MONTHYEARML23234A2462023-08-25025 August 2023 Confirmation of Initial License Examination ML23191A8442023-07-10010 July 2023 05000456; 05000457 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22199A1702022-04-0505 April 2022 Ile ES-201-1 Examination Prep Checklist ML22199A1732022-04-0505 April 2022 Ile ES-201-3 Security Agreement-Final ML22199A1742022-04-0505 April 2022 Ile ES-403-1 Written Exam Grading Quality Checklist BW220023, Ile Post-Examination Submittal Letter (03/30/2022)2022-03-30030 March 2022 Ile Post-Examination Submittal Letter (03/30/2022) RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22053A0692022-02-23023 February 2022 Operator Licensing Examination Approval ML22199A2472022-02-22022 February 2022 Ile ES-201-2 NRC-Developed Outline Quality Checklist-Signed ML22199A2532022-02-22022 February 2022 Ile ES-301-5 Transient and Event Checklists ML22199A2302022-02-18018 February 2022 ES-301-6 Competencies Checklists ML22199A2272022-02-18018 February 2022 ES-301-3 and ES-301-4 Op Test Quality Checklists ML22199A2342022-02-18018 February 2022 ES-401-6 Written Exam Quality Checklist ML21224A2432021-08-17017 August 2021 Confirmation of Initial License Examination ML21110A4952021-04-19019 April 2021 GFE Results, March 2021 ML22173A2392020-07-17017 July 2020 Bwd 2020 Ile Outline Comments ML22173A2352020-07-17017 July 2020 Bwd 2020 Ile ES-401-4 Record of Rejected KAs Rev 11 ML22173A2332020-07-17017 July 2020 Bwd 2020 Ile ES-301-7 Operating Test Review Comments ML22173A2292020-07-17017 July 2020 Bwd 2020 Ile Es 201-3 Final ML22173A2302020-07-17017 July 2020 Bwd 2020 Ile Es 403-1 Signed ML22173A2372020-07-17017 July 2020 Bwd 2020 Ile ES-401-9 Written Exam Comments-Final ML22173A2282020-07-17017 July 2020 Bwd 2020 Ile ES-201-1 Rev 11-Final BW200057, Bwd 2020 Ile Post-Exam Package Cover2020-06-27027 June 2020 Bwd 2020 Ile Post-Exam Package Cover ML22173A2432020-06-0909 June 2020 Bwd 2020 Ile Administered RO and SRO Admin JPMs-Final ML22173A2472020-06-0909 June 2020 Bwd 2020 Ile Administered Scenarios-Final ML22173A2462020-06-0909 June 2020 Bwd 2020 Ile Administered System and Inplant JPMs-Final ML22173A2512020-06-0909 June 2020 Bwd 2020 Ile Administered Written Exam with Handout-Final ML20135H2062020-05-14014 May 2020 Operator Licensing Examination Approval ML22173A2582020-03-11011 March 2020 Bwd 2020 Ile Es 401-6 Signed ML22173A2632020-03-11011 March 2020 Bwd 2020 Ile Proposed Simulator Scenarios-Final ML22173A2642020-03-11011 March 2020 Bwd 2020 Ile Proposed Written Exam RO-SRO-Final ML22173A2612020-03-11011 March 2020 Bwd 2020 Ile Proposed RO and SRO Admin JPMs-Final ML22173A2622020-03-11011 March 2020 Bwd 2020 Ile Proposed System and Inplant JPMs-Final ML22173A2572020-03-11011 March 2020 Bwd 2020 Ile ES-301-6 Competencies Checklists ML22173A2562020-03-11011 March 2020 Es 301-4 ML22173A2552020-03-11011 March 2020 Es 301-3 Signed ML22173A2602020-02-20020 February 2020 Bwd 2020 Ile Proposed Written Exam Submittal Letter ML22174A0732019-12-20020 December 2019 Ile ES-D-1s ML22174A0402019-12-20020 December 2019 Ile ES-301-5 Transient and Event Checklists ML22174A0392019-12-20020 December 2019 Ile ES-201-2 Outline Quality Checklist ML22174A0692019-12-20020 December 2019 Ile ES-401-2 and 401-3-Final ML22174A0672019-12-20020 December 2019 Ile RO and SRO ES-301-2 ML22174A0602019-12-20020 December 2019 Ile RO and SRO ES-301-1 BW190114, Ile Outline Submittal Letter2019-12-16016 December 2019 Ile Outline Submittal Letter ML22173A2592019-12-16016 December 2019 Bwd 2020 Ile Proposed Operating Test Submittal Letter ML19329A0482019-11-22022 November 2019 Revised Confirmation of Initial License Examination (Rdb) ML19294A7822019-10-21021 October 2019 Confirmation of Initial License Examination ML19277H0032019-06-19019 June 2019 2019 Braidwood Ile Form ES-301-3 ML19277G9232019-06-19019 June 2019 2019 Braidwood Ile Forms ES-301-6 Rev 1 2023-08-25
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23234A2462023-08-25025 August 2023 Confirmation of Initial License Examination RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22199A1732022-04-0505 April 2022 Ile ES-201-3 Security Agreement-Final ML22199A1742022-04-0505 April 2022 Ile ES-403-1 Written Exam Grading Quality Checklist ML22199A1702022-04-0505 April 2022 Ile ES-201-1 Examination Prep Checklist BW220023, Ile Post-Examination Submittal Letter (03/30/2022)2022-03-30030 March 2022 Ile Post-Examination Submittal Letter (03/30/2022) RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22053A0692022-02-23023 February 2022 Operator Licensing Examination Approval ML22199A2532022-02-22022 February 2022 Ile ES-301-5 Transient and Event Checklists ML22199A2472022-02-22022 February 2022 Ile ES-201-2 NRC-Developed Outline Quality Checklist-Signed ML22199A2342022-02-18018 February 2022 ES-401-6 Written Exam Quality Checklist ML22199A2272022-02-18018 February 2022 ES-301-3 and ES-301-4 Op Test Quality Checklists ML22199A2302022-02-18018 February 2022 ES-301-6 Competencies Checklists ML21224A2432021-08-17017 August 2021 Confirmation of Initial License Examination ML22173A2282020-07-17017 July 2020 Bwd 2020 Ile ES-201-1 Rev 11-Final ML22173A2372020-07-17017 July 2020 Bwd 2020 Ile ES-401-9 Written Exam Comments-Final ML22173A2292020-07-17017 July 2020 Bwd 2020 Ile Es 201-3 Final ML22173A2302020-07-17017 July 2020 Bwd 2020 Ile Es 403-1 Signed ML22173A2352020-07-17017 July 2020 Bwd 2020 Ile ES-401-4 Record of Rejected KAs Rev 11 ML22173A2332020-07-17017 July 2020 Bwd 2020 Ile ES-301-7 Operating Test Review Comments ML22173A2392020-07-17017 July 2020 Bwd 2020 Ile Outline Comments BW200057, Bwd 2020 Ile Post-Exam Package Cover2020-06-27027 June 2020 Bwd 2020 Ile Post-Exam Package Cover ML22173A2472020-06-0909 June 2020 Bwd 2020 Ile Administered Scenarios-Final ML22173A2432020-06-0909 June 2020 Bwd 2020 Ile Administered RO and SRO Admin JPMs-Final ML22173A2512020-06-0909 June 2020 Bwd 2020 Ile Administered Written Exam with Handout-Final ML22173A2462020-06-0909 June 2020 Bwd 2020 Ile Administered System and Inplant JPMs-Final ML20135H2062020-05-14014 May 2020 Operator Licensing Examination Approval ML22173A2552020-03-11011 March 2020 Es 301-3 Signed ML22173A2622020-03-11011 March 2020 Bwd 2020 Ile Proposed System and Inplant JPMs-Final ML22173A2572020-03-11011 March 2020 Bwd 2020 Ile ES-301-6 Competencies Checklists ML22173A2562020-03-11011 March 2020 Es 301-4 ML22173A2582020-03-11011 March 2020 Bwd 2020 Ile Es 401-6 Signed ML22173A2612020-03-11011 March 2020 Bwd 2020 Ile Proposed RO and SRO Admin JPMs-Final ML22173A2642020-03-11011 March 2020 Bwd 2020 Ile Proposed Written Exam RO-SRO-Final ML22173A2632020-03-11011 March 2020 Bwd 2020 Ile Proposed Simulator Scenarios-Final ML22173A2602020-02-20020 February 2020 Bwd 2020 Ile Proposed Written Exam Submittal Letter ML22174A0602019-12-20020 December 2019 Ile RO and SRO ES-301-1 ML22174A0402019-12-20020 December 2019 Ile ES-301-5 Transient and Event Checklists ML22174A0732019-12-20020 December 2019 Ile ES-D-1s ML22174A0672019-12-20020 December 2019 Ile RO and SRO ES-301-2 ML22174A0692019-12-20020 December 2019 Ile ES-401-2 and 401-3-Final ML22174A0392019-12-20020 December 2019 Ile ES-201-2 Outline Quality Checklist BW190114, Ile Outline Submittal Letter2019-12-16016 December 2019 Ile Outline Submittal Letter ML22173A2592019-12-16016 December 2019 Bwd 2020 Ile Proposed Operating Test Submittal Letter ML19329A0482019-11-22022 November 2019 Revised Confirmation of Initial License Examination (Rdb) ML19294A7822019-10-21021 October 2019 Confirmation of Initial License Examination ML19275H2952019-06-19019 June 2019 2019 Braidwood Ile Form ES-201-1 ML19275H4122019-06-19019 June 2019 2019 Braidwood Ile Form ES-403-1 ML19275H3712019-06-19019 June 2019 2019 Braidwood Ile Form ES-201-3 ML19277H0032019-06-19019 June 2019 2019 Braidwood Ile Form ES-301-3 2023-08-25
[Table view] |
Text
ES-301 Operating Test Quality Checklist Form ES-301-3 Facilit : Braidwood Date of Examination: 5/29/18 0 eratin Test Number: 2018 Initials
- 1. General Criteria a b*
- a. The operating test conforms to the previously approved outline; changes are consistent with sam lin r uirements e.. , 10 CFR 55.45, o erational im ortance, safe function distribution).
- b. There is no day-to-day repetition between this and other operating tests to be administered durin this examination.
- c. Theo eratin test shall not du licate items from the a licants' audit tests see Section D.1.a . .
- d. Overlap with the written examination and between different parts of the operating test is within acce table limits.
- e. It appears that the operating test will differentiate between competent and less-than-competent a licants at the desi nated license level.
- 2. Walkthrough Criteria I --
- a. Each JPM includes the following, as applicable:
initial conditions initiating cues references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time critical by the facility licensee operationally important specific performance criteria that include---
detailed expected actions with exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards restrictions on the se uence of ste s, if a licable
- b. Ensure that any changes from the previously approved systems and administrative walkthrough outlines (Forms ES-301-1 and ES-301-2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last two NRC examinations s ecified on those forms and Form ES-201-2.
- 3. Simulator Criteria I -- I --
The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4, and a co is attached.
a.
b.
- The facility licensee signature is not applicable for NRG-developed tests.
- The inde endent NRC reviewer initials items in column "c"; the chief examiner concurrence is re uired.