Category:License-Operator
MONTHYEARML24149A3122024-05-0707 May 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Final ML24149A2932024-05-0707 May 2024 Ile Form 2.3-1 Examination Outline Quality Checklist ML24149A3862024-04-19019 April 2024 Ile Form 2.1-1 Examination Preparation Checklist ML24149A3852024-04-19019 April 2024 Ile Form 1.3-1 Exam Security Agreement BW240018, Ile Post-Exam Submittal Letter2024-04-0505 April 2024 Ile Post-Exam Submittal Letter ML24149A3472024-03-14014 March 2024 Ile Proposed Exam Submittal Letter ML24149A3442024-03-14014 March 2024 Ile Form 2.3-2 Operating Test Quality Checklist ML24149A3452024-03-14014 March 2024 Ile Form 2.3-4 Written Exam Quality Checklist ML24066A0122024-03-0606 March 2024 Operator Licensing Examination Approval Braidwood Station, Units 1 and 2, March 2024 ML24149A2562023-10-27027 October 2023 Ile Proposed Outline Submittal Letter ML23234A2462023-08-25025 August 2023 Confirmation of Initial License Examination ML23191A8442023-07-10010 July 2023 05000456; 05000457 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22199A1842022-04-0505 April 2022 Outline Recommendations-Submittal Comments ML22199A1732022-04-0505 April 2022 Ile ES-201-3 Security Agreement-Final ML22199A1742022-04-0505 April 2022 Ile ES-403-1 Written Exam Grading Quality Checklist ML22199A1812022-04-0505 April 2022 Ile ES-401-9 Written Examination Review Worksheet ML22199A1702022-04-0505 April 2022 Ile ES-201-1 Examination Prep Checklist ML22199A1792022-04-0505 April 2022 Ile ES-401-4 Rejected KAs ML22199A1762022-04-0505 April 2022 Ile ES-301-7 Operating Test Review Worksheet BW220023, Ile Post-Examination Submittal Letter (03/30/2022)2022-03-30030 March 2022 Ile Post-Examination Submittal Letter (03/30/2022) RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22199A1852022-03-18018 March 2022 Ile Administered RO and SRO Admin Topics JPMs-FINAL ML22199A1912022-03-18018 March 2022 Ile Administered RO and SRO List of Reference Handouts-FINAL ML22199A1902022-03-18018 March 2022 Ile Administered Written Examination-FINAL ML22199A1892022-03-18018 March 2022 Ile Administered Simulator Scenarios-FINAL ML22199A1872022-03-18018 March 2022 Ile Administered Sim and Inplant System JPMs-FINAL ML22053A0692022-02-23023 February 2022 Operator Licensing Examination Approval ML22199A2532022-02-22022 February 2022 Ile ES-301-5 Transient and Event Checklists ML22199A2472022-02-22022 February 2022 Ile ES-201-2 NRC-Developed Outline Quality Checklist-Signed ML22199A2632022-02-22022 February 2022 Ile ES-301-1 Admin Topics Outlines ML22199A2702022-02-22022 February 2022 Ile ES-401-2 and ES-401-3 Written Exam Outlines-Final ML22199A2692022-02-22022 February 2022 Ile ES-301-2 Sim and Inplant System JPM Outlines ML22199A2712022-02-22022 February 2022 Ile ES-D-1s Simulator Scenario Outlines ML22199A2302022-02-18018 February 2022 ES-301-6 Competencies Checklists ML22199A2382022-02-18018 February 2022 Ile Proposed Sim and Inplant System JPMs-FINAL ML22199A2402022-02-18018 February 2022 Ile Proposed Written Examination-FINAL ML22199A2362022-02-18018 February 2022 Ile Proposed RO and SRO Admin Topic JPMs-FINAL ML22199A2272022-02-18018 February 2022 ES-301-3 and ES-301-4 Op Test Quality Checklists ML22199A2392022-02-18018 February 2022 Ile Proposed Simulator Scenarios-FINAL ML22199A2342022-02-18018 February 2022 ES-401-6 Written Exam Quality Checklist ML21224A2432021-08-17017 August 2021 Confirmation of Initial License Examination ML21110A4952021-04-19019 April 2021 GFE Results, March 2021 ML22173A2282020-07-17017 July 2020 Bwd 2020 Ile ES-201-1 Rev 11-Final ML22173A2392020-07-17017 July 2020 Bwd 2020 Ile Outline Comments ML22173A2302020-07-17017 July 2020 Bwd 2020 Ile Es 403-1 Signed ML22173A2332020-07-17017 July 2020 Bwd 2020 Ile ES-301-7 Operating Test Review Comments ML22173A2292020-07-17017 July 2020 Bwd 2020 Ile Es 201-3 Final ML22173A2352020-07-17017 July 2020 Bwd 2020 Ile ES-401-4 Record of Rejected KAs Rev 11 ML22173A2372020-07-17017 July 2020 Bwd 2020 Ile ES-401-9 Written Exam Comments-Final 2024-05-07
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24149A3122024-05-0707 May 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Final ML24149A2932024-05-0707 May 2024 Ile Form 2.3-1 Examination Outline Quality Checklist ML24149A3852024-04-19019 April 2024 Ile Form 1.3-1 Exam Security Agreement ML24149A3862024-04-19019 April 2024 Ile Form 2.1-1 Examination Preparation Checklist BW240018, Ile Post-Exam Submittal Letter2024-04-0505 April 2024 Ile Post-Exam Submittal Letter ML24149A3472024-03-14014 March 2024 Ile Proposed Exam Submittal Letter ML24149A3442024-03-14014 March 2024 Ile Form 2.3-2 Operating Test Quality Checklist ML24149A3452024-03-14014 March 2024 Ile Form 2.3-4 Written Exam Quality Checklist ML24066A0122024-03-0606 March 2024 Operator Licensing Examination Approval Braidwood Station, Units 1 and 2, March 2024 ML24149A2562023-10-27027 October 2023 Ile Proposed Outline Submittal Letter ML23234A2462023-08-25025 August 2023 Confirmation of Initial License Examination RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22199A1812022-04-0505 April 2022 Ile ES-401-9 Written Examination Review Worksheet ML22199A1742022-04-0505 April 2022 Ile ES-403-1 Written Exam Grading Quality Checklist ML22199A1732022-04-0505 April 2022 Ile ES-201-3 Security Agreement-Final ML22199A1702022-04-0505 April 2022 Ile ES-201-1 Examination Prep Checklist ML22199A1762022-04-0505 April 2022 Ile ES-301-7 Operating Test Review Worksheet ML22199A1792022-04-0505 April 2022 Ile ES-401-4 Rejected KAs ML22199A1842022-04-0505 April 2022 Outline Recommendations-Submittal Comments BW220023, Ile Post-Examination Submittal Letter (03/30/2022)2022-03-30030 March 2022 Ile Post-Examination Submittal Letter (03/30/2022) RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22199A1912022-03-18018 March 2022 Ile Administered RO and SRO List of Reference Handouts-FINAL ML22199A1852022-03-18018 March 2022 Ile Administered RO and SRO Admin Topics JPMs-FINAL ML22199A1872022-03-18018 March 2022 Ile Administered Sim and Inplant System JPMs-FINAL ML22199A1892022-03-18018 March 2022 Ile Administered Simulator Scenarios-FINAL ML22199A1902022-03-18018 March 2022 Ile Administered Written Examination-FINAL ML22053A0692022-02-23023 February 2022 Operator Licensing Examination Approval ML22199A2692022-02-22022 February 2022 Ile ES-301-2 Sim and Inplant System JPM Outlines ML22199A2702022-02-22022 February 2022 Ile ES-401-2 and ES-401-3 Written Exam Outlines-Final ML22199A2532022-02-22022 February 2022 Ile ES-301-5 Transient and Event Checklists ML22199A2632022-02-22022 February 2022 Ile ES-301-1 Admin Topics Outlines ML22199A2472022-02-22022 February 2022 Ile ES-201-2 NRC-Developed Outline Quality Checklist-Signed ML22199A2712022-02-22022 February 2022 Ile ES-D-1s Simulator Scenario Outlines ML22199A2302022-02-18018 February 2022 ES-301-6 Competencies Checklists ML22199A2342022-02-18018 February 2022 ES-401-6 Written Exam Quality Checklist ML22199A2392022-02-18018 February 2022 Ile Proposed Simulator Scenarios-FINAL ML22199A2402022-02-18018 February 2022 Ile Proposed Written Examination-FINAL ML22199A2362022-02-18018 February 2022 Ile Proposed RO and SRO Admin Topic JPMs-FINAL ML22199A2382022-02-18018 February 2022 Ile Proposed Sim and Inplant System JPMs-FINAL ML22199A2272022-02-18018 February 2022 ES-301-3 and ES-301-4 Op Test Quality Checklists ML21224A2432021-08-17017 August 2021 Confirmation of Initial License Examination ML22173A2392020-07-17017 July 2020 Bwd 2020 Ile Outline Comments ML22173A2292020-07-17017 July 2020 Bwd 2020 Ile Es 201-3 Final ML22173A2352020-07-17017 July 2020 Bwd 2020 Ile ES-401-4 Record of Rejected KAs Rev 11 ML22173A2332020-07-17017 July 2020 Bwd 2020 Ile ES-301-7 Operating Test Review Comments ML22173A2302020-07-17017 July 2020 Bwd 2020 Ile Es 403-1 Signed ML22173A2282020-07-17017 July 2020 Bwd 2020 Ile ES-201-1 Rev 11-Final ML22173A2372020-07-17017 July 2020 Bwd 2020 Ile ES-401-9 Written Exam Comments-Final BW200057, Bwd 2020 Ile Post-Exam Package Cover2020-06-27027 June 2020 Bwd 2020 Ile Post-Exam Package Cover ML22173A2432020-06-0909 June 2020 Bwd 2020 Ile Administered RO and SRO Admin JPMs-Final 2024-05-07
[Table view] |
Text
ES-301 Operating Test Quality Checklist Form ES-301-3 Facilit : Braidwood Date of Examination: 5/29/18 0 eratin Test Number: 2018
- a.
- b.
- c.
- d.
- 1. General Criteria The operating test conforms to the previously approved outline; changes are consistent with sam lin r uirements e.., 10 CFR 55.45, o erational im ortance, safe function distribution).
There is no day-to-day repetition between this and other operating tests to be administered durin this examination.
Theo eratin test shall not du licate items from the a licants' audit tests see Section D.1.a..
Overlap with the written examination and between different parts of the operating test is within acce table limits.
- e.
It appears that the operating test will differentiate between competent and less-than-competent a
licants at the desi nated license level.
- 2. Walkthrough Criteria
- a.
Each JPM includes the following, as applicable:
initial conditions initiating cues references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time critical by the facility licensee operationally important specific performance criteria that include---
detailed expected actions with exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards restrictions on the se uence of ste s, if a licable
- b.
Ensure that any changes from the previously approved systems and administrative walkthrough outlines (Forms ES-301-1 and ES-301-2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last two NRC examinations s ecified on those forms and Form ES-201-2.
- 3. Simulator Criteria The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4, and a co is attached.
- a.
- b.
- The facility licensee signature is not applicable for NRG-developed tests.
- The inde endent NRC reviewer initials items in column "c"; the chief examiner concurrence is re uired.
Initials a
b*
I --
I -- I --