Category:License-Operator
MONTHYEARML24149A3122024-05-0707 May 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Final ML24149A2932024-05-0707 May 2024 Ile Form 2.3-1 Examination Outline Quality Checklist ML24149A3862024-04-19019 April 2024 Ile Form 2.1-1 Examination Preparation Checklist ML24149A3852024-04-19019 April 2024 Ile Form 1.3-1 Exam Security Agreement BW240018, Ile Post-Exam Submittal Letter2024-04-0505 April 2024 Ile Post-Exam Submittal Letter ML24149A3472024-03-14014 March 2024 Ile Proposed Exam Submittal Letter ML24149A3442024-03-14014 March 2024 Ile Form 2.3-2 Operating Test Quality Checklist ML24149A3452024-03-14014 March 2024 Ile Form 2.3-4 Written Exam Quality Checklist ML24066A0122024-03-0606 March 2024 Operator Licensing Examination Approval Braidwood Station, Units 1 and 2, March 2024 ML24149A2562023-10-27027 October 2023 Ile Proposed Outline Submittal Letter ML23234A2462023-08-25025 August 2023 Confirmation of Initial License Examination ML23191A8442023-07-10010 July 2023 05000456; 05000457 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22199A1842022-04-0505 April 2022 Outline Recommendations-Submittal Comments ML22199A1732022-04-0505 April 2022 Ile ES-201-3 Security Agreement-Final ML22199A1742022-04-0505 April 2022 Ile ES-403-1 Written Exam Grading Quality Checklist ML22199A1812022-04-0505 April 2022 Ile ES-401-9 Written Examination Review Worksheet ML22199A1702022-04-0505 April 2022 Ile ES-201-1 Examination Prep Checklist ML22199A1792022-04-0505 April 2022 Ile ES-401-4 Rejected KAs ML22199A1762022-04-0505 April 2022 Ile ES-301-7 Operating Test Review Worksheet BW220023, Ile Post-Examination Submittal Letter (03/30/2022)2022-03-30030 March 2022 Ile Post-Examination Submittal Letter (03/30/2022) RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22199A1852022-03-18018 March 2022 Ile Administered RO and SRO Admin Topics JPMs-FINAL ML22199A1912022-03-18018 March 2022 Ile Administered RO and SRO List of Reference Handouts-FINAL ML22199A1902022-03-18018 March 2022 Ile Administered Written Examination-FINAL ML22199A1892022-03-18018 March 2022 Ile Administered Simulator Scenarios-FINAL ML22199A1872022-03-18018 March 2022 Ile Administered Sim and Inplant System JPMs-FINAL ML22053A0692022-02-23023 February 2022 Operator Licensing Examination Approval ML22199A2532022-02-22022 February 2022 Ile ES-301-5 Transient and Event Checklists ML22199A2472022-02-22022 February 2022 Ile ES-201-2 NRC-Developed Outline Quality Checklist-Signed ML22199A2632022-02-22022 February 2022 Ile ES-301-1 Admin Topics Outlines ML22199A2702022-02-22022 February 2022 Ile ES-401-2 and ES-401-3 Written Exam Outlines-Final ML22199A2692022-02-22022 February 2022 Ile ES-301-2 Sim and Inplant System JPM Outlines ML22199A2712022-02-22022 February 2022 Ile ES-D-1s Simulator Scenario Outlines ML22199A2302022-02-18018 February 2022 ES-301-6 Competencies Checklists ML22199A2382022-02-18018 February 2022 Ile Proposed Sim and Inplant System JPMs-FINAL ML22199A2402022-02-18018 February 2022 Ile Proposed Written Examination-FINAL ML22199A2362022-02-18018 February 2022 Ile Proposed RO and SRO Admin Topic JPMs-FINAL ML22199A2272022-02-18018 February 2022 ES-301-3 and ES-301-4 Op Test Quality Checklists ML22199A2392022-02-18018 February 2022 Ile Proposed Simulator Scenarios-FINAL ML22199A2342022-02-18018 February 2022 ES-401-6 Written Exam Quality Checklist ML21224A2432021-08-17017 August 2021 Confirmation of Initial License Examination ML21110A4952021-04-19019 April 2021 GFE Results, March 2021 ML22173A2282020-07-17017 July 2020 Bwd 2020 Ile ES-201-1 Rev 11-Final ML22173A2392020-07-17017 July 2020 Bwd 2020 Ile Outline Comments ML22173A2302020-07-17017 July 2020 Bwd 2020 Ile Es 403-1 Signed ML22173A2332020-07-17017 July 2020 Bwd 2020 Ile ES-301-7 Operating Test Review Comments ML22173A2292020-07-17017 July 2020 Bwd 2020 Ile Es 201-3 Final ML22173A2352020-07-17017 July 2020 Bwd 2020 Ile ES-401-4 Record of Rejected KAs Rev 11 ML22173A2372020-07-17017 July 2020 Bwd 2020 Ile ES-401-9 Written Exam Comments-Final 2024-05-07
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24149A3122024-05-0707 May 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Final ML24149A2932024-05-0707 May 2024 Ile Form 2.3-1 Examination Outline Quality Checklist ML24149A3852024-04-19019 April 2024 Ile Form 1.3-1 Exam Security Agreement ML24149A3862024-04-19019 April 2024 Ile Form 2.1-1 Examination Preparation Checklist BW240018, Ile Post-Exam Submittal Letter2024-04-0505 April 2024 Ile Post-Exam Submittal Letter ML24149A3472024-03-14014 March 2024 Ile Proposed Exam Submittal Letter ML24149A3442024-03-14014 March 2024 Ile Form 2.3-2 Operating Test Quality Checklist ML24149A3452024-03-14014 March 2024 Ile Form 2.3-4 Written Exam Quality Checklist ML24066A0122024-03-0606 March 2024 Operator Licensing Examination Approval Braidwood Station, Units 1 and 2, March 2024 ML24149A2562023-10-27027 October 2023 Ile Proposed Outline Submittal Letter ML23234A2462023-08-25025 August 2023 Confirmation of Initial License Examination RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22199A1812022-04-0505 April 2022 Ile ES-401-9 Written Examination Review Worksheet ML22199A1742022-04-0505 April 2022 Ile ES-403-1 Written Exam Grading Quality Checklist ML22199A1732022-04-0505 April 2022 Ile ES-201-3 Security Agreement-Final ML22199A1702022-04-0505 April 2022 Ile ES-201-1 Examination Prep Checklist ML22199A1762022-04-0505 April 2022 Ile ES-301-7 Operating Test Review Worksheet ML22199A1792022-04-0505 April 2022 Ile ES-401-4 Rejected KAs ML22199A1842022-04-0505 April 2022 Outline Recommendations-Submittal Comments BW220023, Ile Post-Examination Submittal Letter (03/30/2022)2022-03-30030 March 2022 Ile Post-Examination Submittal Letter (03/30/2022) RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22199A1912022-03-18018 March 2022 Ile Administered RO and SRO List of Reference Handouts-FINAL ML22199A1852022-03-18018 March 2022 Ile Administered RO and SRO Admin Topics JPMs-FINAL ML22199A1872022-03-18018 March 2022 Ile Administered Sim and Inplant System JPMs-FINAL ML22199A1892022-03-18018 March 2022 Ile Administered Simulator Scenarios-FINAL ML22199A1902022-03-18018 March 2022 Ile Administered Written Examination-FINAL ML22053A0692022-02-23023 February 2022 Operator Licensing Examination Approval ML22199A2692022-02-22022 February 2022 Ile ES-301-2 Sim and Inplant System JPM Outlines ML22199A2702022-02-22022 February 2022 Ile ES-401-2 and ES-401-3 Written Exam Outlines-Final ML22199A2532022-02-22022 February 2022 Ile ES-301-5 Transient and Event Checklists ML22199A2632022-02-22022 February 2022 Ile ES-301-1 Admin Topics Outlines ML22199A2472022-02-22022 February 2022 Ile ES-201-2 NRC-Developed Outline Quality Checklist-Signed ML22199A2712022-02-22022 February 2022 Ile ES-D-1s Simulator Scenario Outlines ML22199A2302022-02-18018 February 2022 ES-301-6 Competencies Checklists ML22199A2342022-02-18018 February 2022 ES-401-6 Written Exam Quality Checklist ML22199A2392022-02-18018 February 2022 Ile Proposed Simulator Scenarios-FINAL ML22199A2402022-02-18018 February 2022 Ile Proposed Written Examination-FINAL ML22199A2362022-02-18018 February 2022 Ile Proposed RO and SRO Admin Topic JPMs-FINAL ML22199A2382022-02-18018 February 2022 Ile Proposed Sim and Inplant System JPMs-FINAL ML22199A2272022-02-18018 February 2022 ES-301-3 and ES-301-4 Op Test Quality Checklists ML21224A2432021-08-17017 August 2021 Confirmation of Initial License Examination ML22173A2392020-07-17017 July 2020 Bwd 2020 Ile Outline Comments ML22173A2292020-07-17017 July 2020 Bwd 2020 Ile Es 201-3 Final ML22173A2352020-07-17017 July 2020 Bwd 2020 Ile ES-401-4 Record of Rejected KAs Rev 11 ML22173A2332020-07-17017 July 2020 Bwd 2020 Ile ES-301-7 Operating Test Review Comments ML22173A2302020-07-17017 July 2020 Bwd 2020 Ile Es 403-1 Signed ML22173A2282020-07-17017 July 2020 Bwd 2020 Ile ES-201-1 Rev 11-Final ML22173A2372020-07-17017 July 2020 Bwd 2020 Ile ES-401-9 Written Exam Comments-Final BW200057, Bwd 2020 Ile Post-Exam Package Cover2020-06-27027 June 2020 Bwd 2020 Ile Post-Exam Package Cover ML22173A2432020-06-0909 June 2020 Bwd 2020 Ile Administered RO and SRO Admin JPMs-Final 2024-05-07
[Table view] |
Text
ES-301 Simulator Scenario Quality Checklist Form ES-301-4
Facility: Braidwood Date of Exam: 5/29/18 Scenario Numbers: 1/2/3 Operating Test No. :2018
QUALITATIVE ATTRIBUTES Initials a b* cH
- 1. The initial conditions are realistic in that some equipment and/or instrumentation may be out of service, cq ~ M but it does not cue the operators into expected events.
- 2. The scenarios consist mostly of related events. QJ? t?--t~
- 3. Each event description consists of the following:
- the point in the scenario when it is to be initiated 1/2 er ~
- the malfunction(s) or conditions that are entered to initiate the event
- the symptoms/cues that will be visible to the crew
- the expected operator actions (by shift position)
- the event termination point (if applicable)
- 4. The events are valid with regard to physics and thermodynamics. a ti-~
- 5. Sequencing and timing of events is reasonable and allows the examination team to obtain complete ~ ~ ~
evaluation results commensurate with the scenario objectives.
- 6. If time compression techniques are used, the scenario summary clearly so indicates. (1/2 9 ~
Operators have sufficient time to carry out expected activities without undue time constraints.
Cues are given.
- 7. The simulator modeling is not altered. ~ C) ~
- 8. The scenarios have been validated. Pursuant to 10 CFR 55.46(d}, any open simulator performance ct 9-- ~
deficiencies or deviations from the referenced plant have been evaluated to ensure that functional fidelity is maintained while running the planned scenarios.
- 9. Scenarios are new or significantly modified in accordance with.Section D.5 of ES-301. 'cl u ~
- 10. All individual operator competencies can be evaluated, as verified using Form ES-301-6 (submit the d 'ti- ~
form along with the simulator scenarios).
- 11. The scenario set provides the opportunity for each applicant to be evaluated in each of the applicable !~ & ~
rating factors. (Competency rating factors as described on Forms ES-303-1 and ES-303-3.)
- 12. Each applicant will be significantly involved in the minimum number of transients and events specified ~ e-- ~
on Form ES-301-5 (submit the form with the simulator scenarios).
- 13. Applicants are evaluated on a similar number of preidentified critical tasks across scenarios, when ~ Ct) ~
possible.
- 14. The level of difficulty is appropriate to support licensing decisions for each crew position. OJ 0 I~
Target Quantitative Attributes per Scenario (See Section D.5.d) Actual Attributes -- -- --
- 1. Malfunctions after EOP entry (1-2} 2/ 2 /2 ~ t7- ~i':;
- 2. Abnormal events (2-4) 4/ 4 / 4 c:I:), u ~~
- 3. Major transients (1-2) 1/ 2 / 1 ~ V "'e~
- 4. EOPs entered/requiring substantive actions (1-2) 2/ 1 / 2 cg, l7 tr~
- 5. Entry into a contingency EOP with substantive actions (?:. 1 per scenario 1/ 1 /0 9 tr set) ~
- 6. Preidentified critical tasks (> 2) 2/ 2 / 2 c.~ fr i>~
- The facility licensee signature is not applicable for NRG-developed tests.
- An independent NRC reviewer initials items in column "c"; chief examiner concurrence is required.