2017 Pal Es 301-3 Operating Test Quality Checklist
ML22167A014
Person / Time
Site: Palisades Entergy icon.png
Issue date: 01/23/2017
From: Randy Baker
NRC/RGN-III/DRS/OLB
To:
Entergy Nuclear Operations
Baker R
Shared Package
ML17037C881 List:
References
Download: ML22167A014 (1)


Text

ES-301 Operating Test Quality Checklist Form ES-301-3 Facility: PALISADES NUCLEAR PLANT Date of Examination: 2/13 - 2/20 2017 Operating Test Number: Nt~ -,1.S-\\7

1. General Criteria Initials a

b"n c#

a.

The operating test conforms to the previously approved outline; changes are consistent with

~ -2:t'B R\\1-\\.l samplinci reQuirements (e.Q., 10 CFR 55.45, ooerational importance, safetv function distribution).

b.

There is no day-to-day repetition between this and other operating tests to be administered during

~ ~"'

this examination.

I~

C.

The operatinci test shall not duplicate items from the applicants' audit test(sl. (see Section D.1.a.)

P'sr:\\ I~ ~

d.

Overlap with the written examination and between different parts of the operating test is within

~.o

~~

acceptable limits.

~

e.

It appears that the operating test will differentiate between competent and less-than-competent

~

~\\N aoolicants at the designated license level.

~

2. Walk-Through Criteria
a.

Each JPM includes the following, as applicable:

. initial conditions initiating cues references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific

~~1/4 designation if deemed to be time-critical by the facility licensee

~

~

operationally important specific performance criteria that include:

detailed expected actions with exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards restrictions on the sequence of steps, if applicable

b.

Ensure that any changes from the previously approved systems and administrative walk-through outlines

~~

(Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g.,

M ~

item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2.

3. Simulator Criteria The associated simulator operating tests (scenario sets) have been reviewed in accordance with

~

8'\\& ~\\U, Form ES-301-4 and a copv is attached.

Printed Name/ Signature Date

a.

Author Randal Dean Baker~ ~ ~

f l/ J.1eµ/ 17

..-=.

.-=::i.

b.

Facility Reviewer(*)

Brvan Beraeon / ~~,.___'

I L.:L<.,Lal..ol-=l-C.

NRC Chief ~xaminer (#)

Ravmond K. Walton/ ~

~ ~ ll27 /zot:f

d.

NRC Supervisor Robert Orlikowski /

jJ/ /Jt\\APA......

j,)201r I

I NOTE:

  • The facility signature is not applicable for NRG-developed tests.
  1. Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.
    • Operating Test Developed as part of Examiner Qualification.