Assessment Meeting2023-05-0404 May 2023 Annual Assessment Meeting PMNS20230447, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-04-20020 April 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230449, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-18018 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230409, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-11011 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230253, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-04-0707 April 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230278, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-0303 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230308, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-03-27027 March 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230226, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-03-0707 March 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230223, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-03-0606 March 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230192, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-03-0101 March 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230168, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-02-22022 February 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230134, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-02-22022 February 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230159, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-02-15015 February 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230049, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-01-27027 January 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230080, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-26026 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230060, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-18018 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230003, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-0505 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20221243, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 32022-12-0202 December 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and PMNS20221177, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle Turkey Point Generating Unit Nos. 3 and 42022-11-22022 November 2022 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle Turkey Point Generating Unit Nos. 3 and 4 PMNS20221132, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-31031 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20221080, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-17017 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20221057, Meeting Between the U.S. Nuclear Regulatory Commission and Florida Power & Light Company to Discuss Review of Digital Instrumentation and Controls License Amendment Requests for Turkey Point Nuclear Generating, Units 3 and 42022-10-11011 October 2022 Meeting Between the U.S. Nuclear Regulatory Commission and Florida Power & Light Company to Discuss Review of Digital Instrumentation and Controls License Amendment Requests for Turkey Point Nuclear Generating, Units 3 and 4 PMNS20220997, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-0303 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20220998, Notice of Meeting with Florida Power and Light Company (FPL) Regarding Turkey Point Setpoint Methodologies as It Relates to the Improved Technical Specification (ITS) Conversion License Amendment Request2022-09-22022 September 2022 Notice of Meeting with Florida Power and Light Company (FPL) Regarding Turkey Point Setpoint Methodologies as It Relates to the Improved Technical Specification (ITS) Conversion License Amendment Request PMNS20220876, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Review of Defense-in-Depth and Diversity (D3) Evaluation for Turkey Point Nuclear Generating, Units 3 and 4 (Turkey Point)2022-09-22022 September 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Review of Defense-in-Depth and Diversity (D3) Evaluation for Turkey Point Nuclear Generating, Units 3 and 4 (Turkey Point) PMNS20220935, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-09-0909 September 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests PMNS20220930, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Acceptance Review of the Turkey Point Digital Instrumentation and Controls License Amendment Request2022-09-0808 September 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Acceptance Review of the Turkey Point Digital Instrumentation and Controls License Amendment Request ML22227A1302022-08-17017 August 2022 License Amendment Request Reactor Trip Breaker Completion Time Extension - Public Meeting August 17, 2022 (EPID L-2022-LRM-0061) (Slides) PMNS20220799, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Extend the Completion Time for an Inoperable Reactor Trip Breaker for the Turkey Point Generating, Unit Nos. 3 and2022-08-16016 August 2022 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Extend the Completion Time for an Inoperable Reactor Trip Breaker for the Turkey Point Generating, Unit Nos. 3 and 4 PMNS20220832, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-08-16016 August 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests PMNS20220748, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-08-0303 August 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests PMNS20220701, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-07-14014 July 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request PMNS20220683, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-06-28028 June 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request ML22172A2172022-06-22022 June 2022 LAR: Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary) PMNS20220609, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-06-14014 June 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request PMNS20220582, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 42022-06-10010 June 2022 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 4 PMNS20220592, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-06-0606 June 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request 2024-04-12 |
Text
August 04, 2022
Title:
Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to extend the Completion Time for an inoperable Reactor Trip Breaker for the Turkey Point Generating, Unit Nos. 3 and 4.
Date(s) and Time(s): August 17, 2022, 01:00 PM to 02:30 PM ET Location: Webinar Category: This is an Observation Meeting. This is a meeting in which attendees will have an opportunity to observe the NRC performing its regulatory function or discussing regulatory issues. Attendees will have an opportunity to ask questions of the NRC staff or make comments about the issues discussed following the business portion of the meeting; however, the NRC is not actively soliciting comments towards regulatory decisions at this meeting.
Purpose:
NextEra Energy/Florida Power & Light Company (NextEra/FPL) and the U.S. Nuclear Regulatory Commission (NRC) will discuss the planned license amendment request to extend the completion time for an inoperable Reactor Trip Breaker for the Turkey Point Generating, Unit Nos. 3 and 4.
Contact:
Michael Mahoney 301-415-3867 Michael.Mahoney@nrc.gov
Participants:
NRC External Office of Nuclear Reactor Regulation NextEra Energy, FPL Bridge Number Conference ID Pass Code Teleconference:
(301) 576-2978 N/A 408698969#
URL Meeting Number Password Webinar:
https://teams.microsoft.com/l/meetup- 228 638 522 27 UcyFKF join/19%
3ameeting_NGJmNjk0ZjYtZmVhNi00ZDE0 LWE4ODQtYjRlOGZjZjhmYWU1%
40thread.v2/0?context=%7b%22Tid%22%
3a%22e8d01475-c3b5-436a-a065-5def4c64f52e%22%2c%22Oid%22%3a%
22681bf4ab-0620-4039-a625-9b43f7210f36%22%7d Docket No: 05000250 05000251 Comments: Please contact the meeting point of contact for meeting details.
The NRC provides reasonable accommodations to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in a meeting or need a meeting notice or the transcript or other information from a meeting in another format (e.g. braille, large print), please contact Anne Silk, NRC Reasonable Accommodations Coordinator, at Anne.Silk@nrc.gov or call directly at 301-287-0745.
Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Ten (10) days advance notice is requested to try to ensure availability; however, every effort will be made to address a request for reasonable accommodations with less notice.
PUBLIC MEETING AGENDA
Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to extend the Completion Time for an inoperable Reactor Trip Breaker for the Turkey Point Generating, Unit Nos. 3 and 4.
August 17, 2022, 01:00 PM to 02:30 PM ET Webinar
ADAMS Accession Number: ML22228A025 Distribution:
Office NRR/DORL NRR/DORL NRR/DORL Name DWrona RButler MMahoney Date 08/04/2022 08/04/2022 08/04/2022 OFFICIAL RECORD COPY Link to meeting details: https://www.nrc.gov/pmns/mtg?do=details&Code=20220799 Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" 86 FR 14964, March 19, 2021 ADAMS No. ML21050A046 https://www.nrc.gov/reading-rm/doc-collections/commission/policy/index.html