MONTHYEARIR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23213A0302023-08-11011 August 2023 Form 5.1-1 Postexamination Check Sheet ML23212A8732023-07-31031 July 2023 Form 1.3-1 Examination Security Checklist ML23200A2182023-06-28028 June 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Final ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis ML23200A2572023-06-19019 June 2023 Form 2.1-1 Examination Prep Checklist ML23200A2562023-06-19019 June 2023 IP 21 Operator Licensing Exam Schedule ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23200A1852023-06-0202 June 2023 Form 2.3-2 Operating Test Quality Checklist ML23200A1862023-06-0202 June 2023 Form 2.3-4 Written Exam Quality Checklist ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 ML23200A2212023-02-0808 February 2023 Form 2.3-1 Outline Quality Checklist ML23200A2162023-01-20020 January 2023 Outline Submittal Letter ML23200A2172023-01-20020 January 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Draft ML22322A1082022-11-18018 November 2022 Confirmation of Initial License Examination ML21258A0602021-09-15015 September 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21327A1702021-06-16016 June 2021 ES-401-6 ML21327A4272021-06-16016 June 2021 Post Exam Submittal Letter ML21327A4252021-06-16016 June 2021 ES-403-1 ML21327A4242021-06-16016 June 2021 ES-201-3 ML21327A4212021-06-16016 June 2021 ES-201-1 ML21327A1062021-06-16016 June 2021 Proposed Exam Submittal Letter ML21327A1042021-06-16016 June 2021 ES-301-4 ML21327A0952021-06-16016 June 2021 ES-301-3 ML21327A0922021-06-16016 June 2021 ES-301-6 ML21326A1242021-06-16016 June 2021 Licensee Outline Submittal Letter ML21326A1212021-06-16016 June 2021 ES-301-5 ML21326A1202021-06-16016 June 2021 ES-201-2 ML21327A3362021-06-16016 June 2021 Handouts to Applicants (Summary) ML21327A3262021-06-16016 June 2021 Administered Written Exam with Answer Key ML21328A1382021-06-16016 June 2021 Proposed Admin JPMs ML21327A3212021-06-16016 June 2021 Administered Scenarios ML21328A1622021-06-16016 June 2021 Proposed Control Room and In-Plant JPMs ML21328A1642021-06-16016 June 2021 Proposed Scenarios ML21328A1662021-06-16016 June 2021 Proposed Written Exam with Answer Key ML21327A3082021-06-16016 June 2021 Administered Admin JPMs ML21327A3422021-06-16016 June 2021 Modified Question Source Information ML21327A3142021-06-16016 June 2021 Administered Control Room and In-Plant JPMs ML21120A0202021-05-0303 May 2021 Operator Licensing Examination Approval IR 05000341/20203022021-03-18018 March 2021 NRC Initial License Examination Report 05000341/2020302 ML22158A1462021-02-0505 February 2021 Fer 2020 Ile ES-301-7 Operating Test Review Worksheet-Final ML22158A1302021-02-0505 February 2021 Fer 2020 ES-201-1 Rev 11 ML22158A1332021-02-0505 February 2021 Fer 2020 Ile Final Es 201-3 ML22158A1382021-02-0505 February 2021 Fer 2020 Ile Es 403-1 RO-SRO Written Exam Grading Quality Checklist ML22158A1582021-02-0505 February 2021 Fer 2020 Ile NRC ES-401-4 Record of Rejected KAs Rev 11 2023-08-16
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23213A0302023-08-11011 August 2023 Form 5.1-1 Postexamination Check Sheet ML23212A8732023-07-31031 July 2023 Form 1.3-1 Examination Security Checklist ML23200A2182023-06-28028 June 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Final ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis ML23200A2572023-06-19019 June 2023 Form 2.1-1 Examination Prep Checklist ML23200A2562023-06-19019 June 2023 IP 21 Operator Licensing Exam Schedule ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23200A1852023-06-0202 June 2023 Form 2.3-2 Operating Test Quality Checklist ML23200A1862023-06-0202 June 2023 Form 2.3-4 Written Exam Quality Checklist ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 ML23200A2212023-02-0808 February 2023 Form 2.3-1 Outline Quality Checklist ML23200A2162023-01-20020 January 2023 Outline Submittal Letter ML23200A2172023-01-20020 January 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Draft ML22322A1082022-11-18018 November 2022 Confirmation of Initial License Examination ML21258A0602021-09-15015 September 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21327A1702021-06-16016 June 2021 ES-401-6 ML21326A1202021-06-16016 June 2021 ES-201-2 ML21326A1212021-06-16016 June 2021 ES-301-5 ML21326A1242021-06-16016 June 2021 Licensee Outline Submittal Letter ML21327A0922021-06-16016 June 2021 ES-301-6 ML21327A0952021-06-16016 June 2021 ES-301-3 ML21327A1042021-06-16016 June 2021 ES-301-4 ML21327A1062021-06-16016 June 2021 Proposed Exam Submittal Letter ML21327A4212021-06-16016 June 2021 ES-201-1 ML21327A4242021-06-16016 June 2021 ES-201-3 ML21327A4252021-06-16016 June 2021 ES-403-1 ML21327A4272021-06-16016 June 2021 Post Exam Submittal Letter ML21327A3362021-06-16016 June 2021 Handouts to Applicants (Summary) ML21327A3262021-06-16016 June 2021 Administered Written Exam with Answer Key ML21327A3212021-06-16016 June 2021 Administered Scenarios ML21327A3142021-06-16016 June 2021 Administered Control Room and In-Plant JPMs ML21327A3082021-06-16016 June 2021 Administered Admin JPMs ML21328A1662021-06-16016 June 2021 Proposed Written Exam with Answer Key ML21328A1642021-06-16016 June 2021 Proposed Scenarios ML21328A1622021-06-16016 June 2021 Proposed Control Room and In-Plant JPMs ML21327A3422021-06-16016 June 2021 Modified Question Source Information ML21328A1382021-06-16016 June 2021 Proposed Admin JPMs ML21120A0202021-05-0303 May 2021 Operator Licensing Examination Approval IR 05000341/20203022021-03-18018 March 2021 NRC Initial License Examination Report 05000341/2020302 ML22158A1582021-02-0505 February 2021 Fer 2020 Ile NRC ES-401-4 Record of Rejected KAs Rev 11 ML22158A1382021-02-0505 February 2021 Fer 2020 Ile Es 403-1 RO-SRO Written Exam Grading Quality Checklist ML22158A1332021-02-0505 February 2021 Fer 2020 Ile Final Es 201-3 ML22158A1302021-02-0505 February 2021 Fer 2020 ES-201-1 Rev 11 ML22158A1642021-02-0505 February 2021 Ile Outline Review Comments 2023-08-16
[Table view] |
Text
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Fermi 2 Date of Examination: 12/7-11/2020 Exam Level: RO SRO-I SRO-U Operating Test Number: 2020-301 Control Room Systems:* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U Safety System/JPM Title Type Code*
Function*
- a. Manually Initiate Low-Low Set (Alt Path)
[K/A 239002 A4.01) 4.4 / 4.4 JP-OP-315-0043-406 M, A, S, L 3
- b. Rapid Power Reduction (Alt Path)
[K/A 202001 A4.01] 3.7 / 3.7 JP-OP-315-0104-007 D, A, S 1
- c. Restore 480V ESF Bus 72B to Normal Power Source - Live Bus Transfer
[K/A 262001 A4.01) 3.4 / 3.7 JP-OP-315-0058-003 D, S, EN, L 6
- d. Perform RPS Manual Scram Functional Test
[K/A 212000 A2.03] 3.3 / 3.5 JP-OP-315-0127-101 D, S 7
- e. Vent the Drywell
[K/A 295024 EA1.14) 3.4 / 3.5 JP-OP-802-3006-501 M, S 5
- f. Startup SBFW System after RFP Trip
[K/A 259001 A4.02) 3.9 / 3.7 JP-OP-315-0118-005 M, S 2
- g. Depressurize the RPV using RCIC (Alt Path)
[K/A 217000 A1.04) 3.6 / 3.6 JP-OP-315-0043-406 D, A, S 4
- h. Respond to Refuel Floor High Radiation (Alt. Path)
[K/A 272000 A2.12] 3.3 / 4.0 JP-OP-315-0150-401 D, A, S 9 In-Plant Systems:* 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U
- i. Vent the Scram Air Header
[K/A 295015 AA1.01] 3.8 / 3.9 D, E, R 1 JP-OP-802-3006-309
- j. Manually Initiate EDG CO2 (Alt Path)
[K/A 286000 A2.08) 3.2 / 3.3 JP-OP-315-0272-401 D, A 8
- k. Place Spare ESF Battery Charger in service M, R 6
[K/A 263000 K1.02] 3.2 I 3.3 JP-OP-315-0064-005
- All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path 4-6/4-6 /2-3 (C)ontrol room (D)irect from bank 9/ 8/ 4 (E)mergency or abnormal in-plant 1/ 1/ 1 (EN)gineered safety feature 1/ 1/ 1 (control room system)
(L)ow-Power/Shutdown 1/ 1/ 1 (N)ew or (M)odified from bank including 1(A) 2/ 2/ 1 (P)revious 2 exams 3/ 3/ 2 (randomly selected)
(R)CA 1/ 1/ 1 (S)imulator
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Fermi 2 Date of Examination: 12/7-11/2020 Exam Level: RO SRO-I SRO-U Operating Test Number: 2020-301 Control Room Systems:* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U Safety System/JPM Title Type Code*
Function*
- a. Manually Initiate Low-Low Set (Alt Path)
[K/A 239002 A4.01) 4.4 / 4.4 JP-OP-315-0043-406 M, A, S, L 3
- b. Rapid Power Reduction (Alt Path)
[K/A 202001 A4.01] 3.7 / 3.7 JP-OP-315-0104-007 D, A, S 1
- c. Restore 480V ESF Bus 72B to Normal Power Source - Live Bus Transfer
[K/A 262001 A4.01) 3.4 / 3.7 JP-OP-315-0058-003 D, S, EN, L 6
- d. Perform RPS Manual Scram Functional Test
[K/A 212000 A2.03] 3.3 / 3.5 JP-OP-315-0127-101 D, S 7
- e. Vent the Drywell
[K/A 295024 EA1.14) 3.4 / 3.5 JP-OP-802-3006-501 M, S 5
- f. Startup SBFW System after RFP Trip
[K/A 259001 A4.02) 3.9 / 3.7 JP-OP-315-0118-005 M, S 2
- g. Depressurize the RPV using RCIC (Alt Path)
[K/A 217000 A1.04) 3.6 / 3.6 JP-OP-315-0043-406 D, A, S 4
- h. N/A N/A N/A In-Plant Systems:* 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U
- i. Vent the Scram Air Header
[K/A 295015 AA1.01] 3.8 / 3.9 D, E, R 1 JP-OP-802-3006-309
- j. Manually Initiate EDG CO2 (Alt Path)
[K/A 286000 A2.08) 3.2 / 3.3 JP-OP-315-0272-401 D, A 8
- k. Place Spare ESF Battery Charger in service M, R 6
[K/A 263000 K1.02] 3.2 I 3.3 JP-OP-315-0064-401
- All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path 4-6/4-6 /2-3 (C)ontrol room (D)irect from bank 9/ 8/ 4 (E)mergency or abnormal in-plant 1/ 1/ 1 (EN)gineered safety feature 1/ 1/ 1 (control room system)
(L)ow-Power/Shutdown 1/ 1/ 1 (N)ew or (M)odified from bank including 1(A) 2/ 2/ 1 (P)revious 2 exams 3/ 3/ 2 (randomly selected)
(R)CA 1/ 1/ 1 (S)imulator
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Fermi 2 Date of Examination: 12/7-11/2020 Exam Level: RO SRO-I SRO-U Operating Test Number: 2020-301 Control Room Systems:* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U Safety System/JPM Title Type Code*
Function*
- a. Manually Initiate Low-Low Set (Alt Path)
[K/A 239002 A4.01) 4.4 / 4.4 JP-OP-315-0043-406 M, A, S, L 3
- b. N/A N/A N/A
- c. Restore 480V ESF Bus 72B to Normal Power Source - Live Bus Transfer
[K/A 262001 A4.01) 3.4 / 3.7 JP-OP-315-0058-003 D, S, EN, L 6
- d. N/A N/A N/A
- e. Vent the Drywell
[K/A 295024 EA1.14) 3.4 / 3.5 JP-OP-802-3006-501 M, S 5
- f. N/A N/A N/A
- g. N/A N/A N/A
- h. N/A N/A N/A In-Plant Systems:* 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U
- i. Vent the Scram Air Header
[K/A 295015 AA1.01] 3.8 / 3.9 D, E, R 1 JP-OP-802-3006-309
- j. Manually Initiate EDG CO2 (Alt Path)
[K/A 286000 A2.08) 3.2 / 3.3 JP-OP-315-0272-401 D, A 8
- k. N/A N/A N/A
- All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path 4-6/4-6 /2-3 (C)ontrol room (D)irect from bank 9/ 8/ 4 (E)mergency or abnormal in-plant 1/ 1/ 1 (EN)gineered safety feature 1/ 1/ 1 (control room system)
(L)ow-Power/Shutdown 1/ 1/ 1 (N)ew or (M)odified from bank including 1(A) 2/ 2/ 1 (P)revious 2 exams 3/ 3/ 2 (randomly selected)
(R)CA 1/ 1/ 1 (S)imulator