From:
Schiller, Alina To:
Schichlein, Lisa (GE Power Portfolio); Diaz-Quiroz, Jesus G. (GE Power Portfolio)
Cc:
Wadkins, George (GE Power Portfolio); Shea, Jim; Dudek, Michael; Colaccino, Joseph; Ghosh, Amitava; Lehman, Bryce
Subject:
Verification of the GEH BWRX-300 LTR NEDO-33914-A, BWRX-300 Advanced Civil Construction and Design Approach, Revision 2 Date:
Wednesday, July 13, 2022 12:38:00 PM Attachments:
NRC 896 A TR Verification GEH BWRX-300 LTR NEDO-33914 Rev 2.pdf NRC Staff -A Verification Letter for GEH BWRX-300 LTR Advanced Civil Construction and Design Approach Approved Revision 2.pdf Lisa/Jesus,
In a letter dated July 12, 2022 (NRC Verification Letter ADAMS Accession No. ML22172A141, attached), the NRC staff verified that the submitted -A version is acceptable and is approved for referencing in future licensing applications for the BWRX-300 to the extent specified and under the limitations delineated. In addition, the signed NRC LTR Verification Form 896 is attached.
The -A version will be linked on the NRC BWRX-300 public website.
https://www.nrc.gov/reactors/new-reactors/smr/bwrx-300.html
Sincerely,
Alina Schiller Project Manager Office of Nuclear Reactor Regulation Division of New and Renewed Licenses New Reactor Licensing Branch O-13 C10 301-415-8177