Fer 2020 Ile ES-301-2 RO and SRO Final
ML22158A352
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/21/2020
From:
NRC/RGN-III/DRS/OLB
To:
DTE Energy
Baker R
Shared Package
ML19128A202 List:
References
Download: ML22158A352 (3)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Fermi 2 Date of Examination: 12/7-11/2020 Exam Level: RO SRO-I SRO-U Operating Test Number: 2020-301 Control Room Systems:* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U Safety System/JPM Title Type Code*

Function*

a. Manually Initiate Low-Low Set (Alt Path)

[K/A 239002 A4.01) 4.4 / 4.4 JP-OP-315-0043-406 M, A, S, L 3

b. Rapid Power Reduction (Alt Path)

[K/A 202001 A4.01] 3.7 / 3.7 JP-OP-315-0104-007 D, A, S 1

c. Restore 480V ESF Bus 72B to Normal Power Source - Live Bus Transfer

[K/A 262001 A4.01) 3.4 / 3.7 JP-OP-315-0058-003 D, S, EN, L 6

d. Perform RPS Manual Scram Functional Test

[K/A 212000 A2.03] 3.3 / 3.5 JP-OP-315-0127-101 D, S 7

e. Vent the Drywell

[K/A 295024 EA1.14) 3.4 / 3.5 JP-OP-802-3006-501 M, S 5

f. Startup SBFW System after RFP Trip

[K/A 259001 A4.02) 3.9 / 3.7 JP-OP-315-0118-005 M, S 2

g. Depressurize the RPV using RCIC (Alt Path)

[K/A 217000 A1.04) 3.6 / 3.6 JP-OP-315-0043-406 D, A, S 4

h. Respond to Refuel Floor High Radiation (Alt. Path)

[K/A 272000 A2.12] 3.3 / 4.0 JP-OP-315-0150-401 D, A, S 9 In-Plant Systems:* 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U

i. Vent the Scram Air Header

[K/A 295015 AA1.01] 3.8 / 3.9 D, E, R 1 JP-OP-802-3006-309

j. Manually Initiate EDG CO2 (Alt Path)

[K/A 286000 A2.08) 3.2 / 3.3 JP-OP-315-0272-401 D, A 8

k. Place Spare ESF Battery Charger in service M, R 6

[K/A 263000 K1.02] 3.2 I 3.3 JP-OP-315-0064-005

  • All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.
  • Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path 4-6/4-6 /2-3 (C)ontrol room (D)irect from bank 9/ 8/ 4 (E)mergency or abnormal in-plant 1/ 1/ 1 (EN)gineered safety feature 1/ 1/ 1 (control room system)

(L)ow-Power/Shutdown 1/ 1/ 1 (N)ew or (M)odified from bank including 1(A) 2/ 2/ 1 (P)revious 2 exams 3/ 3/ 2 (randomly selected)

(R)CA 1/ 1/ 1 (S)imulator

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Fermi 2 Date of Examination: 12/7-11/2020 Exam Level: RO SRO-I SRO-U Operating Test Number: 2020-301 Control Room Systems:* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U Safety System/JPM Title Type Code*

Function*

a. Manually Initiate Low-Low Set (Alt Path)

[K/A 239002 A4.01) 4.4 / 4.4 JP-OP-315-0043-406 M, A, S, L 3

b. Rapid Power Reduction (Alt Path)

[K/A 202001 A4.01] 3.7 / 3.7 JP-OP-315-0104-007 D, A, S 1

c. Restore 480V ESF Bus 72B to Normal Power Source - Live Bus Transfer

[K/A 262001 A4.01) 3.4 / 3.7 JP-OP-315-0058-003 D, S, EN, L 6

d. Perform RPS Manual Scram Functional Test

[K/A 212000 A2.03] 3.3 / 3.5 JP-OP-315-0127-101 D, S 7

e. Vent the Drywell

[K/A 295024 EA1.14) 3.4 / 3.5 JP-OP-802-3006-501 M, S 5

f. Startup SBFW System after RFP Trip

[K/A 259001 A4.02) 3.9 / 3.7 JP-OP-315-0118-005 M, S 2

g. Depressurize the RPV using RCIC (Alt Path)

[K/A 217000 A1.04) 3.6 / 3.6 JP-OP-315-0043-406 D, A, S 4

h. N/A N/A N/A In-Plant Systems:* 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U
i. Vent the Scram Air Header

[K/A 295015 AA1.01] 3.8 / 3.9 D, E, R 1 JP-OP-802-3006-309

j. Manually Initiate EDG CO2 (Alt Path)

[K/A 286000 A2.08) 3.2 / 3.3 JP-OP-315-0272-401 D, A 8

k. Place Spare ESF Battery Charger in service M, R 6

[K/A 263000 K1.02] 3.2 I 3.3 JP-OP-315-0064-401

  • All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.
  • Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path 4-6/4-6 /2-3 (C)ontrol room (D)irect from bank 9/ 8/ 4 (E)mergency or abnormal in-plant 1/ 1/ 1 (EN)gineered safety feature 1/ 1/ 1 (control room system)

(L)ow-Power/Shutdown 1/ 1/ 1 (N)ew or (M)odified from bank including 1(A) 2/ 2/ 1 (P)revious 2 exams 3/ 3/ 2 (randomly selected)

(R)CA 1/ 1/ 1 (S)imulator

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Fermi 2 Date of Examination: 12/7-11/2020 Exam Level: RO SRO-I SRO-U Operating Test Number: 2020-301 Control Room Systems:* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U Safety System/JPM Title Type Code*

Function*

a. Manually Initiate Low-Low Set (Alt Path)

[K/A 239002 A4.01) 4.4 / 4.4 JP-OP-315-0043-406 M, A, S, L 3

b. N/A N/A N/A
c. Restore 480V ESF Bus 72B to Normal Power Source - Live Bus Transfer

[K/A 262001 A4.01) 3.4 / 3.7 JP-OP-315-0058-003 D, S, EN, L 6

d. N/A N/A N/A
e. Vent the Drywell

[K/A 295024 EA1.14) 3.4 / 3.5 JP-OP-802-3006-501 M, S 5

f. N/A N/A N/A
g. N/A N/A N/A
h. N/A N/A N/A In-Plant Systems:* 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U
i. Vent the Scram Air Header

[K/A 295015 AA1.01] 3.8 / 3.9 D, E, R 1 JP-OP-802-3006-309

j. Manually Initiate EDG CO2 (Alt Path)

[K/A 286000 A2.08) 3.2 / 3.3 JP-OP-315-0272-401 D, A 8

k. N/A N/A N/A
  • All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.
  • Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path 4-6/4-6 /2-3 (C)ontrol room (D)irect from bank 9/ 8/ 4 (E)mergency or abnormal in-plant 1/ 1/ 1 (EN)gineered safety feature 1/ 1/ 1 (control room system)

(L)ow-Power/Shutdown 1/ 1/ 1 (N)ew or (M)odified from bank including 1(A) 2/ 2/ 1 (P)revious 2 exams 3/ 3/ 2 (randomly selected)

(R)CA 1/ 1/ 1 (S)imulator