ENCLOSURE 3
SUMMARY
OF CH ANGES T O SAFETY ANALYSIS RE PORT F OR P ACKAGING:
THE O RNL H FIR UNIRRADIATED FUEL E LEMENT S HIPPING CONTAINER, ORNL/TM-11656 Enclosure 3: Revision 14 SAR Changes Summary of Volume I Changes SAR Location Change Reason for Change Cover page and List of The LOEP is being updated as appropriate to reflect the Editorial change reflecting latest revision.
Effective Pages (LOEP) changes described below.
Revision Log Updated for Rev. 14. Editorial change explaining scope of Rev. 14.
Section 1.2.1.1, first This section was updated to provide a brief discussion It is desired to eventually install combs at the fuel element paragraph on the use of fuel element combs. manufacturer, thus requiring the elements with combs to be shipped in fresh fuel shipping containers.
Chapter 1 Figures The drawings provided as Figures 1.3, The tie down b ands are not credited or an alyzed in the fresh fuel 1.4, and 1.5 were updated to remove the tie down band. SAR and are not integ ral to the package and therefore will n ot be included in th e c ertification drawings.
Chapter 1 Figures The drawings provided as Figures 1.7 and 1.8 were Revision 5 of the subject drawings depict and provides details on updated to Rev. 5. fuel element combs.
Summary of Volume II Changes SAR Location Change Reason for Change Cover page, List of
- Updated fore
- Editorial changes reflecting latest revision.
Effective Pages (LOEP),
- The Summary of Revision Changes page was* The Summary of Revision Changes o nly refers the reader to and Summary of Revision revised to remove the specific revision level. Vol. 1 for information on the changes made in the latest Changes revision. It is therefo re unnecessary to update this page every time Vol. 2 of the SAR is revised.
Section 7.1, #11 New ORNL drawing M-20978-EL-008B, Shipping Added fo r referen ce since the TDB details were removed from Container Tie Down Band For Unirradiated Out/In the SAR figures in Chapter 1.
HFIR Element Details, was added in the text where the TDB (referred to as a removable shoring ring) is discussed.
Section 8.2, second Clarified that the containers are inspected for legibility Clarification to align with changes to Section 8.2.7.
paragraph of labels and markings.
Section 8.2.7 Revised this section to remove the 3-year periodic The containers are inspected prior to each shipment per an RRD inspection/repainting of the containers. internal procedure for excessive wear, water damage, surface contamination, correct installation of hardware, etc. The 3 -year periodic inspection was added in 1989 following discovery that an unauthorized modification had been made to one or more of the containers. A periodic detailed as -built inspection of the containers per the drawings is no longer warranted because : 1) it is not required by the regulations, 2) over the past thirty years no additional unauthorized modifications have been identified, and 3) adequate controls are in place through the ORNL and RRD work control processes to prevent future unauthorized modifications.
Section 9.3.11.2, first Deleted the first two sentences of this section to The containers are inspected prior to each shipment per an RRD paragraph remove the periodic inspection/repainting of the internal procedure for excessive wear, water damage, surface containers. contamination, correct installation of hardware, etc. A periodic detailed as-built inspection of the containers per the drawings is not warranted for the reasons stated above.