ML22224A199

From kanterella
Jump to navigation Jump to search
Kairos Power, LLC - Transmittal of Changes to Construction Permit Application - KP-TR-018 and PSAR Chapter 13
Date released: 08/15/2022 Download: ML22224A199


Enclosure 2: Changes to Preliminary Safety Analysis Report Chapter 13
ML22224A202
Person / Time
Site: Hermes File:Kairos Power icon.png
Issue date: 08/12/2022
From:
Kairos Power
To:
Office of Nuclear Reactor Regulation
References
KP-NRC-2208-003
Download: ML22224A202 (1)
Enclosure 1: Changes to Postulated Event Analysis Methodology Technical Report (KP-TR-018)
ML22224A201
Person / Time
Site: Hermes File:Kairos Power icon.png
Issue date: 08/12/2022
From:
Kairos Power
To:
Office of Nuclear Reactor Regulation
References
KP‐TR‐018‐NP, Rev. 0
Download: ML22224A201 (14)
Kairos Power, LLC - Transmittal of Changes to Construction Permit Application - KP-TR-018 and PSAR Chapter 13
ML22224A200
Person / Time
Site: Hermes File:Kairos Power icon.png
Issue date: 08/12/2022
From: Hastings P
Kairos Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
KP-NRC-2208-003
Download: ML22224A200 (4)